HomeMy WebLinkAboutBuilding Permit,SST. �i/GZP. U0't+awva
Code Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-2172 Fax: (772) 462-6443
hftp://www.stiucieco.org/public—works/permitting.htm
Issued: 09/02/2009
Conf #: 623
Job Location: 2023 ST LUCIE BLVD 181
Permit Type: MA/RV Addition w/New Concrete
Job Description:
BUILDING PERMIT
Permit #: SLC- 0907-0318
City: FORT PIERCE
INSTALLATION OF 9'X56' CARPORT WITH NEW CONCRETE 9'X56' AND CONCRETE DRIVEWAY 9'X22'
Page 1
S/D Whisperinq Creek Co-op Lot: 181 Block: Parcel: 1433-504-0155-000/1
Property Owner WHISPERING CREEK CO-OP INC ( ) -
2023 ST LUCIE BLVD FORT PIERCE, FL 34946
Tenant ELZEY F ADAMS (772) 464-7474
2023 ST LUCIE BLVD LOT 181 FORT PIERCE, FL 34946
Setbacks Left: Right: 7.00 Front:22.00 Rear: 15.00 Zoning: RMH-5
Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 504.00
Minimum Floor Elevation: Flood Map: 177G Flood Zone: X500 Elev:
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records of this County, and there may be additional permits required from other governmental entities such as water management districts, state
agencies, or federal agencies. s:553.79(10), F.S.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
Christopher Lestrange
Building Official Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and
become null and void if work authorized by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is
not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance
of the Building Permit.