ENGINEERING SUBMITTALS
January 31, 2017 CONCEALED FASTENERS OR ATTACHMENTS
ARE THE RESPONSIBILITY OF THE
WIND LOAD CERTIFICATION: CONTRACTOR OF RECORD
CODE FBC 2014/FRC 2014/ASCE 7-10
WIND SPEED: 170 mph,3 SEC. GUST
EXPOSURE: "D"
[HESE pLANS AtvD ALL PROPOSED WORK
IMPORTANCE FACTOR: 1.0ARE SUBJECT TO AP�f CC
RRECTIONS
INTERNAL PRESSURE COEFF.: O.OREQDIRED DY FIELD INSPECTORS T ,4T
' iA�I9E� S�,R :I .I �QEIr
a AR LLlCAB Ll CODES.
JOB:
MATHIAS RESIDENCE
7107 S. INDIAN RIVER DR
FT. PIERCE, FL 34982 ' —c�33 l
�S7T..LIT` _�t��..,�._ ^;'i�'h Lj1P?'z ?�MSION
n 7s�'5VI,�.lG, )1T Z-D F O 1
DATE
FI,MNS JO13
O AITDP
OR NO T�cy�yrP�.rPvLI�:C�2'�a�ITU�ST 13E KEPT ON
PAUL WELCH INC.
Mechanical Electrical Civil Engineering
1984 S.W. Biltmore St. Suite#114
Port Saint Lucie, FL 34984
Phone (772) 785 - 9888
Email— pwelchinc@aol.co
Paul Welch, P.E. Fla Reg. No. 29945
g"
T s 4t
copy'
Pilings to be marine
TYPICAL DOCK AND ACCESSWAY CROSS SECTION grade, 2.5 CCA
(N.T.S.) treated:
Dock: min. 8"0
4'Accesswayl
10'Terminal Platform
Decking:
#1 grade 0.4 ACQ Wood 2'x6"
OR Composite 2"x6"
The work specified herein OR Composite 1"X6"
has been designed and all p
work shall be in accordance
with the 2014 Florida fastened#10x3"SS screws,
Building Code(5th Ed., 112"spacing, 2 per deck
First Printing March 2015).
All codes reference herein board/stringer
are per the latest adopted
edition.
Stringers•
2"x8#1 grade, • • ; h„
0.4 ACQ spaced at: t ^ E r {
2x6 Wood or 2x6 Joist:
Composite Decking:
#1ACQ
grade, 0.4
max.24" thru 2"x8"thru bolted ��'!'
bolted w/min 112 SS '
w/min. 112"SS all thread bolts
all thread bolts yak �nAN
OR ,
1"x6"Composite
decking: max.16" ''
thru bolted .
wl min.112" SS all M.H.W. :-; � ,f,,lii, ''
thread bolts `-,H
UUw— UO
LU
jU0U.LZ
M.L.W. �w W
�LJ.IJZ�Gr
<Z m Q Q
a LU Co g
Pilings: Bottom ter°
6' min.solid T
penetration Liu
Mathias Residence a y
Cross View 7107 S.Indian River Dr. Dock Rebuild ,
Ft.Pierce,FL 34982
ISM
10, _R
_168'+i
-
�;._--
Rebuild damaged dock
and replace boat Lift
t •3.. J �",lt�.fry �i
It
1
- r
® ,LgIlli-
•• •�• i ��'
L
STATE OF FLORIDA APR 2 1 201?
DEPARTMENT OF ENVIRONMENTAL PROTECTION IG
PERMITTINI
In re: St.Lucie Gounty,.FL
OGC NO. 16 1319
q�(.AOTHORIZATION. FOR
R9f.A,1RS.,:REPLAC E- M-ENT..RESTORATION, AND CERTAIN
OtHERL.MeASUR15SMADE NECfS.SARY BY HURRICANE.MATTHEW
. :S[.XTH..AMENDED:EME.R-GP-'NtY-�-FINAL.10 ..kb.e,$-Z'
Pursuant t6 'the.authority granted to me.by Sections 120.56_9(2.)(ri), 252-36
and
252,46, Florida Statutes,,.and.upon consideration of-the'.151atp Of Florida Executive-Order
N.os. 1' 23:0,. 16-24, -17-46 and 17!47, 1 hereby fiihd th6t....the emergency c' hdition* set
foOhin- Emergep' ay- Final Orderdated*0. 0I '0 .5. 2016. ,. it�uedin.re'.s.�6h§6,-to_Ahe.ft.
it
or inbpdjptp dppgprtq thepublic health, safety, andwelfare 11 :6itize g 0-8tafe,o
f
Florida.resuItiing.from the -wroughtoy:HurricaneVaWhe
4e;
lo. ekis
-tin
the-f6IIbW!n.g ,counties: Brevard, Olay,Duval',. 7.16g[er,. Indian River, Martln, .N. 3s*?A
Orange, Osceola, Putnam., .Sopol6.j '$t Johns,. S.t- Lucie, and'Vw.psiacoun'ti*es an
d
hereby.extend-said�Em-_',prg!p.npyF':--'a'I'Order;-K,;tht_ h A064-26,20-:17.
: In
NOTICE OF RIGHTS
Pursuant,toSopli Section ,56 -a Statutes,
.9'(2)(n) any. party advefWyaff.6ittod by
.
AFlorid'
this-Order has,fide jgg-
.;
t't _seek an njunfint i .Or ern�circuit.cOUrt.6rjudicial review
of itunder Section" 12 ri A's. Lt Judicial idia1review e' w...
mustbe So
ug t by,filing a
-h les of Appqlla i.P.r.ppg0 r i, h�'t e
notice 610peat under Rule 9.110 6fA e.Florida Rp te, h
Clerk of fhob.epartmen in the Of of General C-ounsel. 39-000,Commonwealth Boulevard,.
Mail # -Tpjl#ftasS '.idg 322`399M()0', and d-by--.filing a of'the-Inotice.- -of
,copy o
appeal,
Pa
I
e`iflihgf6.6t Wth theappropriate
.
district o rt of
appeal. The notice
fled Within thirty (3`0) days.aft this Order is filed d
witly the Clerk oft
,DONE AND ORDERED.on thi§L71tay of March,,i " - 2017.-, in Tallahassee,. Florida.
FLORIDA:DEPARTMENT OF'
ENVIRONMENTAL PROTECTION
Ryan- Wla E8q.
Interim.-Secretary
3.900 Commonwealth Boulevard
Ta-11.0hatseei Florida.3239"9.-3.000
FILED on this date, pursuant to
§120:52 Florida Statu't6$,,,:With the designated
Department-Clerk,.receipt ofwhi,ch hereby acknowledged.
