Loading...
HomeMy WebLinkAboutplan (2)IF THERE ARE NO MARKUPS ON LAYOUT, THEN TRUSSES WILL BE BUILT AS DESIGNED AND CT WILL NOT BE BACK —CHARGED FOR ANY ITEMS FOUND AFTER THE FACT OF THE RETURNED LAYOUT ALL DIMENSIONS AND CONDITIONS THAT EFFECT WD. TRUSSES MUST BE VERIFIED BY BUILDER AND/OR ARCHITECT BEFORE ANY PRODUCTION OF WD. TRUSSES L/ llI O N 9 O N � _ M rn o N 2' 0" \� 1 J1 10e 3A J3 CL E\ OFF \ A 5A J5 o to o M 5 \ \ \ J i0 r 0 2 o 8 \T J A 8 HEN FtR JCL A J5 J3 G G' 00 ADO a 6 J 1 J5 J3 J1 M 4 Lp 3 4 8, 2„ G• INN 00 m 6' On �^ 5 G \� 3 T 1 ZIMtoW W W W CM) r 20' 0" y v T 10" W b . N 2 GAG �O G��. 1 3� 0 N G2 M A A �G' ' G w A J5B �O CD 1< JSY J3X W) 4 w �E• 0 CO `7 5D Z w G 1 w 13B J1 JJ 3 v Z On M _ dry 00 W 6' 0" 1 U m � W U , y✓ 6' 0" ✓ E _ .Z.� M U7 8' 0" T 10" 20-0" 27' 10" VERIFY ALL DIMENSIONS, WALL HGT.s, COL. HGT.s & LOCATION GIRDER LOCATIONS, CLG HGT.s, COFFER CLG. LOCATIONS END DETAILS, PITCH, FASCIA, O.H. & CANT SOME DOWN FRAMING REQ. BY BLC)R. DROP CLG., CEILING CHANGE & COFFER CLG. AREAS APPROVED TRUSS ANCHOR BY BUILDER SQUARE CUT OVERHANG HEEL HEIGHT = 4 1/16" BOTTOM = 2x4 MIN. TOP = 2x4 MIN. TRUSS END DETAIL RECEIVED MAY 0 3 2018 L . Lucie County, Permitting Wind Load Type: - -- - -- LOADS -RC pASCE 7-10 MWFRS iDesign Wind Speed: - -- 170 mph TCLL 3 !Building Type: - - -- Enclosed TCDL 1 - categoryimportance Factor: -- 111.00 BCDL 11 Duration Factor / Floor 1.00 BCLL ' d Building Exposure: rrCrr TOTALI & Truss bottom chord analyzed with 10psf non -concurs 30 psf concurrent live load on trusses designed with s TRUSS HANGER INFORMATI Check TRUSS ENGINEERING for gravity and uplift value: value exceeds the capacity of a hanger shown below, thel the responsibility of the builder to provide a suitable tonne All 2-ply hanger values are based on a 2-ply supporting gi HANGER FL�.�UPLIF � CON OOFKA41 A R 3060 .18 646 D28 2.8 B TH--i 4485 4115, 2330 i 28 C TH026-2 2x6 3355 T2770 2340 Is._D _ _ THDH26.2 L 2x8 5245 4378 Z141 20. E THDH26.3 2x6 5246 '4376 2340 20. F THD28-2 2.11 6005 4310 2595 28. 'G 1 THDH28-2 8025 2x8 7360 3J30 38- H _ THDH28-3 ----2x8 7836 7695 4370 36, I TH046 I 2.6 3776 2840 � 2286 76- 2138 1& J HJC26 2X6 3490 K SKHH46LIR 2x6 2100 1680 1345 12- L SKHH26L/R_ 2x6 1890 1510 18- 2190 M SKHH26L-2JR-2 2x8 _ 2100 1680 896 12- N O _ GTWS2T _ 2x8 10900 8720 8435 22 P GTWS3T 2x8 12470 11100, . 12400 28 Q GTWS4T 2.8 1 12470 11100 t2490 28 R MSTAM241HTWM20I Connection OR EQUAL., by bldr. - _ Is* 6L s T RT16A OR EQUAL Connection by bldr. x 2 RT16A OR '�. Connection by bid'. _ _ 1380 8-01 " 2760 Is..EQUAL Y Z CONNECTOR BY BLDR "IMPORTANT INFORMATIOP ALL REACTIONS, UPLIFTS, ETC. ARE THE RESPON ENGINEER OF RECORD, PER LOCAL CODE. REFER TO 7 FRAMING FOR INFORMATION. CT IS NOT AND WILL RESPONSIBILITY FOR ANY TYPE OF THIS INFOR INFORMATION IS THE SOLE RESPONSIBILITY OF TH RECORD. BEARING HEIGHT DISCLAIMER: IT IS THE SOLE RESPONSIBLITY OF THE ARCHITE( ENGINEER REGARDING BEAM ELEVATIONS AND BREAK CHANGES IN BEAM HEIGHTS. CT BEAM HEIGHT GUIDELINE ONLY. REFER TO ARCHITECTUAL AN DRAWINGS FOR THIS INFORMATION. CT IS NOT AN RESPONSIBLE FOR THIS INFORMATION. FIELD BRACING is not the responsibility of the truss fabricator, Out manufacturer. Persons erecting trusses are cautioned to seek profess! temporary and erection bracing which is always required to prevent tol during erection, and permanent bracing which may be required in Trusses shall be erected and fastened in a straight and plumb positi topchord sheathing is applied, trusses most be braced at 24" on car no direct bottom chord sheathing is applied, trusses must be ton Trusses must be handled with extreme care during erection to prevent injury. Refer to truss engineering for connection an bracing calculations are supplied in order for the ENGINEER OF RECORD to a connection and integration of the roof assembly to the supporting str supporting connections are SOLELY responsible for the integrity of 1 remain our property until paid for in full. Truss layouts and engi reproduced in part or in full under any circumstances. SHOP DRAWING APPROVAI THIS PLACEMENT PLAN MUST BE APPROVED PRIOR T TRUSS ENGINEERING OR FABRICAITON. THE BUILDER M COORDINATION OF ALL THE INFORMATION IN THIS I ARCHITECTURAL OR STRUCTURAL DRAWINGS. AI BETWEEN THE FINAL PLACEMENT PLAN AND THE ARC STRUCTURAL PLAN IS THE SOLE RESPONIBILITY OF ' AND ANY EXPENSES INVOLVED IN CHANGES AFTER TRU, IS THE RESPONSIBILITY OF THE CUSTOM AND NOT CUSI Approved By NOTE: Horizontal and Vertical Truss reactions and uplift calculations are provided by CUSTOM TRUSS LLC., for the JOB ENGINEER OF RECORD to accurately provide support for the ROOF TRUSS SYSTEM and for proper connection of the ROOF TRUSS SYSTEM to the supporting structure. State of Florida Registered Engineer CARL G. FORBES, PE FL.Reg.Nos 20699 555 W. POMPANO PKWY. gI POMPANO BEACH, FL. 33069 I•IAR n (954) 682-6651 Date: Revisions: i CUSTOM TRUSS 1890 W. ATLANTIC AVE. DELRAY BEACH, FL 33444 PH: (954) 786-8800 FAX: (954) 786-8804 JAMIE WHALEN CONSTRUCTH Job Name KOTHAKOTA RES Job Address: 5116 WATERSONG WAY Subdivision: Lot: Blc City: HUTCHINSON FL Drawn By: Job Num File