HomeMy WebLinkAbout5801 Eastwood_11-10-2020 (Pre Power)Gfp I Universal
Engineering
S
Sciences
Company
INSPECTION RESULTS
Inspection Date / - (v - Z.p Permit No. / Q /O - O (o S
Project
Address:_ 5' i0 f 7"wGbGi 1) 2
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection
Inspection Type Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rou h-In
Slab
Floor Rou h-In
Steam Piping & Test
Masonry
Wall Rough -In
-Rough-In
Stack Pi in & Test
HW Piping & Test '
Wall/ Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/ Feeder
X
Gas Piping & Test
Cond. Piping & Test
Structural
Service/ Ground
)e
Storm Piping & Test
Insulation
Sheet Rock
I Aviv) fiance/ Equipment
I
I Fixtures
I Wall & Ceiliniz
Roofm
Li tin Protection
Equipment
Equipment
Reins action
Re -ins action
Re -inspection
Re -inspection
Final BuildingFinal
Electrical
Final PlumbingFinal
Mechanical
Other Inspection Type AREJa taJ e /L
Area
Inspection Results: AP -Approved AE - Approved DA- DP - Not Ready ❑
with Exceptions Disallowed Disapproved
Conditions/ Comments p ¢ �,q.q! 5��� r e� r Z o f/ �t� /��2 f �✓z Cvf�
1.
2.
3.
4.
5.
6.
i
Inspector's Name ` n, JQ yew uv — Lic. M nnJ
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 9243575 • (772) 9243580 (fax)
v.nvw.teamgfa.com