HomeMy WebLinkAbout7002 Penny Lane_11-10-2020 (Roof Final)Gfp I S versa)
Engineering
Sciences
nces
Company
INSPECTION RESULTS
Inspection Date %l — /O - ZO
Project (2 r2 Av74 e:Uy
Address: t !SUN 4,)
Check one:
Regular Inspection:
❑ Reinspection Date of Initial Inspection
Inspection Type Requested (check):
Permit No. /I F D 9 -
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Pi in & Test
Masonry
Wall Rough -In
Stack Pi in & Test
HW Pi in & Test
Wall/ Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/ Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/ Ground
Storm Piping & Test
Insulation
Sheet Rock
I
I A fiance/ Equiturient
I
I Fixtures
I
I Wall & Ceilin
Roofing
Lighting Protection
1iui went I
I
Equipment
Re -inspection
I
I Re -inspection
I
-inspection
Final Building
Final Electrical I
I Final Plumbing
Final Mechanical
Other Inspection Type_
Area Inspected/Code: /� cz- ` f ( --) ,4L
Inspection Results: AP -Approved AE - Approved DA- DP - Not Ready ❑
121, with Exceptions Disallowed Disapproved
❑ ❑ ❑
Conditions/ Comments
1.
2.
3.
4.
5.
6.
7.
Inspector's Name) D 0.1 io Lic. #:_ f3/J �lv
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924.3575 • (772) 924.3580 (fax)
www.teamqfa.com