Loading...
HomeMy WebLinkAboutGardner- After The Fact Inspection&'-B B ��Engin erin ConsulLants, Inc. 2237 Woods Edge Circle Orlando FL 32817 772 7082171 772 828 2263 Omvermudezra)hotmaiI.com November 05, 2020 AFTER THE FACT FINAL INSPECTION WITH STRUCTURAL CER77FICATION For: I Greg Gardner Residence 11203 Ridge Ave. Ft Pierce Fl 349$ TO: St. Lucie County Building Department Client: ' Onshore Roofing Specialist Inc. 4401 SE Commerce Ave. Stuart Fl. 34990 Permit No. After the fact - Re - Roof for a 5V Crimp 26Ga. Metal Panels. * TU Max Polyglass Underlayment, wood deck Re- nailing with Zac screws anti installation of a 26 Ga. 5V Metal Roof cover. Back round. On November 04, 2020 B & B Engineering Inc. was requested by Onshore Rooting Specialist Inc. a Certified Roofing Contractor to certify the Underlayment and Re- nailing, of the roof sheering re -nailed omitted during the time of its installation. Certification. B & B jEngineering Inc. Certify that the Underlayment did comply with the FBG section 1507.1.1. as well as the sheering' Re- nailing. Prior the installation of a 26 Ga. 5 V metal roof panels FBC Section 1507.4.2 Steel panels that were installed but the Certified Roofing Contractor as per the 2017 FBC. The plywood re -nailing for the above residence roof cover appears properly done. To meet the required wind loading as per ASCE 7-10. and the 2017 F.B.C. with 165 MPH GUST, exposure B, the existing plywood shearing was re-nai led to the existing trusses using Zac screws at 4" on center edge and 6'' center Held. Base 01 the visual inspection, and to the best of our knowledge and professional ability, h is B & B Engine ring Inc. opinion that new roof was properly installed, and with our final inspection, we can certi l� that the new 26 Ga. 5V metal roof panels cover is structural Sound and safe. Limitations. Our pro!'essional services have been performed, our finding obtained, and our opinions prepared in accordance with general accepted structural engineering principles and practices. This Company is not responsible for the conclus ons, opinions or recommendations made by others based on our .findings. The scope of the on-site inspecti n on November 05, 2020, was intended to evaluate the installation of the Underlayinent and the sheeting Re- nailing, ag0.46%V6V6%, structural integrity. 11 • v� C, �. O`'NC0.55141 Oscar . Be64udiz, P&SRY FL Lice nse No "i 1•, �=� O�tpQ.• O 1 • � �/►tttlllit�t