Loading...
HomeMy WebLinkAboutVegetation removal appDATE SUBMITTED: Building Proposed Project: ST. LUCIE COUNTY NOTTCE OF VEGETATION REMOVAL APPLICATION 1. Please complete the requested information and submit to the St. Lucie County Environmental Resources Department or Building & Zoning Department. For additional information, please contact the Environmental Resources Department at (772) 462-2526. Filing this a licaHon does no[ result in an authorization to commence any vegetation removal or alterafion. (in addition to the site plan provided to the Building Department) the plans must accurately depict the location of all proposed buildings, structures, driveways, septic tanks, and other improvements. Incomplete applications will not be accepted in accordance with section 11.OS.Ofi (c) of the St. Lucie County Land Development Code. Within twenty (20) days after an application has been determined to be complete, the Environmental Resources Department shall review the application and approve, approve with conditions, or deny the application, based on the standards set forth in Section 6.00.05 of this Code. Applications requiring a concurrent building permit will be processed within the same twenty (20) day fimeframe, however will not be released until the building permit is also approved. Per Section 11.05.06 b. 6. of the St. Lucie County Land Development Code, the filing of an application shall be deemed to extend permission to the Environmental Resources Duector, or designee; to inspect the subject site for purposes of evaluating the application. Please list any specific information such as a gate code or the necessity of 24 hour notice due to cattle grazing, controlled burns, outside pets, etc. In the event that it is determined that any federal or state protected species is resident on or dependent upon the subject parcel, all development work which might adversely affect that individual species shall cease and stop work. The applicant shall immediately notify the Florida Fish and Wildlife Conservation Commission, U.S. Fish and Wildlife Service, and the County. Appropriate protection to the satisfaction of all parties shall be provided by the applicant prior to resuming development. PROJECT INFORMATION OWNERS NAME: Inddo Holdings LLC OWNERS ADDRESS: 1626 90th Avnue PROJECT LOCATION/ADDRESS: 12200 Angle Road CITY: Ft Pierce STATE: FL ZIP: CONTACT PHONES) #: ssa-4a4-za2z PARCEL SIZE: PROPERTY TAX ID #: t332-211-0002-000-5 OATS CODE (IF APPLICABLE): EMAIL ADDRESS: bartsimon@lowerquestcom CONTACT PHONE NUMBER FOR PERMIT PICK UP: s5a-aaa-zzz CONTRACTOR INFORMATION (IF APPLICABLE): St Lucie Carroty Cade and Compiled Lrnvs requires that this type afwork be done by a licensed contractor. Ifapplyingfa• this permit under the owner✓bailder exemption, see Disclasw•e Statement on page 4. LAND CLEARING CONTRACTOR NAME: N/A ADDRESS: PHONE NUMBER: FLORIDA REG/CERT # ST LUCIE CO. CERT. # BUILDING CONTRACTOR Olin Wayne Companies ADDRESS: 3060 Orange Grove Trail, Naples, F PHONE NUMBER: 954-444-2822 BRIEFLY DESCRIBE THE PROPOSED VEGETATION REMOVAL. INCLUDE LOCATION. TYPE. AND OUANITITY OF VEGETATION TO BE REMOVED. PROVIDE A SKETCH OR S[TE PLAN IF APPLICABLE DEPICTING WHERE PROPOSED REMOVAL AND/OR DEVELOPMENT WILL OCCUR. There is no vegetation removal as part of this project. We are replacing an existing concrete slab and Generator with new one UJ ] �7aY Y n e7: ]�{: ](� li Pi COMPLETE EITHER PART I OR H BELOW: PART I -EXEMPTION Any person who intends to remove or cause the death of any vegetation pursuant to any of the fol]owing exemptions must first fill out Part I of this form. The burden of proving entitlement to any particular exemption shall lie, at all times, with the person or persons claiming the exemption. PLEASE CHECK ONE OF THE FOLLOWING: 1. The minimal removal of vegetation necessary for the clearing of a path not to exceed 4' in width, to provide physica] access or view necessary to conduct a survey or site examination OR 10' in width to provide vehicular access necessary to conduct soil tests, for the preparation of bona ftde site development plans or vegetation inventories; provided such clearing or removal is conducted under the direction of a Florida registered surveyor or engineer. Fee: $55 2. The removal of vegetation in a utility eascment, drainage easement, storm water management h�act or facility, or right -of --way provided such work is done by or under the control of the operating utility company and that company has obtained all necessary licenses or permits to provide utility service through the easement. Fee: $55 3. The removal of vegetation which has been determined to be a safety hazard, destroyed or damaged beyond saving by natural causes or causes not covered by other sections of this chapter, is infected with disease or is infested with insects, or which constitutes immediate peril to life property or other trees. Fee: $55 *No application, approval, or fees are required for removal of a hazardous tree on residential property if the property owner obtains documentation from an arborist certified by the International Society of Arboriculture or a Florida licensed landscape. architect that the tree presents a danger to persons or property. 