Loading...
HomeMy WebLinkAboutSoil Compaction ReportHeadquarters - -f '& - & Tv6F �*- N ENGINEERI F Mailing PO Box 78-1377 11345 U.S. Highway 1 Sebastian, FL. 32958 ML & 01 sLYL AND TESTIN9 Sebastian, FL. 3297891*111111- Orlando Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 KSMengineering.net Sanford, FL. 32771 ASTM D 1557 and ASTM D 2922 DATE TESTED: PERMIT #: CONTRACTOR: JOB LOCATION: ITEM TESTED: December 27, 2019 Wynne Development 39 SE Flamenco Way Spanish Lakes I Port St Lucie, Florida Compacted Foundation Fill KSM JOB #: 195218-1d/MH/jo TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE (P-C-F) COMPACTION 1. N. E. 011 - 12" 50 109.9 111.3 97.8% 2. S. E. 11 110.3 0 1 99.1% 3. Center it 110.7 It 99.5% 4. N.W. 109.6 It 98.5% 5. S.W. 108.9 97.8% 113.0 W E Soil Description: Brown Sand G 112.0 H T In Place Moisture: 111.0 P Optimum Moisture: C 110.0 12.0% F Max. Dry Density: P.C.F. 111.3 109.0 @ Test Locations The R Density & Penetrometer y Readings Indicate the 108.0 Degree of Compaction Meets 9 10 .11 12 13 14 15 Minimum Required Moisture - % of Dry Weight for Staked Founclatio Di�,clairner: Contract-)r is responsible to maintain q !jc, t0,,jr,(j .jrr2o In the condition that KSM cornpieted the indicated passed compaction test, w KSN', is oca rosponsible if the tested area has been pn EP; z allered fron) tt)ppp arovicl inspected condition, iR % in iJrf�, 81439 Email to: St Lutl6tuilding 12/30/2019 Department Proudly Serving Florida since 1990