Loading...
HomeMy WebLinkAboutTANK SPECS - 11-11-20 =-=ftaw Quality Steel Corporation AG/UG Propane Tanks OVERALL LENGTH Q HEIGHT LEG SPACING LW WOTK 1450 wg. AND UP APPROXIMATE ABOVEGROUND/UNDEGROUND(AGJUG)VESSEL DIMENSIONS AND SPECIFICATIONS WATER DIAMETER HEAD OVERALL OVERALL LEG* LEG** WEIGHT **QUANTITY CAPACITY (OD) TYPE LENGTH HEIGHT WIDTH SPACING (Ibs.) FULL tone PER STACK *12D wg. 24" Ellip. S'-8" -1 3' 101/2" 2'-101/2"or 3'-11" 260 108 196 16112 *2S0 wg. 30" Heml. 7'-10" 3'-8" 1'-5" 4'41" 480 54 9 *320 wg. 30" Heml. 9'-7" 3'-8" 1'-5" 5' 620 45 9 500 WM 371/2" Heml. 10' 4'-2" 1'-8" 5' 950 37 130 8 6 1000 wg. 41" Heml. 16' 4'-5" i'-8" 10'-1" 1,800 17 15 6 1 5 14SO wg. 461/2" Ellip. 17'-4" V-11" V-9" 11'7" 2,650 12 4 1990 wg. 461/2" Ellip. 23'-11" 4'41" 1'-9" 16' 3,520 8 4 Diraenslons and spxfftcaftns Shawn are appr odmate.indMdual vessels may vary. leg spacnng+/-r-Leg widths and spacing may vamy based an a&location.Check with vw salesperson for deulls.no,M,320 vv&standard tanks -no hates in legs(one center hole an request).500 and 1000 w&standard tanks-2 holes 16"on center.1450 w&and up as shown above. **Foil load and stick quaftPs vary by shlpp[ng location.Check with your salesperson for details. General Saedflcatior -Conforms to the latest edition of ASME Rules for Construction of Pressure Vessels,Section VHI,Division 1. Complies with NFPA 58. -Rated at 250 prig from-200 F to 125'F. All vessels registered with National Board. -Two service options available: Option 1:Ready-to-bury underground option,coated with either powder coated phenolic epoxy finish or liquid applied epoxy primer coat followed by urethane top coat,supplied with composite AG/UG dome. Option 2:Aboveground option,coated with either powder coated TGIC polyester finish or liquid applied epoxy primer coat followed by urethane top coat,supplied with steel AG/UG dome. -All vessels are shipped vacuum pre-purged to enable simplified first fill of the vessel. Updated June 30,2015 r f 1 w• ti" - - • N. wo thaw Us . .............. •,•I� ail 1:~ '=�lJ. •All i •T1, NINO ••. r •! CARNO - £�n�sa�rrc • � • stywra e w ' i fit 1 - i ,•• f li1st�,. , r n • - a - - PROPANE CONSTRUCTION NOTES 1. All pipe and fittings above ground and inside building shalt be SCH..40 Galvanized ASTM Al 20 or AGA approved•corrugated stainless steel•(C.S.S.T.)pipe. • 2. All-polypipe and finings shalt be ASTIR[ D2513 or ASTM D2517 and sham be bgn0ed-outside underground at a depth of 18" with warning tape and tracer wire. 3. All pipe and meter locations are approximate and subject to change.- .4. All polypipe shall be joined by heat fusion or approved mechanical, couplings. • 5. Ail'galvanlzed pWo shall be threaded. 6. AII,pipe.shag l;e pressure tested to 26# PSI fora period of 24 hours. . •I - UNDERGROUND TANK INSTALLATION 2" to G' • DOWNGRADED AWAY .. - FROM DOME •-'" "' • 1 ANODE CABLE �y•� •'� • SACRJ FICIAL ANODE •..f... I . • (MAGNESIUM 8AGl • • '•. • t sy ` �: •• S •t f t Oil REctmATOR • SMUT OAS OFF AT ' GU DE VAEVE itADE O .• If?" lrG TAPE -• Y RISE s GRADE/CONCRETE SLEEVE t • . . Q + . 1 • • i r, f • .0 • • •O 0 •y0� •.I•f•f •• • O f •'tip v I•• • • •• tt •r kv • . •, Q • • •�• 0 1••• f • •• •i f• • • ..• • • • O �• • •, .° •o • U1i0Enonovflo U-0AS COMMU - SERViC E LINE • - 'GRACE HIRE f