4. The removal of native vegetation, upon any detached single family residential lot or• parcel of land having an area of one (1) acre or less, This exemption is, however, subject to the following conditions: Fee: $55 A) .Nothing in this exemption shall exempt any person from the landscaping. requirements set forth in Section 7.09.00 of the St. Lucie County Land Development Cade; B) This exemption shall not be construed to allow the removal or alteration of any protected vegetation without a Vegetation Removal Permit on any lot or parcel of land by its subdivider unless the subdivider intends to construct a residential unit or units upon the lot or parcel of land prior to its sale. C) No native vegetation twenty-four inches (24"), or greater, dbh shall be removed from any residential parcel (including those in the AG-5, AG-2.5, AG-1, AR -I, RE-1, and R/C zoning districts), regardless of parcel size, without an approved Vegetation Removal Permit and an approved mitigation plan. 5. The removal of any non-native vegetation. Fee: $55 which will be waived for removal of invasive exotics only for single family homeowner or property owner's association removing exotics. � 6. No vegetation to be removed. Fee: $55 The following activities do not require the application of a Notice of Vegetation Removal, however may require Building Permit approval or other such authorization: Fee: None A) Preserve and Parks Management Activities. Vegetation removal activities associated with an adopted management plan for government maintained parks, recreation areas, wildlife management areas, conservation areas and preserves. The purpose of the vegetation removal activity shall be to protect and preserve the natural values and functions of the ecological communities present, such as, clearing for firebreaks, conducting prescribed burns, or construction of fences. B) Existing Agricultural Operations. Vegetation removal associated with subsequent harvesting activities, except within required preserve areas or deeded conservation easements, which are. part of the on -going activities of the existing operation shall not require a permit. Initial clearing of a site is not an exempt actvity. Bona fide agricultural activities include commercial nursery, tree farm, aquaculture, ranch, or similar operation. C) Routine Landscape Maintenance. Trimming or pruning of vegetation which is not intended to result in the eventual death of the vegetation, mowing of yards or lawns, or any other landscaping or gardening activity which is commonly recognized as routine maintenance, replacement or re -landscaping. 2 UPDATED 8/282019 PART II -VEGETATION REMOVAL PERMIT Fee Schedule: $100 per Single Family Home Lot/Building $100 per Multifamily Home LotBuilding $200 per Non -Residential Building Please complete ALL of the requested information. A Vegetation Removal Permit shall only be issued if sufficient evidence demonstrating that at least one of the following criteria has been satisfied: 1. The applicant for vegetation removal permit shall demonstrate why preservation of the existing native vegetation is not practically feasible and prevents the reasonable development of the site. 2. The removal of the native vegetation is the minimum necessary in order to implement a Final Development Order (i.e.; approved site plan or approved building permit). 3. A Final Development Order has not been issued, or is not required by this Code for the intended non-agriculhual use of the land and vegetation removal is the minimum necessary to allow for the construction of the intended use ar improvement. ADDITIONAL SUBMITTAL REQUIREMENTS FOR VEGETATION REMOVAL PERMITS: 2. (in addition to the site plan provided to the Building Department) The plans must accurately depict the location of all proposed buildings, structures, driveways, sepflc tanks, and other improvements. 