CLERK OA_L4�� ATE:
y'TZ'
'
'+
L L:
ENVIRONMENT.4� RESOURCE PERMITTING
�B'n,eal P<
EMERGENIC.-lY FINAL ORDER
(EFO) AUTH0R1 5%1110NS ( r K , 0P-kT WTS, BULKHEADS, ETC.)
I €-e d to make repa m, 10what c;an I do without taRkh-bg to or nofif�.,dn DEP-
The EFO's intention is to let people repair what was legally there immediately before the hurricane.
Anyone can go ahead and do the following:
» Repair(either temporarily or permanently) structures and drainage systems that have not been completely
destroyed.
» Repair structures on state owned submerged lands that are water dependent, like-a residential dock.
»
IFI AM A GOVERNMENT ENTITY- Restore elevations and contours of uplands,(wetlands and submerged lands
and navigation channels by local, regional, and state governments.
» Remove debris and trash,.sunken vessels, vegetation, and structural remains that have been deposited into
waters or wetlands, so long as no dredging or filling.
» Repair, restore, or replace structures, land, and submerged contours to the conditions that were authorized or
otherwise legally existed prior to the Hurricane.
I need to rnake repairs or re ufl ; vfhat do I have to get authorization oor?
Certain activities that need to occur in order to recover property, protect property from further damage, maintain
navigation, or protect public health, safety and welfare may not qualify for the exemptions mentioned below. If that is
the case,your activity may qualify for a Field and Individual Authorization.
lfflhat activities may quaiffy 6br a F,ieland 'Endividual Authorization?
» Replacement of structures that are completely destroyed
» Non-water dependent activities on state owned submerged lands
» Regrading, dredging or filling uplands, wetlands and submerged lands, if not a Government entity
» Trimming or altering mangroves
» Removal of debris, sunken or grounded vessels,vegetation, and structural remains that have been deposited in
to waters, wetlands or uplands by the Hurricane if it requires filling or dredging
» Other minimally adverse impacts as determined by the Department
Hove do I request a Fle!' or 'End dual Authorization,?
Provide a notice to the applicable District office of the Department that includes:
» Description of the work requested
» DEP Facility I.D. for the location (if applicable)
)> The name, address and telephone number of the contact person for the work requested
continued
Florida Department of Environmental Protection-Post-Storm Guidance,Environmental Resource Permitting
"Ififere do f send my Notice requesting a Field or fh dlvidua�l uthor zatio_r?
Please email your request to: DEP_NED @dep.state.fl.us
(please include Emergency Field Authorization in the subject line)
Athat happens after I submit my Nott el"
Department staff will conduct a site inspection and issue a Field Authorization if the activity qualifies. The Field
Authorization may include specific conditions and an expiration date.
What Lis the deadH e for irroy request for Fveld or 6 dividua' ALA11,110l ie ation?
Important: Field Authorizations must be requested by Sept. 30, 2016.
Khat specific exemptions (those that require no notification) are -Enc�ujels in this
EmergencyOrder?
» The installation and repair of mooring pilings and dolphins associated with private docking facilities or piers
and the installation of private docks, piers and recreational docking facilities, or piers and recreational docking
facilities of local governmental entities when the local governmental entity's activities will not take place in any
manatee habitat, any of which docks:
» Has 500 square feet or less of over-water surface area for a dock which is located in an area designated as
Outstanding Florida Waters or 1,000 square feet or less of over-water surface area for a dock which is located in
an area which is not designated as Outstanding Florida Waters; I
» The replacement or repair of existing docks and piers, except that fill material may not be used and the
replacement or repaired dock or pier must be in the same location and of the same configuration and
dimensions as the dock or pier being replaced or repaired.
» The restoration of seawalls at their previous locations or upland of, or within 18 inches waterward of, their
previous locations
» The performance of maintenance dredging of existing manmade canals, channels, intake and discharge
structures, and previously dredged portions of natural water bodies within drainage rights-of-way or drainage
easements which have been recorded in the public records of the county, where the spoil material is to be
removed and deposited on a self-contained, upland spoil site which will prevent the escape of the spoil material
into the waters of the state
» The maintenance of existing insect control structures, dikes, and irrigation and drainage ditches, provided
that spoil material is deposited on a self-contained, upland spoil site which will prevent the escape of the spoil
material into waters of the state.
» The repair or replacement of existing functional pipes or culverts the purpose of which is the discharge or
conveyance of stormwater.
» The construction and maintenance of swales.
» The replacement or repair of existing open-trestle foot bridges and vehicular bridges that are 100 feet or less in
length and two lanes or less in width.
» The replacement or repair of subaqueous transmission and distribution lines laid on, or embedded in, the
bottoms of waters of the state.
» The restoration of existing insect control impoundment dikes which are less than 100 feet in length.
» The repair, stabilization, or paving of existing county maintained roads.
continued
Florida Department of Environmental Protection-Post-Storm Guidance,Environmental Resource Permitting
4
'What State Lands Authorization do t need to co educt repairs associated YLAFfli the
DEP Exemption?
These activities are now granted a Letter of Consent(authorization to be located on State own lands) provided
all the terms and conditions of those rules are met including restrictions for activities performed within aquatic
preserves.
What activities are not authorized in the Emergency Area
This Order does not authorize the construction of structures that did not exist prior to the Hurricane unless it fall
under a category in either Section a. No Notice Required, or Section b. Filled and Individual Authorization Required.
Florida Department of Environmental Protection 09/16
dep.state.fl.us
I
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
In re:
EMERGENCY RELIEF FOR OGC.NO. 16-1327
STORM'WATER EFFECTS RESULTING
FROM HURRICANE MATTHEW
1
EMERGENCY FINAL ORDER
Under Sections 120.569(2)(n), 252.36 and 252.4.6, Florida Statutes, and upon
consideration of the State of Florida Executive Order No. 16-230 and the following
findings of fact, the State of Florida Department of Environmental Protection
(Department) enters this Emergency Final Order(Order), including Findings of Fact and
Conclusions of Law, in response.to the imminent or immediate danger-to the:public
health, safety, and welfare of the citizens of the State of Florida resulting from Hurricane
Matthew(Hurricane).
FINDINGS OF FACT
1. On October 6, 2016, the Hurricane caused significant impact to Florida's
east coast.bringing substantial rainfall and storm surge along Florida's east coast from
St. Lucie.County through.Nassau County(the impacted Area). As a result of.the.
Hurricane,the Impacted Area.experienced heavy flooding, resulting in.severe impacts to
local businesses and homes and limiting vehicular,access in certain circumstances.
2. Local governments:are responsible for the management of stormwater
within their jurisdictions.
3. By State of Florida Executive Order No. 1.6-230, the Governor declared
that a state of emergency exists:throughout the State, based upon the serious threat to
1
the public health, safety, and welfare posed by the Hurricane.
