HomeMy WebLinkAboutTANK SPECS - 11-11-20 =-=ftaw
Quality Steel Corporation AG/UG Propane Tanks
OVERALL LENGTH
Q
HEIGHT
LEG SPACING
LW WOTK
1450 wg. AND UP
APPROXIMATE ABOVEGROUND/UNDEGROUND(AGJUG)VESSEL DIMENSIONS AND SPECIFICATIONS
WATER DIAMETER HEAD OVERALL OVERALL LEG* LEG** WEIGHT **QUANTITY
CAPACITY (OD) TYPE LENGTH HEIGHT WIDTH SPACING (Ibs.) FULL tone PER STACK
*12D wg. 24" Ellip. S'-8" -1 3' 101/2" 2'-101/2"or 3'-11" 260 108 196 16112
*2S0 wg. 30" Heml. 7'-10" 3'-8" 1'-5" 4'41" 480 54 9
*320 wg. 30" Heml. 9'-7" 3'-8" 1'-5" 5' 620 45 9
500 WM 371/2" Heml. 10' 4'-2" 1'-8" 5' 950 37 130 8 6
1000 wg. 41" Heml. 16' 4'-5" i'-8" 10'-1" 1,800 17 15 6 1 5
14SO wg. 461/2" Ellip. 17'-4" V-11" V-9" 11'7" 2,650 12 4
1990 wg. 461/2" Ellip. 23'-11" 4'41" 1'-9" 16' 3,520 8 4
Diraenslons and spxfftcaftns Shawn are appr odmate.indMdual vessels may vary.
leg spacnng+/-r-Leg widths and spacing may vamy based an a&location.Check with vw salesperson for deulls.no,M,320 vv&standard tanks
-no hates in legs(one center hole an request).500 and 1000 w&standard tanks-2 holes 16"on center.1450 w&and up as shown above.
**Foil load and stick quaftPs vary by shlpp[ng location.Check with your salesperson for details.
General Saedflcatior
-Conforms to the latest edition of ASME Rules for Construction of Pressure Vessels,Section VHI,Division 1.
Complies with NFPA 58.
-Rated at 250 prig from-200 F to 125'F. All vessels registered with National Board.
-Two service options available:
Option 1:Ready-to-bury underground option,coated with either powder coated phenolic epoxy finish
or liquid applied epoxy primer coat followed by urethane top coat,supplied with composite
AG/UG dome.
Option 2:Aboveground option,coated with either powder coated TGIC polyester finish or liquid
applied epoxy primer coat followed by urethane top coat,supplied with steel AG/UG dome.
-All vessels are shipped vacuum pre-purged to enable simplified first fill of the vessel.
Updated June 30,2015
r
f
1 w•
ti" - - •
N.
wo
thaw
Us
. ..............
•,•I� ail 1:~ '=�lJ.
•All
i
•T1, NINO
••. r •!
CARNO -
£�n�sa�rrc • � •
stywra e w '
i
fit
1 - i ,•• f
li1st�,.
, r n
• - a
- - PROPANE CONSTRUCTION NOTES
1. All pipe and fittings above ground and inside building shalt be
SCH..40 Galvanized ASTM Al 20 or AGA approved•corrugated
stainless steel•(C.S.S.T.)pipe. •
2. All-polypipe and finings shalt be ASTIR[ D2513 or ASTM D2517
and sham be bgn0ed-outside underground at a depth of 18" with
warning tape and tracer wire.
3. All pipe and meter locations are approximate and subject to
change.-
.4. All polypipe shall be joined by heat fusion or approved mechanical,
couplings.
• 5. Ail'galvanlzed pWo shall be threaded.
6. AII,pipe.shag l;e pressure tested to 26# PSI fora period of 24
hours. .
•I -
UNDERGROUND TANK INSTALLATION
2" to G'
• DOWNGRADED AWAY .. -
FROM DOME •-'" "'
•
1 ANODE CABLE �y•� •'�
• SACRJ FICIAL ANODE •..f... I .
• (MAGNESIUM 8AGl • • '•. • t
sy ` �: ••
S •t f t
Oil
REctmATOR
• SMUT OAS OFF AT
' GU DE VAEVE
itADE
O
.• If?" lrG TAPE -• Y
RISE s
GRADE/CONCRETE SLEEVE t
• . . Q + . 1 •
• i r,
f • .0 • • •O 0 •y0� •.I•f•f •• • O f •'tip v I•• • • •• tt
•r
kv
• . •, Q • • •�• 0 1••• f • •• •i f• • • ..• • • • O �• • •,
.° •o • U1i0Enonovflo U-0AS COMMU - SERViC E LINE
• - 'GRACE HIRE
f