Loading...
HomeMy WebLinkAboutO'Quinn signed print A-4Missed Tie Down Strap Note In the event the Tie Down Strap has been omitted from the Layout location, install one HTSM20 strap at the proper location. Fasten with (4) 1/4" x 2 1/4- Hex Head Titen screw to C.B.S. and (10) 10d to truss. MAXIMUM UPLIFT 1175 lbs. Connector Notes: Do not substitute connectors Do not sheath trusses before all straps are in place Attach valley trusses and piggy back trusses, if present, to main trusses per truss manufacturer drawing. Truss to truss connection by truss company, installed per manufacturers spec's. Lateral forces perpendicular and parallel to wall has been considered (less than 300 p.l.f.) Contractor to approve temporary bracing to prevent toppling of trusses, see HIB -9. Other specs, if different from above, have priority. A.T.R. = All Treaded Rod Drill and Epoxy Set all A.T.R. Use either ""Hilti"" C-100 or Simpson Epoxy Tie Epoxy Connector Schedule Truss Bearing Truss Connector Qnty' Connector Fasteners Q_ Point Uplift ID U Uplift C14 N 19 1849 HHETA20 1 2235 (10) 10d x 1 1/2"" AIG 00 r �'i J � z M Lu CU 1 Ply 11 1713 HETA20 1 1810 (9) 10d x 1 1/2" A21 GE W i N L0 � (1) 5/8""ATR drilled & epoxy Co 26 2539 MGT 1 3965 into bond beam with 12 -min. 2 Ply r. U) '—' U embed. and (22) 10d to truss z CL U U w > (1) 5/8"ATR drilled & epoxy 19 4022 into bond beam with 12"min. C:) MGTembed. LIJ and (22) 10d to truss 1 4825 � 4-) U) MTSM16 Each (7) 10d to truss and (4) B2G 17 4072 1/4"x 2 1/4"Titen to CBS 2 Ply 1 3787 (1) 5/8"ATR drilled & epoxy MGT 1 3965 into bond beam with 12"min. 11 3098 embed. and (22) 10d to truss All other trusses ALL <1810 HETA20 1 1810# (9) 10d x 1 1/2 - to CBS Supporting (4) 10d Valley Framing <250# VTCR 1 370# Valley (3) 10d x 1 1/2- Trusses Truss Truss Bearing Point Locations are numbered per the Truss Profile Sheets Provided by the Truss Manufacturer. 2 x 4 blocking at 4'-0"o.c. starting from ridge between both top and bottom cords for two truss spaces from gable end See truss shop drawings 2 x 4 diagonal "X" bracing at 8'-0"o.c. starting from ridge with (3) 12d each end -, (2) 1 Continuous 2 x 4 Lateral bracing at 1/3 points of span. Nail with (2) 16d each truss btm. cord trusses 24" see layout Continuous 2 x 4 bracing fastened to beam with 5/8" x 6" wedge bolts with 1/8" x 2" washer 24"o.c. Gable End Bracing Detail 2 x 4 bottom cord bracing Galv. drip edge min. 4" lap 1 x 3 p.t. over 2 x 6 Paint Grade Fascia Gable end truss by truss mfgr. 5/8" c.d.x. plywood with 8d nails 4"o.c. Cover with House Wrap 2x "L" web stiffener as required by the truss mfgr. "Simpson" HETA16 truss to bond beam with (14) 10d x 1 1/2" located at each truss vertical Concrete Bond Beam Bottom Cord Lateral Bracin Attic Vents Calculation GARAGE, PORCH, and ENTRY AREAS Attic Area: 1305 s.f. / 150 = 8.7 s.f. required. soffit area = 152.7 I.f. x 1.5 = 229 s.f. Venting Provided: 8 x 16 soffit vent: 85 sq. in. each vent 15 Vents along overhang = 1,275 sq. in. 1,275 sq. in. / 144 = 8.9 s.f. U O Q_ UJ Q r U C/) C14 N p X oo T 5r w � 00 r �'i J � z M Lu CU °? LL. Ln co b.! (n Nd' J � W i N L0 � CL Co 0 J LL N (D r. U) '—' U z CL U U w > C:) LIJ 4-) U) ry O CU UJ Q r U ~ LO N u �--� .d -CUT O T C U 0 z 00 U) Q LLQ U Lu CU °? 00 M r J ry O W — 'L O U �—��t LL Z u >�' LU O C 0 O U) U Lu °? � J � J � O F_ U) U drawn s.l. checked s.l. date 11/7/2020 scale as noted job number 20011 Total Ventilation Provided: 8.9 sq. ft. Sheet Roof Framing Plan A-4 scale: 1/4- = 1'-0"