4. The Department entered its Emergency Final Order In re: Emergency
Authorization for Repairs, Replacement, Restoration, and Certain Other Measures
Made Necessary by Hurricane Matthew, OGC No. 16-1319, on October 5, 2016 (10-5
Order). While the 10-5 Order anticipates actions such as those specifically authorized
herein, additional clarity will be beneficial to the local.governments as they respond to
flooding, and other events, brought on.by Hurricane Matthew.
5. The Department is entering this Order to protect human health and safety
and property.
CONCLUSIONS OF LAW
1. Based on the findings recited above,. it is hereby concluded that the
emergency caused by the Hurricane poses animmediate .danger to the public health,
safety, or welfare and requires-an immediate order of the Department.
2. Under State of Florida Executive Order No: 1.6-230, and Sections
120:5.69(2)(n), 252.36, and 252.46., Florida Statutes, the Secretary, or designee, of the
r
Department.is.authorized to issue this Emergency Final Order.
THEREFORE, IT IS ORDERED:
1. The local-governments within the Impacted Area are_authorized to install
stormwater drainage systems.(pumping stations)throughout the Impacted Area to
mitigate the stormwater:impacts related to the Hurricane. Entities other than local
governments may install and operate stormwater drainage systems in compliance with
this Order with written or verbal permission from the Department. The local
governments and any other entities authorized by the Department shall be referred to
2
herein as the 'Responsible Entity," in the singular, or the "Responsible Entities," when
referring to them collectively.
SPECIFIC CONDITIONS:
A. Any Responsible Entity within.the Impacted Area-acting under this Order
shall notify the local Department District Office when any activities under this Order are
commenced. The Responsible Entity,shall also contact the Deptirtmerifs Coastal
Construction Control Line Program when the beach system is being Impacted by the
stormwoter drainage system. The Responsible Entity shall provide the Department with
a description and location of the stormwaterdfainage system including any necessary
construction activities and volumes being pumped. The Responsible Entity shall contact
the appropriate Department District Office daily to confirm the volumes of stormwater
discharged., the current statusbf any flooding to the area covered, and to discuss,.fhe
need to continue any further activities,.including pumping,, under this Order. The,
Responsible Entity shall additionally notify the above offices when pumping activities
cease. Notification shall be made verbally or by email and followed up in writing within 3
days.
B. No impacts to dunes or dune Vegetation are authorized. In the event.any
vegetation is impacted, the,Responsible Entity is responsible for restoring the area to
pre-project,Conditions.
C. All pumping activities shall be monitored by at least one individual
employed by the Responsible Entity at all times.
D. The outfall of the discharge pipe shall be located below the mean high
water line at all times.
3
E. When pumping activities begin, the applicable County Health Unit as well
as the State Department of Health shall be notified, so that appropriate advisory
warnings and posting may occur.
F. Construction related activities are authorized to occur on the nesting
beach seaward of the dune crest under the following conditions;
1). A daily marine turtle nest survey of the nesting beach in the vicinity of the
project (including areas of. beach access) shall be conducted each day Until completion
of the activity.All nests in the project area and on the beach between the project and
access sites shall be marked by stake and survey tape or string in a.circle With a radius
of-ten (10)feet or as needed to ensure the safety of the nest. No construction activities
shall enter the circle marking the nest and no.adjacent construction shall be allowed that
might directly or indirectly disturb the area Within the staked circle.
2) Nest inventories.shall be conducted on all.rnarked nests in accordance
With Florida Fish and Wildlife Commission's (FWC)Sea Turtle-Protection -Guidelines.
3). No construction activity may commence until completion of the marine
turtle survey each day. Please contact the FWC to coordinate all man*ne turtle protection
requirements.
4). It is the responsibility of the Responsible Entity to ensure that the project
area and access sites are surveyed for marine turtle nesting activity. All nesting
surveys, nest relocations screening_or caging activities etc. shall be conducted only by
persons:with prior experience and training in.these activitiesandwho is duly authorized
to conduct such.activitiOs through a valid permit issued by the FWC, pursuant to Florida
Administrative Code 68E•1.
4
5). All excavations and temporary alteration of beach topography shall be
filled or leveled to the natural beach profile after project completion. The beach
surface shall be inspected subsequent to completion of the project and all tracks,
impressions, scarps, or:ponding due to.the project or movement of heavy
equioment,across the beach shall be removed.
6). No temporary Fighting of the project area is authorized.
2. This Order does not provide relief from the.requirements of other federal,
state,water management districts, and local agencies, .if applicable. This Order
therefore does not negatethe need for the facilities to obtain any other required permits
or authorizations-, nor from the need to comply with all,the requirements of those
J
agencies. This Order does not provide relief from any of the requirements of Chapter
471 of the Florida Statutes regarding professional engineering.
3. Failure to comply with any condition set.forth in this Order shall constitute
a violation:of a Department Final Order under Chapters 161,373-and 403 of.the Florida
Statutes, and enforcement proceedings may be brought. in any appropriate
administrativeor judicial forum.
4. This:Emergency Final Order shall take effect immediately upon.,execution
by the Secretary of the.Department, or his designee, and shall expire on November 2,
2016, unless modified., extended; or-cancelled by further Order.
NOTICE OF RIGHTS
Pursuant to Section 120.569(2)(n), Florida Statutes, any party adversely affected
by this Order has the right to seek an injunction of this Order in circuit court or judicial
review of it under Section 120.68, Florida Statutes. Judicial review must be sought by
5
filing anotice of appeal under Rule 9.110 of the Florida Rules of Appellate Procedure.,
With the Clerk of the Departmentin the Office of General Counsel, 3900 Commonwealth
Boulevard, Mail Station#35,Tallahassee, Florida 32399-3000, and by filing a copy of the
notice of appeal, accompanied by the applicable filing fees, with the appropriate distfict
court of appeal. The notice of appeal must be filed within thirty(30}days-after this Order
is filed With the Clerk
lerk of theDepartment
DONE AND,ORDERED on this � dayof October,,2016, in.Tallahassee, Florida.
F 4 A DEPARTMENT OF.
NIMtNTAL PROTECTION
Jonathan P. Soverso#, Secretary.
3900 Commonwealth Boulevard
Tallahassee, Florida 32899-3000
FILED.on'this date, pursuant,to
. .5.2 Florida atutes, with the
n0ted Depart ent Clerk, receipt
hefi6b ckh,oWledged.
