HomeMy WebLinkAbout5711 Eastwood_11-10-2020 (Roof Final)Gfi� I Universal
Engineering
S
Sciences
Company
INSPECTION RESULTS
Inspection Date // - /n , -ZO Permit No..
7
Project LL-,Y..) l rc><LY
Address: S? % I 6(5Tw 0 0 d
Check one:
V-Regular Inspection:
❑ Reinspection Date of Initial Inspection
Inspection Type Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rou h-In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Pi in & Test
HW Pi in & Test '
Wall/ Ceiling
Ceiling Rough -In
Water Pi in & Test
CHW Piping & Test
Framing
Panel/ Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/ Ground
Storm Piping & Test
Insulation
Sheet Rock
A liance/ E ui went
I
I Fixtures
Wall & Ceiling
Roofm
V-
Li tin Protection
E ui meat
Equipment
Re -ins ection
Re -ins ection
Re -ins ection
Re -in ction
Final Building
Final Electrical
Final PlumbingFinal
Mechanical
Other Inspection Type
Area Inspected/Code: (-
Inspection Results: AP -Approved AE — Approved DA- DP- Not Ready ❑
with Exceptions Disallowed Disapproved
❑ ❑ ❑
Conditions/ Comments
1.
2.
3.
4.
5.
6.
Inspector's Name )& E —L_ - � d Lie. #: A., �16 ;' b,
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924.3575 • (772) 924.3580 (fax)
www.teamgfa.com