3. Tree Survey The survey must accurately depict the individual locations, species name and common name, and sizes of all County- protectedtrees to be removed and, if applicable, the individual locations, species name and common name, and sizes to be preserved or relocated. 4. Vegetation Removal Plan The vegetation removal plan must illustrate the existing vegetative conditions on the project site, including an identification of what areas will be impacted by the proposed development activity and what areas are proposed for preservation or replanting. 5. Mitigation All native vegetation shall be protected on site to the greatest extent possible. if impact is unavoidable, mitigation shall be provided through one of the mitigation methodologies outlined in Land Development Code Section 6.00.OS.D. Provide mitigation calculations per Land Development Code Section 6.00.OS.D and include a mitigation plan outlining proposed mitigation method on the tree survey and/or site plan. If sufficient mitigation cannot be accommodated on -site and additional inches of credit are required based on calculation, an off -site mitigation plan shall be attached for review and approval of ERD Director (Land Development Code Section 6.00.OS.D). Prior to the issuance of any authorization for commencement of permitted development activity, the replacement vegetation shall be preserved, relocated or planted, or the appropriate mitigation fees shall be paid to the County. As part of the issuance of any permit requiring mitigation, the property owner shall submit to an inspection of the planted/relocated/preserved materials 18 months after the issuance of a Certificate of Occupancy or other use authorization. UPDATED 8/28YL019 PLEASE HAVE THE FOLLOWING ACKNOWLEDGEMENTS NOTARIZED: I CERTIFY THAT: (CHECK ONE) A. ( ) I AM THE OWNER OF RECORD OF THE ABOVE DESCRIBED PROPERTY AND WILL BE CONDUCTING THE WORK AS OWNERBUII,DER. Disclosure Statement• State /aw requires ronstruction to be done by /icensed contractors You have app/red fnr a permit under an exemption to that law. The exemption a//ows you, as the owner of your property, to actas your own contractor with certain restrictions even though you do not have a license. You must provide direct, onsite supervision of the construction yourse/% You may build or improve aone-famiN of two-family residence or a farm outbuilding. You mayalso bui/d orimprove a mmmercia/building, provided your casts do not exceed $75,000. The bui/ding orresidence mustbe for your own use or occupanry. Itmaynotbe burltorsubstantia/lyimproued forsale or/ease. Ifyouse/l or/ease abui/ding youhave builtorsubstantial/yimproved yourself within 1 year otter the ronstruction is romp/ete, the law wl// presume that you bui/t or substantially improved it for sale or /ease, which is a violation of this exemption. You maynot hire an unlicensed person to act as your contractor or to supervise people working on your bui/ding. It is your responsibi/ity to make sure that people emp/Dyed by you have licenses required by state law and by county or municipal licensing ordinanres You may not de%gate the responsibility far supervising work to a licnnsed contractor who is not licensed to perform the work being done. Any person working on yourbuilding who is notlicensed must work under your directsuperv/sion and mustbe emp/Dyed by you, which means that you mustdeduct F.I.C.A. and withho/ding tax and provide workers' compensation far that emp/oyee, al/ as prescribed by law Your construction must rompty with a// applirab/e /ows, ordinances, bui/ding codes, and zoning regulations B. ( ) I AMNOT THE OWNER OF RECORD OF THE ABOVED DESCRIBED PROPERTY; HOWEVER, I HAVE AUTHORITY TO ACT AS AGENT FOR THE OWNER OF RECORD. (St. Lucie County Cade and Compiled Laws requires that this type of lvork be done by a licensed \ contractor. PLEASE PROVIDE DOCUMENTATION). THAT ALL INFORMATION SUBMITTED IT T SAP LIGATION IS TRUE AND COMPLETE TO OF MY KNOWLEDGE. GENT SIGNATURE C �dTRACTOR SIGNATURE STATE �1� FLORIDA, STATE OF FLORIDA, COUNTY F ST. LUCIE COUNTY OF ST. LUCIE The foregoing instrument was acknowledged before me this t� day of Nov �p zo by Jose delgado who is personally know to me or has produced i as identification. Type * � • • � Comnii6sinn Number q. Q led t�� ��;.' ��� c Uode, O � STAT����\\\` The foregoing instrument was acknowledged before me this � o day of Nov Zp 20 by Daniel Ault Who is personally know to me or has produced _ as identification. •**a*******+******x***+*******x*****x**x*x*********x�***********************s********* FOR OFFICE USE ONLY APPROVED _ DENIED REVIEWED/ APPROVED BY: ENVIRONMENTAL RESOURCES DEPARTMENT / DATE UPDATED 8i28/2019