C
DATE:
6
r
.STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
In re:
EMERGENCY AUTHORIZATION FOR OGC NO. 16-1319
REPAIRS, REPLACEMENT,
RESTORATION, AND CERTAIN
OTHER MEASURES MADE NECESSARY
BY HURRICANE MATTHEW
EMERGENCY FINAL ORDER
Under Sections 120.569(2)(n), 252.36, and 252.46, Florida Statutes, and upon
consideration of the State-of Florida, Executive Order No. 16-230 and the following
findings of fact, the State of Florida Department of Environmental. Protection
(Department) enters this Emergency Final Order(Order), including Findings of Fact and
Conclusions .of Law, in response to the imminent or immediate danger to the public
health, safety, and welfare of the citizens of the State of Florida resulting from the
devastation wrought by Hurricane Matthew (hereinafter"the Hurricane").
FINDINGS OF FACT
1. Hurricane Matthew is a major Hurricane traveling north through the
Bahamas. The National Hurricane Center forecasts that the Hurricane will tum
northwest toward Florida and travel along Florida's east coast. The Hurricane poses a
severe threat to the State of Florida and requires that timely precautions are taken to
protect the communities and critical infrastructure and the general welfare of this State.
The Hurricane is likely to cause significant impact and widespread damage throughout
the State of Florida which shall constitute the area covered by this Emergency Final
Order. This area shall herein be referred to as the "Emergency Area."
1
2. By State of Florida Executive Order No. 16-230, the Governor declared
that a state of emergency exists throughout the state, based upon the serious threat to
the public health, safety, and welfare posed by the Hurricane.
3. The Department finds that the Hurricane has-created a state of emergency
threatening the public health, safety, welfare, and property throughout the Emergency
Area. As a result of the emergency, immediate, action by Florida's citizens and
government is necessary to repair, replace, and restore structures, equipment, surface
water management systems, works, and other systems damaged by the Hurricane.
4. The Department finds that .an emergency authorization is required to
address the need for immediate action because.the normal procedures for obtaining the
necessary authorizations would not result in sufficiently timely. action to address the
emergency.
5. The Department finds:that.immediate, strict compliance with the provisions
of the statutes, rules, or orders noted within this Order would prevent, hinder, or delay
necessary action in coping with the emergency, and that the actions authorized under
this Order are narrowly tailored to address the immediate need for action and are
procedurally appropriate under the circumstances.
CONCLUSIONS OF LAW
1. Based on the findings recited above, it is hereby concluded that the
emergency caused by the Hurricane poses an 'immediate danger to the public health,
safety, or welfare and requires an immediate order of the Department.
2
2. Under State of Florida Executive Order No. 16-230, and Sections
120.569(2)(n), 252.36, and 252.46, Florida Statutes, the Secretary, or designee, of the
Department is authorized to issue this Emergency Final.Order.
3. Suspension of statutes and rules as noted within this.Order is required so
as not to prevent, hinder, or delay necessary action in coping with the emergency.
THEREFORE, lT IS ORDERED:
A. WASTE MANAGEMENT
Within the Emergency Area:
1. Storage Tank Svstems
Owners and operators of storage tank systems regulated.under Chapters 62-761
and 62-762, Florida Administrative Code., and their licensed engineers and contractors,
are authorized to make all necessary repairs to restore essential services and repair or
replace (as necessary) all structures, :equipment, and.appurtenances of the systems to
their pre-Hurricane permitted or: registered condition without prior notice to the
Department. Within thirty (30) days. of commencing the work of such repair or
replacement; however, the owner or operator shall notify the Department _in writing,
describing the nature of the work, giving its DEP Facility I.D. for the location, and
providing the name, address, and telephone number of the representative of the owner
or operator to contact.concerning the work.
2. Solid Waste Management
a. Field authorizations may be issued prior to or following a site inspection by
Department personnel or a delegated local program for staging areas to be used for
temporary storage and, chipping, grinding, or, burning of Hurricane-generated
3
IJ
debris. Field authorizations may be requested by providing a notice to the District Office
of the Department containing a description of the staging area design and operation, the
location of the staging area, and the name, address, and telephone number of the site
manager. Field authorizations also may be issued by Department staff without prior
notice. Written records of all field authorizations shall be created and maintained by
Department staff. ,Field authorizations may include specific conditions for the operation
and. closure of the staging area, and may include a required closure date which extends
beyond the expiration date of this Order. Staging areas shall avoid wetlands and other
surface waters to the greatest extent possible; such areas. that. are used or affected
must be fully .restored upon cessation of use of the area. Staging areas must cease
operation, and. all Hurricane-generated debris, must be removed from the site, by the
expiration date of this Order, unless a different closing date or closure conditions are
specified in the field authorization. Failure to comply with the conditions. of the field
authorization, or failure to adequately close the site by the required closure date, may
result in enforcement actions by the Department. Field authorizations issued prior to
the effective date of this Order remain in effect but may be modified by the Department
to include conditions and closure dates as specified herein.
b. Hurricane-generated vegetative debris which is managed at an authorized
staging area may be disposed of in permitted lined or unlined landfills, permitted land
clearing debris facilities, or permitted construction and demolition debris disposal
facilities. Such vegetative debris may also be managed at a permitted waste
processing facility or a registered yard trash processing facility in accordance with the
terms of the applicable rules and permit conditions.
4
C. Construction and demolition debris that is mixed with other Hurricane-
generated debris need not be segregated from other solid waste prior to disposal in a
lined landfill. Construction and demolition debris that is either source-separated or is
separated from other Hurricane-generated debris at an authorized staging area, or at
another area specifically authorized by the Department, may be managed at a permitted
construction and demolition debris disposal or recycling facility upon.approval by the
Department of the methods and operational practices used to inspect the waste during
segregation.
d. Except as otherwise specifically provided herein, Hurricane=generated
debris shall be .disposed of in a Class i landfill or, except for asbestos-containing
materials, in a waste-to-energy facility. Non-recyc.lables and residuals generate from
segregation of Hurricane-generated debris shall also be disposed of in a Class I landfill
or waste-to-energy facility.
e. Ash residue from the combustion of Hurricane-generated vegetative debris
may be disposed of in a permitted disposal facility, o.r may be land spread in any areas
approved by local,government officials except in welifield protection areas or water
bodies.-
f.
odies:f. Ash from the combustion of other Hurricane-generated debris shall be
disposed of in a Class I landfill. Metals or other non-combustible materials segregated
from the ash residue may also be disposed of in an unlined, permitted landfill.
g. Unsalvageable refrigerators and freezers containing solid waste such as
rotting food that may create a sanitary nuisance may be disposed of in a Class I landfill;
provided, however, that chlorofluorocarbons and capacitors must be removed and
5
recycled to the greatest extent practicable using techniques and personnel meeting the
requirements of 40 CFR'Part 82.
h. Permitted landfills, waste-to-energy facilities, and transfer stations which
accept Hurricane-generated debris in accordance with the.terms of this Order may
accept Hurricane-generated debris for disposal or .storage without the need to first
modify existing solid waste permits or certifications. Operators of landfills shall seek
modifications of their existing permits. to address any long-term impacts of accepting
Hurricane-generated debris on operations and closure that are not addressed in existing
permits. Long-term impacts are those which will extend past the expiration date-of this
Order. The requests for modification shall be submitted as soon as possible, but no
later than the expiration date of this Order. No permit fee will be required for any
modifications necessitated solely by the Hurricane cleanup activities. This paragraph
does not authorize the permanent lateral or vertical expansion of any facility beyond its
permitted limits.
i. Domestic wastewater residuals may _be disposed of in Class I landfills
even if such residuals meet the definition of a liquid waste 'found in Rule 62-
701..200(65), Florida Administrative Code, provided that such disposal is approved in
advance by the Department and that the material is managed to the extent practicable
so as to minimize liquid content, odors, and runoff.
