Loading...
HomeMy WebLinkAbout7002 Penny Lane_11-10-2020 (Roof Final)Gfp I S versa) Engineering Sciences nces Company INSPECTION RESULTS Inspection Date %l — /O - ZO Project (2 r2 Av7­4 e:Uy Address: t !SUN 4,) Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection Inspection Type Requested (check): Permit No. /I F D 9 - BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Pi in & Test Masonry Wall Rough -In Stack Pi in & Test HW Pi in & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder Gas Piping & Test Cond. Piping & Test Structural Service/ Ground Storm Piping & Test Insulation Sheet Rock I I A fiance/ Equiturient I I Fixtures I I Wall & Ceilin Roofing Lighting Protection 1iui went I I Equipment Re -inspection I I Re -inspection I -inspection Final Building Final Electrical I I Final Plumbing Final Mechanical Other Inspection Type_ Area Inspected/Code: /� cz- ` f ( --) ,4L Inspection Results: AP -Approved AE - Approved DA- DP - Not Ready ❑ 121, with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name) D 0.1 io Lic. #:_ f3/J �lv OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924.3575 • (772) 924.3580 (fax) www.teamqfa.com