HomeMy WebLinkAboutIKO Cambridge Shingles HighlightedProfessional
Regulation
® l.-
N
acts Home Log in Uw Reginnabon Not Topes Submit Scaba.ge Stan a rout. Publicadom contact us alis Site Mao Ll ki, Seaab
dbpr �xRgub
Approval
it Uur
Comments
Archived
Product Manufacturer
Address/Phone/Email
Authorized Signature
Technical Representative
Address/Phone/Email
Quality Assurance Representative
Address/Phone/Email
Category
Subcategory
Compliance Method
Certification Agency
Validated By
Referenced Standard and Year (of Standard)
Equivalence of Product Standards
Certified By
IKO Industnes Ltd
0`40 Hansen Road South
Brampton, NON -US LBW 3114
(905)457-2880 Ext 4581
william.ilu@iko.com
William Liu
william.liu@iko.com
Bob Metz
REMCO of Pinellas
456 Avila Circle NE
Saint Petersburg, FL 33703
(727) 776-5261
i metz0010tampabay.m.com
Don Shaw
IKO Industries LTD
120 Hay Rd.
Wilmington, DE 19808
(717) 579-6706
don.sha W @iko.com
Roofing
Asphalt Shingles
Certification Mark or Listing
FM Approvals
Locke Bowden P.E.
Validation Checklist - Hardcopy Received
Standard
ASTM D3161 modified to 110 mph
ASTM D3462
ASTM D7158 Class H
ASTM E108
YAW
2016
2010
2011
2011
PmduQ Aaomvgl Menu > PloovQ or ARpI cation search
> ayyLRIL UA > Appllcauon Datall
FL a
%R30
Application lVpe
Revision
Code Version
p17
Application Status
Approved
"Approved by DBPR. Approvals by DBPR shall be reviewed and ratified by
the POC and/or the Commission if necessary.
Comments
Archived
Product Manufacturer
Address/Phone/Email
Authorized Signature
Technical Representative
Address/Phone/Email
Quality Assurance Representative
Address/Phone/Email
Category
Subcategory
Compliance Method
Certification Agency
Validated By
Referenced Standard and Year (of Standard)
Equivalence of Product Standards
Certified By
IKO Industnes Ltd
0`40 Hansen Road South
Brampton, NON -US LBW 3114
(905)457-2880 Ext 4581
william.ilu@iko.com
William Liu
william.liu@iko.com
Bob Metz
REMCO of Pinellas
456 Avila Circle NE
Saint Petersburg, FL 33703
(727) 776-5261
i metz0010tampabay.m.com
Don Shaw
IKO Industries LTD
120 Hay Rd.
Wilmington, DE 19808
(717) 579-6706
don.sha W @iko.com
Roofing
Asphalt Shingles
Certification Mark or Listing
FM Approvals
Locke Bowden P.E.
Validation Checklist - Hardcopy Received
Standard
ASTM D3161 modified to 110 mph
ASTM D3462
ASTM D7158 Class H
ASTM E108
YAW
2016
2010
2011
2011
Product Approval Method Method 1 Option A
Date Submitted 10/08/2017
Date Validated 10/30/2017
Date Pending FBC Approval
Date Approved 11/01/2017
summa of Products
�-
FL a' Model, Number or Name
Description
6.1i Gmbridge, Cambridge HD, &Yore
Laminated architectural fiberglass asphalt shingle
TTTTTT and Bikmom HD
manufactured at IKO's Kankakee, IL; Hawkesbury, Ont.;
Wilmington, DE; Sylacauga,AL and Toronto, Ont. plants
Limits of Use
Certification Agency Certificate
Approved for use in HVHZ: Yes
FL7006 RIO C CACLetter • ASTM D3161 letter - (2=2L -
Approved for use outside HVHZ: Yes
2_QI_Z) from F
Impact Resistant: N/A
FL7006 RIO C CAC Letter - ASTM D3462 letter - (0 -26 -
Design Pressure: N/A
2017),&f
Other:
FL7006 RIO C CAC Letter - ASTM E108 letter - f226-
7006.2 Hip and Ridge 12 Cap
I
�Limits, of Use
Approved for use In HVHZ: Yes
Approved for use outside HVHZ: Yes
Impact Resistant: N/A
Design Pressure: N/A
Other:
7006 i Leading Edge Plus Asphalt Shingle
Starter Strip
Limits of Use
Approved for use in HVHZ: ves
Approved for use outside HVHZ: Yes
impact Resistant: N; A
Design Pressure: N,A
Other:
2 17),R9f
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructions
FL 7006 li II IKO-187-02-01 Letter - Installation
Instructions for FBC FL7(06.odf
Verified By: Duc T Nguyen 65034
Created by Independent Third Party: No
Evaluation Reports
Created by Independent Third Party:
This is a 12" x 12" fiberglass asphalt shingle used to cover the
hip and/or ridge of an asphalt shingle roof system
manufactured at TKO's Kankakee, IL, Toronto, Ont. and
Brampton, Ontario plants.
