Loading...
HomeMy WebLinkAbout5711 Eastwood Dr_11-5-2020 (Pre Power)6f� I Universal ee Enginring S Sciences Company INSPECTION RESULTS Inspection Date // — S - ZD Project de u T ccyL�f / 7� Address: S 7 l/ Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection Inspection Type Requested (check): Permit No. /9 m - O G Snl BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Pi in & Test HW Piping &Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond.Pl ing & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock Appliance/ Equip men t Fixtures Wall & Ceiling Roofing Li htin Protection I Equipment ui ent Re -inspection Re -ins ection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type /� /� Area Inspected/Code: P(L2 - pow ¢ 12 Inspection Results: AP -Approved AE - Approved DA- DP - Not Ready ❑ with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name /�✓ A�� Lic. #: 4.41 Y4 ?9 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924.3575 • (772) 924.3580 (fax) www.teamgfa.com