3. Hazardous.Waste Management
A blanket approval of timeextensions under Chapter 62-730, Florida
Administrative Code, is necessary within the Emergency Area for hazardous .waste
generators for the storage of their hazardous wastes on-site, pending the cleanup of the
6
Hurricane damage and restoration of essential services. The rules authorize a thirty-
day extension because of unforeseen and uncontrollable circumstances. The specific.
effects of the Hurricane were unforeseen and uncontrollable. Therefore, to avoid having
to issue .a potentially large number of individual approvals on a case-by-case basis and
waste limited agency resources during the time of emergency, the Department
authorizes a general extension of time of thirty (30) days from the expiration of this
.Order for all such hazardous waste generators for the storage of their hazardous wastes
on-site, in the counties within the Emergency Area.
B. AIR RESOURCE MANAGEMENT
Within the Emergency Area:
1. Air Curtain Incinerators
Local governments or their agents may conduct the :burning of Hurricane-
generated yard trash, other vegetative debris, and untreated wood from construction
and demolition debris in air curtain incinerators in accordance with the provisions of
Section 403.7071(6:), Florida Statutes. In operating any air curtain incinerator pursuant
to this Order, the pit width shall not exceed 12 feet, vertical side walls shall be
maintained, and waste material shall not be loaded into the air curtain incinerator such
that it protrudes above the level of the air curtain. Ash shall not be allowed to.build up in
the pit higher than one-third the pit depth or to the point where the ash begins to impede
combustion, whichever level is lower. Refractory-lined air curtain incinerators may
operate 24 hours per day. Air curtain incinerators without refractory-lined walls may
operate 24 hours per day provided reasonable efforts are made to prevent nuisance
7
smoke. Notwithstanding the provisions of this paragraph, the burning of asbestos-
containing materials or hazardous waste is prohibited.
2. Open Pile Burning-
Only
urningOnly vegetative material can be burned on an open pile. Open pile burning of
vegetative debris is managed under the authority of the Florida .Forest Service in the
Department of Agriculture and Consumer Services, .and the Department will defer to
decisions made by that agency, provided that burning does not occur in wetlands or
other surface waters. Open pile burning shall avoid adversely affecting wetlands and
other surface waters to the greatest extent possible; any wetland or other surface water
areas that are used or affected must be fully restored upon cessation of use of the area
in consultation-with the Department.
3. Other Air Pollution Sources
The Department authorizes the minor repair of any previously permitted
stationary source of air pollution that was damaged by the Hurricane to restore it toits
previously permitted condition without prior notice to the Department. Within thirty (30)
days of commencing-such repairs, however, the permittee shall notify the Department in
writing, stating the location and nature of the work, and providing the name, address,
and telephone number of the representative of the permittee to contact concerning the
work. Minor repairs are repairs that would not constitute reconstruction under any
definition of 40 CFR Part 60, 61, or 63, and that could not affect potential to emit any
pollutant. Repairs that would constitute reconstruction under any definition of 40 CFR
Part 60, 61, or 63, and that could affect potential to emit any pollutant are not authorized
by this Order.
8
4. Asbestos Cleanup
The Department waives the requirement for 10-day prior notification for
emergency demolition or emergency cleanup of asbestos-containing material resulting
from the Hurricane. Within one (1) business day of commencing such demolition or
cleanup, however, the person responsible for such work shall notify the Department in
writing. The notification shall be consistent with the information on the Notice of
Demolition or Asbestos Renovation, and. shall include the DEP Facility I.D. for the
location, and providing the name, address, and telephone number of the representative
of the owner or operator to contact concerning the work. The procedures in 40 CFR 61
Subpart M for handling asbestos-containing material shall be complied with during
demolition and cleanup. Asbestos-containing material shall be disposed.of in a Class I
or 111 landfill in accordance with Rule 62-701:520(3), Florida Administrative
Code. Burning of asbestos containing material.is prohibited.
C. WATER RESOURCE MANAGEMENT
Within the Emergency Area:
1. Definitions
The following definitions apply to activities authorized under Section C of this
Order:
a. For purposes of subsection C.2. of this Order, the term "structures"
includes:
(1) Utility infrastructure, including wastewater treatment plants, substations,
lift stations, solid and hazardous waste facilities, utility lines (including transmission and
9
0
distribution), poles, towers, support structures, cables, conduits, outfalls, intake
structures, and pipelines;
(2) Roads, bridges, culverts, driveways, sidewalks, bike paths, and other
similar public and private infrastructure;
(3) Public, private, and commercial habitable and non-habitable buildings, and
structures.ancillaryto these buildings, such as garages, cabanas, storage .sheds, bath
houses, pools, and decks;
(4) Piers:;(including docks, boardwalks; observation platforms, boat houses, ,
N
and:gazebos),and pilings;
41y
" � •yl
('5) Shore=stabilization structures,. such as seawalls, bulkheads, revetments, �-
breakwaters, and groins;
(6) Fences, signs, and billboards; and
(7) Buoys, navigational aids, and channel markers.
b. For purposes of subsection C.2.:of this Order, the term "drainage systems"
includes ditches, canals, ponds, 6wales, and other surface water conveyances; dams,
weirs, dikes, and levees; underdrains,.outfalls, and associated water control structures.
C. For purposes.of subsections C.2., C.3., and C..4. of this Order, the term
"water dependent activity" means an activity that:can only be conducted in, on, over, or
adjacent to water areas because the activity requires direct access to the waterbody or
state owned submerged lands for transportation, recreation, energy production or
transmission, or source of water, and where the use of the water or state owned
submerged lands is an integral part of the activity.
10
1 1
d. For purposes of subsections C.2. and C.3. of this Order, the term
"completely destroyed" means none of the structure that existed before the Hurricane
remains standing. For example, if at least one piling of a dock or pier remains in place
as constructed, then the structure has not been completely destroyed.
e. For purposes of this Order, the term "water management districts" shall
mean the Northwest Florida, St. ,Johns River, Suwannee River, Southwest Florida, and
South Florida Water Management Districts, as they are affected within the Emergency
Area.