CertHlcation Agency Certificate
F1 7006 RIO C CAC ASTM D 3462 - Shinale letter
Surveillance Audit Location - f6-28-2017),gdf
Fl7006 RI O C CAC Letter - ASTM D3161 letter - (2-26-
2(117) from FM.odf
FL7006 (225=
2017).R9Lf
FL7006 RIO C CAC Letter - ASTM E108 letter - (2-Z -
Zw)AX
Quality Assurance Contract Expiration Date
12/31/2020
Installation Instructions
Ft 7006 RIO II Hig and Ridoe Cao Shingle Installation
Imtr,c Wr s.odf
FL7006 RIn II IKO-187-02-01 Letter - Installation
Instructions for FBC FL7006.odf
Verified By: Duc T Nguyen PE 65034
Created by Independent Third Party: No
Evaluation Reports
Created by Independent Third Party:
One piece fiberglass asphalt Shingle used as a starter strip at
the bottom of a roof system manufactured In Brampton and
Hawkesbury, Ontario plants
Certificaftlon Agency Certificate
FL7006 RIO C CAC Letter - ASTM D3161 letter - (9-26-
2017) from FMjwf
FL7006 RIO C CAC Letter - ASTM 03462 letter - (9-26-
2012L=
F17006 RIO C CAC Letter - ASTM E108 letter - (2m26-
ZQUL119fi
Quality Assurance Contract Expiration Data
12/31/2020
Installation Instructions
FL7006 RIO Il IKO-107-02-01 Letter- Installation
Instructions for FBC FL7006.odf
FL7006 RIO II Roofing-prQgMa-Leading-Egge PIUS-
Application-ENf1)j&
Verified By: Duc T Nguyen PE 65034
Created by Independent Third Party: No
Evaluation Reports
Created by Independent Third Party:
7006.4 Marathon Plus AR, Superglass Plus 3 tab fiberglass asphalt shingle manufactured at TKO's
AR Brampton, Ontario, Hawkesbury Ont., Toronto, Ont.;
Sylacauga, AL and Kankakee, IL plants
Limits of Use
Approved for use In HVHZ: Yes
Approved for use outside HVHZ: Yes
Impact Resistant: N/A
Design Pressure: N/A
Other:
Certification Agency Certificate
FL7006 R10 C CAC Letter - ASTM D3161 letter -
2017) from FM.Ddf
F1 7006 RIO C car Letter - ASTM D3462 letter - (9-26-
7 17),Rlif
F 7006 R10 r CACLetter - ASTM E108letter -(2j -
Z017Lw
Quality Assurance Contract Expiration Date
12/20/2020
Installation Instructions
Instructions for FBC FL7006.odf
Verified By: Cut T Nguyen 65034
Created by Independent Third Party: No
Evaluation Reports
Created by Independent Third Party:
Contact Us:: 2601 Bills, stone Road, (allarassee FL JZa99 Mone: ON -4a/-1824
The Stene of Mich b en ~EEO emolover. LpgYnvht 1001 1013 State of Fantle :. Q6ypb Statement :. Accaes, Wn, Statement :: Refund Statemen[
Under Fiords sow. email addresses are WNk records, Ir you 00 not want yh r a -map address rtleMed m fastener to a publl[+Kord. request. do not no electrmIc
mail to this entity. Instead, contact tete Mice by phone or by traditional mail. If you have any questions, please contact 850.487.1395. 'pursuant to section 455.]75(1).
Famous statutes, effective October t. 1012, licences licensed under Chapter 455. F.S. must provide the Department with an email address if they have one. The amuse
prpvlded may, be used toc,alM1nal mmmumcatlon wah Me bcensee. However email add,.. are pubhc record. If you do rat .., 1. supply a personal address, please
fervid. the n•nartment wird an ..all address whim ran be made aVallable to the public. To determine if you are a (Renee under Chapter 455. F S. please click h
produce Approval AMni
KI wo
KY'DrIIYMkTRIt �
AP -1000t
CONSTRUCTION MATERIALS
T E C H N O L O G I E S
October 27, 2017
IKO Industries, Ltd
120 Hay Rd.
Wilmington, DE 19809
Re: FBC FL7006
Sir(s),
PRI Construction Materials Technologies has completed a technical review and attached sealed shingle
instructions in compliance the 2017 Florida Building Code.
