Loading...
HomeMy WebLinkAboutO'Quinn signed print A-2C I 0 C a c a Pi 8'-3" 6'-3" 17'-8' 5'-10" 2'-10" 2'-9" 116" (4) Risers (3) Treads at 7" at 11 " 69'-4" T-0" 16„ 6'-2" 38'-4" 19'-0" 6'-8" 6'-2 "" 16"" T-0" F.F.E. 16" #5 Rebar 12"o.. #5 Rebar Typ. Foundation & Footing Plan scale: 1/4- = 1'-0- 10" _ _ 1 " Nosing Cast In Place conc. Steps with 3000# mix OI 0.00' Riser Hght. not to exceed 7 3/4" Conc. Ste Garage Detail —�- -28„ F.F.E. (2) #5 Top & (2) #5 Bottom with (1) - #3 Vert. 16"o.c. Typ. F-1 F-2 18" x 16" mono. footing with (2) #5 rebar cont. `v and curb Q Conc. D F_1 SECTION FOR DETAILS F=1 N 16- 6-18" 0 18" STEMWALL & FOOTING CURB FOOTING L AT GARAGE F-3 F-4 Recess 4" at Shower 18" x 16" mono. footing $ with (2) #5 rebar cont. 4" 4" LL �4 Steps -------- I ----------ID 18- --------- ------- ----------- LU 0 I STEP FOOTING r) -I U_ N Q to 00 z CL 4'-2" 2'-1 "" X-5" 2'-5" 17 17" ° I F�1 8'-3"" 1'-7"" 14,_2„ 5'-11 "" 8'-5""Nr I I o) W (1) I 4-) � I Ft1 � E 01 o ❑ ❑ F-1— E1 — ------ ❑ C 0 I 00 ----- -- ---- I F j 1 I _4" -4 I .. DF F-4 I�� F-4 --F-1-- 2 -4 FL1 I 15" N • 4" 2500# cont. pad I I I _F-5 _ r� I I Ti r F_2 "T F_2 � I I o I 11,-2„ F+1 I 14 Slope for I o Ft5 \ Garage Dr. -1 I I 0.00' I \ 2'-1 "" 3'-11 "" 18" 2'-0" 1'-11" -�. L Typ' Typ' I F-5 I Cl) ❑ 0 oII (4) Risers at 7"" — F-2 N (3) Treads at 11 "" 5 I ' i to ❑ I Steps I 4"" 2500# FIBERMIX CONC. LnCont. OVER .006 VAPOR BARRIER ON CLEAN, TE MITE TREATED FILL - 8" I 13'-9„ 5,-1 „ X-0" LO `�o I ASSUMED F.F.E. 0.00' o I/co M p I I F-1 T II F-3 -28" I ~ I o slope 2" F 5 �� J �� I co I � I __ I ❑ Slope for `i I Garage Dr. bo I 1 /I N Cn I I 00 0 0 I [ F-1 I I I I � I co 14" I I M F-4 � 13„ 6,13„ 3,-0„ 14„ d 'v I •CD �-------- ❑ F-2 --------- F-2 Pad24"xF Footing with g FF -4 F-4 24"x 24"x 18" —4"' Pad Footing with Ft1 _ N-5-11— ❑ ❑ (1) #5 rebar 6"o.c. each way (1) #5 rebar 6"o.c. o each way ❑ ❑ ❑'00"❑ F-1 '� " �— a � co C) -------- --� F-4 CV -------- CV N F-4 ^ N N I O RM F FR FIRD I I II 7'-8" I Ftl Ft1 CD I � I I I I co 0F=j I ---- ----- ---- ---- FaT ------------ 0 ---- --- F_1 � — -- I Foundation & Footing Plan scale: 1/4- = 1'-0- 10" _ _ 1 " Nosing Cast In Place conc. Steps with 3000# mix OI 0.00' Riser Hght. not to exceed 7 3/4" Conc. Ste Garage Detail —�- -28„ F.F.E. (2) #5 Top & (2) #5 Bottom with (1) - #3 Vert. 16"o.c. Typ. F-1 F-2 18" x 16" mono. footing with (2) #5 rebar cont. `v and curb Q SEE TYPICAL WALL 4 to 6 SECTION FOR DETAILS 4" N 16- 6-18" 0 18" STEMWALL & FOOTING CURB FOOTING L AT GARAGE F-3 F-4 Recess 4" at Shower 18" x 16" mono. footing $ with (2) #5 rebar cont. 4" 4" LL �4 L8- 16- 4 8" 18" 18- TYP. SHOWER LU RECESS STEP FOOTING Garage 12" F-5 10 1 osing Typ. I 0.00' _28„ Slope � FFE 0.00' Riser Fight. not to exceed 7 3/4" Cast In Place cont. Steps with 2500# mix NT -7 and #5 rebar 12"o.c. E each way STEM WALL, SEE TYPICAL WALL SECTION 4" 2500# FIBERMIX CONC. OVER .006 VAPOR BARRIER ON CLEAN, COMPACTED, TERMITE TREATED FILL Conc. Step Detail Entry & Porch FORMWORK & SHORING No structural concrete shall be stripped until it has reached at least 80% of the 28 day design strength. Design, Erection, & Removal of all formwork, shores, & reshores shall meet meet the ACI Standards 347 and 301 Contractor to verify all building setbacks prior to the start of construction. A formboard survey shall be submitted to the building department for approval prior to pouring concrete. SOIL STATEMENT: Foundation has been designed for a soil bearing capacity of 2000 p.s.i. Fill shall be laid in layers of 12. Each layer to be compacted to 95% compaction. If the contractor encounters, while digging the foundation, any discrepancy to suggest the soil may be inadecuate, he must immediately report it to the owner and the Architect or Engineer so as to order a soil boring test. Dowel Rod Repair Note In the event vertical steel has been omitted from the down pour locations, drill 5" into concrete (no closer than 3 3/4"' from edges and 5" from ends of cap walls) Remove dust per manufacturers instructions and use Two part epoxy to anchor the #5 rebar in place. Use either "Hilti C-100" or Simpson Epoxy -Tie. GENERAL FOUNDATION NOTES Concrete shall be a minimum of 4" thick over clean, compacted, termite treated fill and 6 mil polyethylene vapor barrier. If concrete slab contains 6" x 6" 10/10 WWM provide 1" coverage Concrete shall have at minimum compressive strength of not less than 3,000 p.s.i. All 90% hooks are to be extended 10" minimum beyond the turn. Field bends are to be done cold and the diameter of the bend, measured on the inside of the bar, is not to be less than six bar diameters. Minimum coverage for rebar shall be 3" in footings and 1 1/2" in bond beams. Hooks may be rotated horizonitally if required to achieve minimum coverages. Rebar overlap shall be 48 bar diameters. 30" for #5 rebar The foundation design assumes that the soil has a minimum load carrying capacity of 2000 p.s.f. In the event the soil bearing capacity falls below 2000 p.s.f. This foundation plan may be superceded by Foundation Design Engineer. Satisfactory compaction test of fill does not verify lower soils are adequate. All specifications and dimensions to be verified by contractor. All exterior slabs shall slope a minimum 1/8" per foot for drainage U `v LU Q ~LO N LO . C: N .� = Boz00 N 0 IY 00 Q L LLI .� 00M 1� v z M LL LID b.0 0 ai Cl) LU i aD uO 00 r) -I U_ N Q to M z CL UW D 4) ° o) W (1) 4-) tC3 `v LU r- ~LO N LO . C: N .� = Boz00 d- O � I T CU 1-11 _ Q W U 00M T O LJ_ W U z W 0 UJ 2 O 0 U drawn s.l. checked s.l. date 11/7/2020 scale as noted job number 20011 sheet A-2