HomeMy WebLinkAboutCooper - Existing Work Budget REV 11.6.20(8) Auger cast piles8,000$ Pilings Exterior Decks and Railings 21,700$ Wood Staircase and 2nd floor exterior deck with aluminum railings Concrete & Masonry 8,200$ Grade beams and concrete work for stairs and concrete columns Schematic Budget Total 136,235$ Contractor Fee 12,385$ Proposed Work Subtotal 37,900$ Bathroom Accessories 150$ Accessories for the relocated bathroom Plumbing Fixtures 1,500$ Plumbing fixtures for the relocated bathroom Existing Work Subtotal 85,950$ Electrical 6,200$ Electrical per plan LP Gas 2,400$ Install a gas hot water heater in the utility room HVAC 4,800$ Install a new mini-split a/c unit and minor relocation of existing supply drops Plumbing 3,500$ Plumbing per plan Countertops 2,200$ Stone countertop for the cabinetry Main Flooring - Stone Flooring 5,100$ Travertine flooring installed throughought the renovated area Painting 5,200$ Painting of the interior walls, ceilings, trim and doors of the renovated area Stucco $ 1,500 Stucco over door infill and jamb patches at the new coverted garage door french door openings Drywall 4,000$ 1/2" level 4 finish on walls and ceiling Bathroom Shower Tile 2,700$ Stone/porcelain tile for the bathroom shower walls and wet floor Shower Enclosures 1,200$ Frameless glass shower enclosure for the new shower Cabinetry 4,400$ bathroom vanity, laundry cabinets & Impact Exterior Doors 12,600$ (3) sets of impact rated french doors installed into the existing garage door openings Finish Carpentry L and M 5,100$ Poplar 1x base board, casing & MDF interior doors Framing L and M 4,800$ Wood frame non-bearing walls & (1) bearing wall per plan location Demolition 5,600$ Demo per plans Concrete & Masonry $ 7,500 Concrete 5" topping over existing garage floor and the new shower recess work General Conditions 2,000$ Dumpsters, port-o-let, liability insurance Supervision 3,500$ Site supervision Cooper Residence - 6740 S. A1A Renovation Estimate Description Budget Notes