Loading...
HomeMy WebLinkAbout201707-1d Compaction - signedHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net DATE TESTED:KSM JOB #: 201707-1d/SH/jo PERMIT #:NUC #528 CONTRACTOR:Matthew Callahan Nuc Model:MC-1DR-P JOB LOCATION:504 E. Midway Road Nuc Serial #:MD049528 Fort Pierce, Florida ITEM TESTED:Compacted Foundation Fill - Detached Garage TEST LOCATION OF SAMPLE DEPTH PEN READ DRY DENSITY MAX. DRY PROCTOR VALUE (P.C.F) PERCENT COMPACTION 1. S.W.0" - 12"38 106.1 109.4 97.0% 2. Center "39 107.3 "98.1% 3. N.E."38 106.6 "97.4% Soil Description: Brown Sand In Place Moisture: 9.6% Proctor Optimum Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 109.4 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Minimum Requirement for Staked Foundation Respectfully Submitted: Bryan E. Dahlke, P.E. V.P. of Engineering PE # 81439 11/6/2020 Email to: SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 November 6, 2020 2009-0103 Disclaimer:Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Proudly Serving Florida since 1990 106.0 107.0 108.0 109.0 110.0 111.0 9 10 11 12 13 14 15 W E I G H T P . C . F . D R Y Moisture -% of Dry Weight