2. Environmental Resource, Dredge and. Fill, and Surface Water
Management Activities
This subsection applies to activities located in uplands and waters of the state;
including wetlands, but excludes activities located along. the sandy beaches or inlets
fronting the Atlantic Ocean and the Gulf of Mexico-seaward of the:Coastal Construction
Control Line {CC.CL) in counties where a CCCL has been established (these activities
are addressed in subsection C.3. of this Order.). The public is advised that Sections
403 813(1)(b), (d), (e), (f), (g), (h), 0), (1), (n), (p), or (t), Florida Statutes, and the
corresponding rule exemptions of the Department arid water management districts,
authorize ..certain repair, restoration, and replacement activities, provided the terms,
conditions, and limitations of the exemptions are followed. Such activities located in,
on, or over state owned submerged lands that do not qualify for consent under Rule 18-
21.005(l)(0), Florida Administrative Code, are hereby granted. a Letter of Consent under
Rule 18-21.005(1)(c), Florida Administrative Code, provided all the terms and conditions
of those rules are met (including certain restrictions for activities performed within
11
aquatic preserves and Monroe County), and provided that activities that require an
easement under Rule 18-21.00(1)(f), Florida Administrative Code, must obtain the
applicable state owned submerged lands easement under Chapter 18-21, Florida
Administrative Code, within one year of expiration of this Order. This Order does not
limit the provisions of those statutory and rule provisions. The following activities are
authorized to be undertaken in the Emergency Area to repair, restore, or replace
structures, land, and submerged contours to the conditions that were authorized or
otherwise legally existing immediately prior to the Hurricane, provided the repair and
restoration activities do not result in any expansion; addition, or relocation of the existing
structure or systems., subject to the limitations in this Order. However, this Order does
not authorize the construction of structures that did not exist prior to the Hurricane,
unless specifically.authorized below.
a. No Notice Required.
The following, activities are authorized tobe conducted under this Order without
notification to the. Department or water management district:
(1) Temporary and permanent repair or restoration of structures and drainage
systems that are not completely destroyed to the conditions, dimensions, and
configurations that were authorized or otherwise legally existing immediately prior to the
Hurricane, provided the repair-arid restoration activities do not result in any expansion,
addition, or relocation of the existing structure or systems, and provided any such
structures or drainage systems in, on, or over state owned submerged lands are water
dependent. This may include the use of different construction materials or minor
12
deviations to allow upgrades to current structural and design standards, or to replace a
seawall with a riprap revetment.
(2) The restoration (regrading, dredging, or filling) by local, regional, and state
governments of upland surfaces, wetlands, and submerged land contours to the
conditions and configurations that were authorized or otherwise . legally existing
immediately prior to the Hurricane, provided the restoration does not result in any
expansion or addition of. land or deepening of waters beyond that which existed
immediately prior to the Hurricane, subject to the following limits:
(a) The removal or deepening of plugs formerly separating canals from other
waters is specifically not authorized by this-Order;
(b) In the case of dredging, all excavated material shall either be deposited on
uplands that are diked or otherwise sloped or designed to prevent any discharge into
wetlands or other surface waters, or shall be used to restore bottom contours and
shorelines to the conditions existing immediately prior to the Hurricane, .subject to (c),
below,
(c) In the case where upland or dredged material is placed in.water to restore
pre-existing conditions, only clean material (free from debris and pollutants) from the
uplands that existed prior to the Hurricane may be used in the restoration, and no
Change (.from the conditions that legally existed immediately prior to the Hurricane) in
the slope of the land or the type; nature, or configuration .of any pre-existing shoreline
stabilization materials is authorized (e.g., :sloping revetments cannot be replaced with
vertical seawalls, and rock rlprap cannot be replaced with interlocking blocks);
13
f
(d) Best management practices and devices such as hay bales, mulch, and
floating turbidity screens shall be used to prevent violations of state water quality
standards for turbidity during the performance of restoration activities, in accordance
with the guidelines and specifications in the Florida Stormwater, Erosion; and Sediment
Control Inspector's Manual(Florida Department of Environmental Protection and Florida
Department of Transportation, Sixth Impression, July 2008,
http:/Iwww.dep.ste to-fl.us%water/noni)oint/docs/erosion/erosion-inspectors-.manual.pdf);
and the State of Florida Erosion and Sediment Control Designer and Reviewer Manual
(HydroDynamics Incorporated in cooperation with Stormwater Management Academy,
June 2007,
http://www.dot.state.fl.us/construction/Engineers/Environment/PagesErosionSedimentM
anual 0309..pdf). Best.management practices also shall be used to prevent erosiorn.and
retain sediment of all newly established:or restored exposed shorelines during and after
the restoration activities, which may include methods.such as planting of temporary and
permanent vegetation, and placing of clean natural rock or .concrete rubble nprap;
(e) Any fill that is deposited to restore a former shoreline, and any, riprap that
is used to stabilize:a shoreline, must not be placed any farther waterward than the toe of
slope of the shoreline that legally existed immediately prior to the Hurricane. If the pre-
Hurricane shoreline was stabilized with a functioning seawall or riprap, the seawall or
riprap may be restored at its former location or within 18 inches (or, within an aquatic
preserve, 1 foot) waterward of the location where the seawall or riprap legally existed
immediately prior to the Hurricane, as measured from the face of the existing seawall
14
slab to the face of restored seawall slab or from the front slope of the. existing riprap to
the front slope of the restored nprap; and
(f) This section shall not constitute authorization to fill submerged lands
owned by the Board of Trustees of the Internal Improvement Trust Fund, except as
provided above.
(3) Removal of debris, including sunken or grounded vessels, vegetation, and
structural remains that have been deposited into waters, wetlands, or uplands by the
Hurricane, where such removal .does not result in filling of wetlands or other surface
waters, or dredging that creates or expands surface waters. All removed materials must
be deposited on self-contained uplands and must be managed in accordance with
Department rules or provisions of this Order.
b. Field and.Individual Authorization Required
(1) Field authorizations may be- .issued following a site inspection by
Department or water management district personnel to restore structures and property
• r
to :authorized or otherwise. legally existing conditions that existed immediately prior to
the Hurricane, recover property, protect property from further damage, maintain
navigation, or protect public health, safety, and welfare, when such activities are not
otherwise authorized by-statutory or rule exemptions or under paragraph C.2.a. of this
Order. Specifically, field authorizations may be issued for:
(a) Activities including the replacement of structures that are completely
destroyed;
(b) Activities on state owned submerged lands that are not water dependent;
15
(c) Restoration (regrading, dredging, or filling) of the contours of uplands,
wetlands, and submerged bottoms by parties other than local, regional, or state
governments;
(d) Trimming or alteration of mangroves. that threaten public health, safety,
welfare, or property, or that currently interfere with navigation;
(e) Removal of debris, including sunken or grounded vessels, vegetation, and
structural remains that has been deposited into waters, wetlands, or uplands by the
Hurricane, the removal of which requires filling of wetlands or other surface waters, or
dredging that creates or expands wetlands or other surface waters. Any wetlands or
other surface waters that are dredged or filled to affect such removal must be. restored
to the contours and conditions that existed before the Hurricane; and
(f) Other activities determined by Department or wafer management district
personnel as having the potential to result in only minimal adverse individual or
cumulative impact on water resources andwater quality.
