HomeMy WebLinkAboutO'Quinn signed print A-32" v.t.r.
J
1 1 /2"
2"` v.t.r. I�
I I �
I 1 (1/2"��� I
LAV /
I
I
W.C. I
I
2" WASHER
SINK
3""
Plumbing contractor to provide a
water hammer & shut off valve at
each fixture
Insulate all hot waier lines 2" v.t.r.
I
TUB b
W.C. 3„
C.O.
4`"
to septic
system
PLUMBING NOTES:
2`" Auto I
Vent I
e
I
SINK
LAV 2-
3"
3"
3"
2" v.t.r.
1 1/2
I � I
2"" v.t.r.
I I I
i I I
i I I
LAV 3„
LAVf
2„
3"
i3 W.C.
2„
TUB
2„ 2„
SHWR.
Plumber to consult with contractor and equipment ordered
for rough in dimensions.
Verify all dimensions with the floor plan. The floor plan
dimensions dictates all other dimensions on other sheets.
Do not scale drawings, if any conflicts arise, contact the
Architect or Engineer for clarification prior to construction.
All sanitary lines 2" or less shall have a slope of 1/4" per
foot minimum.
All sanitary lines above 2" shall have a slope of 1/8" per
foot minimum.
Provide Anti -Scalding Valve in all showers.
Lowest living area floor elevation (refered as 0.00') to be
set by a professional land surveyor to the required building
department elevation, but not less than 18" above the crown
of the road.
Right Elevation
scale: 3/16" = 1'-0'
Elevation
= 1'-0"
Left Elevation
scale: 3/16" = 1'-0-
—�! I
Top of Window
to Soffit, Typical
& Cap Trim
Three Coat Stucco over
paper backed wire lath on —
one layer of House Wrap on
5/8-cdx plywood fastened to
trusses per Nailing Schedule
Wind Zones - Walls
10'-0"
0.00'
-4"
M.
V
0
C
U_
CU
W
Q
p
� r
/
~
ce►
u7
N
L
(Y
W
00
d -
I
P �'i
�IJi
z
M
N
,.J
'-'
LU
U
Lr)
c9
U)
N
It
'
W
i
W
li
N
Q
r"
J
V
2
..
v
Z
CL
U
w
>
X
�Lo
a)
Wm
ry
d'
4-J
CU
0
U_
CU
W
Q
p
� r
/
~
M cQ
LO
u7
N
�oz00
qct
(U
I
+'
N
■—
Q
LU
U
r..
00
T
drawn
$1
checked
s.l.
date
11/7/2020
scale
as noted
job number
20011
sheet
A-3
0
U_
W
p
U
Z
W
O
+'
V)
W
O
U
drawn
$1
checked
s.l.
date
11/7/2020
scale
as noted
job number
20011
sheet
A-3