This review was completed based on the receipt of following evidence from IKO Industries, Ltd:
1) IKO Shingle Application Instructions — 3 -Tab Shingles
(EN-3Tab_Appins_8AGXEFS-2012-11 reformatted 2013-02-rev07/13-Florida)
2) IKO Laminated Shingles Application Instructions
(EN-Laminated_Appins_8TTEFS-2012-04 reformatted 2013-02-rev07/13-Florida)
3) IKO Hip and Ridge 12 Application Instructions
(EN-HipandRidgel2_3HRTri-2013.08_reformatted 2013-08)
4) IKO Leading Edge Plus Shingle Application Instructions
(EN-3LEP-Tri-2012-06_reformatted 2013-03)
5) ASTM D3161 Test Report (FM Approvals Project No. 3040947)
The attached instructions should be used in conjunction with the published manufacturer's application
instructions and applicable code. In the event the instructions conflict, these instructions shall govern.
Statement of Independence: PRI Construction Materials Technologies and/or DucT. Nguyen, FL P.E. do not
have nor plan to acquire a financial interest in any company manufacturing or distributing products for which
the test reports are issued.
Signed: Signed:
Brad GayboMski
Managing Director
Date: October 27, 2017 Date:
Attachments: A) IKO Shingle Application Instructions - 3 -Tab
B) IKO Laminated Shingles Application Instructions
C) IKO Hip and Ridge 12 Application Instructions
D) IKO Leading Edge Pius Application Instructions
IKO-187-02-01
� J
Duc T. i u en
Florida Rayl 'rofeaelonal Engineer
P.E. Number: 65034
October 27. 2017
PW Cmswcepn Maenak Taohrobg,ee. LLC. 6412 Badger Nw Taupe. FL 33610 T&813.621 -SM Far. 813-621-5810 e-med maenalaeatng@vow.cmn Wft&W: rap:IMw ,M=tc=
IKO
Installation Instructions for
Asphalt Shingles
Page 2 of 5
IKO Shingle Application Instructions — 3 -Tab Shingles
(ASTM D3161, Class F — IKO Marathon 25 AR and CRC Superglass I'll
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT, THESE INSTRUCTIONS WILL GOVERN.
ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC.
UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is
less than 4" per foot down to 2" per foot, use 2 layers of underlaymenl conforming to building code
requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping
each preceding course by 19" or other Approved underlayments in accordance with the qualified application
instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of
underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long
enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed 6-1/8" above the butt
edge, approx. 1" and 13" from each end and 1/2" above each cutout. Drive nails straight so that nail head is
flush with, but not cutting into shingle surface.
NAILING ON STEEP SLOPES: For steep slopes of 21" per foot (60°) or more; use 6 nails per shingle placed
as shown below. Ensure that no nail is within 2" of a jointicutout of the underlying shingle. Seal down each
shingle at time of application with three 1" diameter (approx. size and thickness of a quarter) spots of asphalt
plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8".
STEEP SLOPES
I
F6119'
AIL! NAILS
DO NOT NAIL INTO OR ABOVE THE SEALING STRIP
PRI CpnstmLtw Malenals TeohndoTa. LLC. 6412 Badger One Tampa FL 33610 Tel 813621.57P Fax -.817.621.5840 o-med wtenalslesbrg&rw1, m WabSte: htl;,) ,plld ow
KO
Installation Instructions for
Asphalt Shingles
Page 3 of 5
IKO Laminated Shingles Application Instructions
(ASTM D3161, Class F — Cambridge, Cambridge HD, and CRC Biltmore AR)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT, THESE INSTRUCTIONS WILL GOVERN.
ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC.
UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is
less than 4" per fool down to 2" per foot, use 2 layers of underlayment conforming to building code
requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping
each preceding course by 19" or other Approved undedayments in accordance with the qualified application
instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of
underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top
of any underlay along rake edges and directly to the deck along eaves in accordance with building code
requirements.
NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long
enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed in the nail line 7-3/8"
below the lop edge, approx. 1" and 13" in from each end. Drive nails straight so that nail head is flush with,
but not cutting into shingle surface.
NAILING ON STEEP SLOPES: For sleep slopes of 21" per foot (60°) or more, use 6 nails per shingle placed
as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seat down each
shingle at time of application with three 1"diameter (approx. size and thickness of a quarter) spots of asphalt
plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle.
Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION. Shingles
should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the
heat of direct sunlight.
EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8".
NAIL LINE
NAILING - STEEP SLOPES APPLICATION
I ISB SIX '41.1% as sh .