(2) Field authorizations to replace structures. shall not preclude the use of
different construction. materials or minor deviations to allow upgrades to current
structural.and design standards, including, building cordes, or to a more environmentally
compatible design, as determined by the Department or water management district.,
than existed immediately prior to the Hurricane.
(3) Field authorizations may be requested by providing a notice to the District
Office of the Department or water management district containing a description of the
work requested, the DEP Facility 1.D. for the location, and providing the name, address,
and telephone number of the representative of the owner or operator to contact
16
conceming the work. Field authorizations also may be issued by Department or water
management district personnel without prior notice. Field _authorizations may not be
issued unless requested on or before November 2, 2016. Written records of all field
authorizations shall be created and maintained by Department and water management
district personnel. Field authorizations may include specific. conditions for the
construction, operation, and maintenance of the authorized activities. Field
authorizations issued prior to the effective date of this Order remain in effect for the
duration specified in the field authorization, but may be extended through written
modification by the Department or water management district in accordance with the
provisions of paragraph CA.h. of this Order.. Failure to comply with the conditions of'the
field authorization may result in enforcement actions by the Department or water
management district.
3. Coastal.Construction Control Line Activities
This section applies to. activities conducted within the Emergency Area seaward
of the CCCL as established by Chapter 62B-26, Florida Administrative Code.
Emergency permits may be issued by the Division of Water Resource Management
(Division) pursuant to Rule 62B-3.3.014, Florida.Administrative Code. A list of activities
seaward of the CCCL that are exempt from CCCL permitting requirements is contained
in Rule 62B-33:004, Florida Administrative Code, and Section 161.058(l 1), Florida
Statutes. You may contact the Division directly by mail at 2600 Blair Stone Road, Mail
Station 43500, Tallahassee, Florida 32399-2400, by phone at 850/245-7665, or by fax
at 850/245-8356.
17
This Order does not authorize the. construction of permanent structures that did
not exist prior to the emergency, nor does it authorize beach scraping performed by
itself or in association with any other activities. In addition, activities that extend onto
state owned lands. of Florida seaward of the mean high-water line that would typically
require a permit pursuant to Sections 161.041 and/or 161.055, Florida Statutes, (i.e.,
regulated under the Joint Coastal Permit program (JCP)) are not authorized under this
subsection. JCP activities are addressed separately-in subsection CA. of this Order.
a. Activities Undertaken by Local Governments, the Department's
Division of Recreation and Parks, Florida Department of Transportation,
and Utility Companies
The following activities may be undertaken * by local governments, the
Department's Division of Recreation and Parks, Florida Department of Transportation,
and utility companies to protect, repair, or replace structures and property without notice
to the Department-or water management district, subject to the limitations below. Work
performed.under paragraph C.3.8. must be..completed by November 1, 2017.
(1) Removal of Hurricane generated debris: Prior to removing Hurricane-
generated debris, and to the greatest extent possible, beach compatible sand should be
separated from the debris and kept on-site. To prevent debris from becoming buried, all
Hurricane-generated debris shall be removed prior to conducting any fill activities.
(2) The repair of the following public facilities:. utilities, roads, and beach
access ramps.
(3) Return of sand to the beach and dune system that has been deposited
upland by the Hurricane, and restoration, of a damaged dune system using beach
18
compatible sand from an upland source. The fill material shall not cover any Hurricane-
generated debris or construction debris. All fill material shall be sand that is similar to
the pre-Hurricane beach sand in both coloration and grain size and be free of debris,
rocks, clay, or other foreign matter. No sand may be obtained from the beach or below
the mean high water line seaward .of the CCCL without specific written authorization
from.the Department.
b. Activities Requiring Local Authorization
Local governments are authorized to issue permits in lieu of Department permits
to private and public property owners for the activities listed below. Local governments
shall notify the Department in writing within three (3) business days of permits issued
under this section. Work authorized by focal governments must be completed within
ninety(90)days of the expiration of this Order.
(1) Temporary or remedial activities-that are necessary to secure structures in
order to removesafety hazards.and prevent further damage or collapse of foundations.
(2) Temporary wooden retaining walls,. cantilever sheetpile walls (without
concrete caps, tiebacks, or,other reinforcement), sandbags less than 100 lbs. filled bag,
or similar structures. Temporary armoring must be removed within sixty (60.) days of
installation, or the individual must seek authorization from the Department within sixty
(60) days of installation, in order to keep the temporary armoring in place.
Pursuant to. Section 161.065(3), Florida Statutes, this Order does not
authorize local governments to permit geotextile containers as the core of a
reconstructed dune for the purposes of temporary armoring.
19
(3) Repair or replacement of minor ancillary structures (such as stairs,
landings, and HVAC platforms) and services utilities that are associated with the
existing habitable structure. The repair of minor ancillary structures or service 'utilities
shall not exceed the size of the original structure or service utility damaged or destroyed
by the Hurricane. Repair of surviving beach/dune walkovers is authorized provided .the
structure is.substantially intact .and the repair allows for adjustments to be made to the
seaward terminus of the walkover if necessary to accommodate changes in the
shoreline topography and native salt-resistant vegetation patterns resulting from the
post-Hurricane recovery-of the beach and dune system.
(4) Permanent repair of foundations for buildings that have not been
substantially damaged.
(5) The replacement or repair of caps and anchoring systems (or tiebacks)for
seawalls or bulkheads.
(6) Restoration of a damaged dune system using beach compatible sand from
an upland source.
All fill material shall be sand that is similar to the pre-'Hurricane beach sand in
r
both coloration and grain size and be free, of debris, rocks, .clay, or other foreign
matter. No sand may be obtained from the beach or below mean high water seaward of
the CCCL without specific written authorization from the Department.
(7) Return of sand to the beach dune system which has been deposited
upland by the Hurricane.
The recovered fill material shall be free of debris and not cover any Hurricane-
generated debris or construction debris.
