Loading...
HomeMy WebLinkAboutCompaction soil reportsSoil Nuclear Gauge Report.Date: 4121 /2017 Test Method: ASTM D 6938 Port St Lucie FBPE CA # 4930 521 NW Enterprise Drive Port St Lucie, FL 34986 Phone: 772.924.35751 Fax: 772-924-3580 Client: Cole Construction 11961 Willis Road Fort Pierce„ FL 34945 Project: 17-1025.00 1720 S Brocksmith Road Fort Pierce, Florida Test Results Test # Retest Of _ Test Date Proctor ID - Method Soil Classification Optimum Moisture M) Maximum Dry Density (pcf) In Place Moisture N In Place Dry Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. M Remark 1 4/7/17 P-1 N/A 9.0 120.0 7.3 117.7 12 98 95/105 Pass 2 4/7117 P-1 N/A 9.0 120.0 7.7 118.0 12 98 95 / 105 Pass 3 1 4/7/17 1 P-1 N/A 9.0 1 120.0 1 7.2 1 11822 1 12 1 99 1 95 / 105 Pass Test Information Test # Test Location Elevation Reference Gauge Make / Model / SN Field Technician 1 Below Slab Grade: Foundation pad, southeast comer 0-1 Troxier T3430 22260 Barkley, Mark 2 Below Slab Grade: Foundation pad, center area 0-1 Troxier T3430 22260 Barkley, Mark 3 Below Slab Grade: Foundation pad, northwest comer 0-1 Troxier T3430 22260 Barkley, Mark Remarks Comments Pass: Tests results comply with specifications Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on rile with the testing agency. 1, 2, 3: 1-2, 2-3, 3-4 HCP=40+, > 95 %Compaction, PASS. HCP tests are empiricall correlated to the relative of the soil. s r IL r 0 " `11111111110 W r' �`'��P�'� %QO , ' G E �% ' ,f 675 04I21�A17 r e Vonald W.*1Vloler, P.E. e �roftagltiTig 13d§nefim 675 '-' SRO N E��e+` AL `r�r`frtstt410t�, Test Reports shall not be reproduced, except in full, without the written approval of GFA International Inc. Page 1 of 1 �; Digitally signed printed copies of this.document are not considered signed and sealed and the signature must be verified on any electron ic,copies. 011 Soil Nuclear Gauge Report Date: 4/21/2017 Test Method: ASTM D 6938 Port St Lucie FBPE CA # 4930 521 NW Enterprise Drive Port SL Lucie, FL 34986 Phone: 772-924-35751 Fax: 772-924-3580 Client: Project: Cole Construction 17-1025.00 11961 Willis Road 1720 S Brocksmith Road Fort Pierce„ FL 34945 Fort. Pierce, Florida Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) In Place Moisture (%) In Place Dry Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. (%) Remark 1 417117 P-1 N/A 9.0 120.0 7.3 117.7 12 98 95 / 105 Pass 2 4/7/17 P-1 N/A 9.0 120.0 7.7 118.0 12 98 95 / 105 Pass 3 1 1 4/7/17 1 P-1 N/A 1 9.0 1 120.0 1 7.2 1 118.2 12 99 95 / 105 Pass Test Information Test # Test Location Elevation Reference Gauge Make / Model / SN Field Technician 1 Below Slab Grade: Foundation pad, southeast comer 0-1 Troxler T3430 22260 Barkley, Mark 2 Below Slab Grade: Foundation pad, center area 0-1 Troxler T3430 22260 Barkley, Mark 3 Below Slab Grade: Foundation pad, northwest comer 0-1 Troxier T3430 22260 Barkley, Mark Remarks Comments .Pass: Tests results comply with specifications Tests are 'Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on rile with the testing agency. 1, 2, 3: 1-2, 2-3, 3-4 HCP=40+, > 95 % Compaction, PASS. HCP tests are em ! ically correlated to the relative density of the soil eo Lj1 e a lots. \A E • S�c•:�.p �s Donald W'FMoler, P.E, I trofTE Bd§inegrr,P •:\=°00. sS�Q N Ai. �J"frttottett®�� J ! Test Reports shall not be -reproduced, except in full, without the written approval of GFA International Inc. _ Page 1 of 1 YDigitally signed printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. Port St Lucie FBPE CA # 4930 521 NW Enterprise Drive Port St. Lucie, FL 34986 Phone: 772-924-3575 1 Fax: 772-924.3580 Soil- Nuclear Gauge Client: Project: Report Date; 4121/2017. Cole,Construction 17-1025.00 Test Method: ASTM D 6938 11961 Willis Road 1720 S Brocksmith Road Fort Pierce„ FL 34945 Fort Pierce, Florida Test Results Test # Retest Of Test Date Proctor ID Method Soil Classification Optimum Moisture (%) Maximum Dry Density (pcf) - In Place Moisture (%) In Place Dry Density (pcf) Probe Depth (in) Percent Compaction Min/Max Comp. -(%) Remark 1 4/7/17 P-1 N/A 9.0 120.0 7.3 117.7 12 98 95 / 105 Pass 2 4/7/17 P-1 N/A 9.0 120.0 7.7 118.0 12 98 95 / 105 Pass 3 1 4/7117 1 P-1 I NIA 1 9.0 1 120.0 7.2 1 118.2 1 12 1 99 1 95 / 105 1 Pass Test Information Test # Test Location Elevation Reference Gauge Make I Model I SN Field Technician 1 Below Slab Grade: Foundation pad, southeast comer 0-1 Troxler T3430 22260 Barkley, Mark 2 Below Slab Grade: Foundation pad, center area 0-1 Troxler T3430 22260 Barkley, Mark 3 Below Slab Grade: Foundation pad, northwest comer 0-1 Troxler T3430 22260 Barkley, Mark Remarks Comments Pass: Tests results comply with specifications Tests are "Direct Transmission' (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency. 1, 2, 3: 1-2, 2-3. 3-4 HCP=40+, > 95 % Compaction, PASS. HCP tests are empirically correlated to the relative de i he soil. `aI0tD 6tPrB �o0s X-\ 675 04I2 17 0 Donald WMoler, P.E, I�roffig] ®§neetrre0675 '� • t� f I P•:Zvo f S/O N A1- ee'°% `rF`j11atlEl4A�! • Test Reports shall not be. reproduced, except in full, without the written approval of GFA International IncPage 1 of 1 Digitally signed printed copies of this.document are not considered signed.and sealed and the signature must be verified on any electronic copies.