CEMENT
PROPER APPLICATION REQUIRES THAT TME NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OF THE SHINGLE
PRI C..MA.Ms TlrM wii LLC. 6412 Badger Dnw Tampa. FL 33510 Tel 813 621-5M Fm 813-621.5840 ii -mal. maMalebebw@Manl.CM We*w. htWAJ .Mantaxr,
IKO
Installation Instructions for
Asphalt Shingles
Page 4 of 5
IKO Hip and Ridge 12 Application Instructions
(ASTM D3161, Class F — IKO Hip and Ridge 12)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION
CONFLICT, THESE INSTRUCTIONS WILL GOVERN.
Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are
designed for a 5 1/8" (130 mm) exposure. (For a neater appearance, the top of each side of each piece has
been factory trimmed on a 1" (25 mm) taper (see drawing). Bend each piece over the hip or ridge, and nail 5
5/8" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing each piece 5 1/8" (130 mm).
Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge
pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end
opposite to the prevailing wind direction and continue to the other end. Note: To obtain a three-dimensional
effect, (which is recommended, but not required), apply hip and ridge shingles double thickness by stacking 2
pieces on top of one another, the lower piece extending about 3/4" (19 mm) further than the top piece (see
diagram). The final shingle should be set in cement, and the exposed nail heads of the final shingle should be
covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for
easier bending.
NOTE: SHINGLES MUST BE APPLIED PROPERLY. THEY ARE DESIGNED FOR USE AS HIP AND RIDGE
SHINGLES ONLY, AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS. WE ASSUME NO
RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO
PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER
VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS. REVIEW
ALL APPLICABLE BUILDING CODES, MINIMUM PROPERTY STANDARDS, AND REQUIREMENTS PRIOR
TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS.
PRI Cmshcem Matenals Tednwli)W. LLC. 6412 WOW Dnn Tampa. Fl. 33610 Tel. 813.621-5777 Fax: 813621-5840 wmal. matenalslasong&p !-= WetAa, mp:l 'Pflmtmm
IKO
Installaton Instructions for
Asphalt Shingles
Page 3 of 3
IKO Leading Edge Plus Application Instructions
(ASTM D3161, Class F — IKO Leading Edge Plus)
NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONDUCTION WITH IKO'S PUBLISHED
APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE, IN THE EVENT THE INSTRUCTION
CONFLICT, THESE INSTRUCTIONS WILL GOVERN.
1. Apply any underlayment, eave protection, valley flashings, or drip edges to roof deck as required.
2. Each 39 3/0"x 131/4" (1000 mm x 336 mm) IKO Leading Edge Plus strip is perforated lengthwise for
separation Into two (2) shingles. Take one IKO Leading Edge Plus strip and fold flat at perforation to
separate.
3. Take one of the separated shingles 39 3/8" x 6 5/8" (1000 mm x 168 mm) and remove approximately
20"(500 mm). Install this shingle on the lower left comer of the roof deck, granule side up, with the
factory installed sealant adjacent to the eaves. The shingle should overhang the rake edge and eaves
by a nominal 114" (6 mm) minimum. Fasten the shingle to the roof deck with nails located 3" to 4"(75
mm to 100 mm) from the eave edge and 1" (25 mm) in from each and.
4. Take the leftover 20" (500 mm) piece shingle. Rotate the piece and align it vertically up the rake edge
with the factory installed sealant adjacent to the outer edge of the roof. The shingle should overhang
the rake edge by a nominal 1/4" (6 mm) minimum. Fasten the shingle to the roof deck with fasteners
located 3" to 4" (75 mm to 100 mm) from the rake edge and 1" (25 mm) in from each end.
5. Repeat Steps 3 — 4 for the right lower corner of the roof deck.
NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least
3/8" (9 mm) diameter heads, long enough to penetrate through plywood or 3/4" (20
mm) into boards. Use 4 nails per shingle placed 3" to 4" (75 mm to 100 mm) from
the save edge and approximately 1" and 13" (25 mm and 330 mm) in from each end.
6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck. Install
the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles
should overhang the rake edge and eaves by a nominal 114" (6 mm) minimum. Fasten the shingles to
the roof deck with nails located 3" to 4" (75 mm to 100 mm) from the save edge, 4 nails per shingle.
7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first
course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way,
the sealant on the IKO Leading Edge Plus shingles will adhere to the first -course field shingles and
help keep them from lifting in high winds.
PRI C"B nM MaiM" Tac IoWn, UC. 6412 saegel Dnw Tamps. FL 33610 TO 813-0215M Fu. 81342158/0 Smell m waWftb @prp. I. webs*. Mtp./M»w.pnum.Wm