Loading...
HomeMy WebLinkAbout5711 Eastwood Dr_11-5-2020 (Driveway)GfpIuniversalEngineering S Sciencess Company INSPECTION RESULTS Inspection Date // - S — Zo Project t" Address: Check one: Regular Inspection: ❑ Remspection Date of Initial Inspection Inspection Type Requested (check): Permit No. / 9 /D — O tic S'? BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Pi in & Test HW Pi in & Test ' Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock A liance/ E w ent I Fixtures I Wall & Ceiling Roofing Li tin Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -ins ection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Area Inspected/Code: 1J2i & ,P— w .4 Inspection Results: AP -Approved AE — Approved DA- DP- Not Ready ❑ with Exceptions Disallowed Disapproved Conditions/ Comments 2. 3. 4. 5. 6. 7. Inspector's Name Lic. #: /J A) OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924.3575 • (772) 924.3580 (fax) www.teamgfa.com