20
C. Other Activities
(1) Actions taken by local governments, the Department's Division of
Recreation and Parks, Florida Department of Transportation, and utility companies
under paragraph C;3.a., and actions taken by local governments under paragraph
C.3.b. of this Order, do not require additional permits from the Department.
(2) Subsection C.3. does not authorize the following activities:
(a) Permanent repair of foundations of major structures which have been
substantially damaged;
(b) Rebuilding of, or substantial improvements to, major structures;
(c) The repair or reconstruction of coastal or shore protection :structures
except
as allowed under subparagraph C.3.b.(5).; or
(d) Replacement of walkover structures, retaining walls, decks, gazebos, and
other similar structures.
(e) Local governments to permit geotextil'e containers as the core of a
reconstructed dune for the. purposes of temporary armoring.
(3.) Activities not covered by subsection. C.3. of this Order may require a
permit from the Department under Section 161.053, Florida Statutes, and Chapters
62B-33 or 62B-34, Florida Administrative Code. For, more information, please contact
the Division of Water Resource Management by mail at 2600 Blair Stone Road, Mail
Station #3500,: Tallahassee, Florida 32399 2400, by phone at 850/245-7665, or by fax
at 850/245-8356.
4. Joint Coastal Permit Activities
21
i
This subsection applies to certain activities along the natural sandy beaches of
the Atlantic Ocean or the Gulf of Mexico that extend onto sovereignty lands of Florida,
seaward of the mean high-water line (MH1 VL), and:are likely to. have a material physical
effect on the coastal system or natural beach and inlet.processes, Le., :activities that are
regulated under the JCP program, pursuant to Sections 161.041 and/or 161.055,
Florida Statutes.
a, In lieu of a JCP for activities summarized above, federal, state, or local
governments may apply to the Beaches, Inlets and Ports Program (Bureau) for
emergency authorizations to alleviate hazardous conditions resulting from the Hurricane
that pose an- immediate danger to fife or limb, including sudden and unpredictable
hazards to navigation. in order to be eligible for an emergency authorization under
subsection C.4: of this Order, an applicant must meet theT following.criteria:
(1) The application must be received by the Bureau within thirty (30) days of
issuance of the Department's Order at the following.email address: BIPP" ,dep.state.fl.us
(2) The hazardous conditions are :a result of the Hurricane :identified in the
Department's Order and did not.exist prior to the Hurricane.
(3) The proposed measures are limited to the minimum amount necessary to
alleviate the hazardous conditions by temporarily stabilizing the structure or clearing the
channel, until a JCP application can be processed to.address.the long-term repair;
(4) Fill material shall not extend seaward of', the MHWL that existed
immediately before the Hurricane;
(5) Navigational dredging shall not exceed channel depths that existed
immediately before the Hurricane;
22
(6) Reconstruction of non-water dependent structures on sovereign
submerged lands is prohibited;
(7) Fill may only be placed seaward of the MHWL to temporarily stabilize an
upland structure, if that structure is in danger of imminent collapse and that structure
was located behind the primary dune line prior to the Hurricane;
(8) The placement of fill may only extend the MHWL seaward of the current
(post-Hurricane) location if the applicant provides proof that the riparian owner(s) has
obtained a disclaimer from the Departments Division of State Lands, under Rule 18-
21.019, Florida Administrative Code, for the proposed project site, a memorandum from
the Department's. Division of State Lands acknowledging the storm-related occurrence
of avulsion for-the proposed project site; or documentation from the Department.that a
valid erosion control line has been:established at the fill site.
l
(9) Any fill material placed on the .beach must meet the criteria for beach-
quality sand in Section 62B-41.007(2)0), Florida Administrative Code;
(10) The.proposed measures must not cause water quality violations outside of
the mixing zone, established pursuant to Rule 624.244, -Florida Administrative Code;
and
(11) The proposed measures must not adversely .affect persistent hardbottom
communities, seagrass communities, or functional marine turtle nesting habitat, and
shall not contribute to erosion of adjacent properties.
b. Emergency authorizations shall expire ninety(90) days after issuance.
C. Application fees and noticing requirements are waived for projects that are
eligible for this emergency authorization.
23
d. Activities not covered by subsection C.4. of this Order may require a JCP
permit from the Department under Sections 161.041 or 161.055, Florida Statutes, and
Rule 6213-49, Florida Administrative Code. For more information, please contact the
Bureau by email at BIPP a dep.state.fl.us or by phone at 850/245-.7593. If the activities
are associated with the repair of damage from the Hurricane identified in- the
Department's Order, and the applicant can demonstrate that expeditious processing of
the JCP application is necessary to meet state or federal recovery efforts, including
funding deadlines, the Department may deviate from the standard procedures as
follows:
(1) Processing fees may be waived; and
(2) The requirement to publish a Notice of Receipt of Application and a Notice
of Intended Agency Action pursuant to Rule 62B-49.005(8), Florida Administrative
.Code, may be waived, along with the associated 14-day waiting period.
(3) Pursuant to Rule 62B-49:005(9), Florida Administrative. Code, agency
actions under paragraph CA.d. are still subject to rights under Chapter 120, Florida
Statutes.
5. NPDES Stormwater Construction Generic.Permit
This subsection applies to any construction activity authorized .by this Order that
would require coverage under the Generic Permit for the Discharge of Stormwater
Associated with .Large and Small Construction Activities pursuant to Rule 62-
621.300(4.), Florida Administrative Code. For these construction .projects, operators of
the sites, and their licensed engineers and subcontractors, are authorized to make all
necessary repairs to restore essential services and repair or replace (as necessary) all
24
structures to their pre-Hurricane permitted or registered condition without prior notice to
the Department. All best marragement practices must be in accordance with the
guidelines and specifications of the State of Florida Erosion and Sediment Control
Designer and Reviewer Manual, (Florida Department of Transportation and Florida
Department of Environmental Protection, 2013,
hftps://www.flruies.org/Gateway/reference.asp?No=P,ef-04227). Within thirty (30) days
of commencing the work of'such repair or replacement, however, the owner or operator
shall submit to the Department a.completed Notice of Intent to Use Generic Permit for
Stormwater Discharge from Large and Small Construction Activities [Form Number 62-
621.300(4)(b)].
6. General Conditions
a. All activities conducted under subsections C.2., C.3., and CA of this
Order shall be performed using appropriate best management practices in accordance
with the guidelines and specifications in Chapter 6 of -the Florida Land Development
Manual. A Guide to. Sound Land and Water Management, Florida Department of
Environmental Regulation (1988). For activities conducted in or discharging to wetlands
or other surface waters, best management practices include properly installed and
maintained erosion and turbidity control devices to prevent erosion and shoaling, control
turbidity, prevent violations of state water quality standards, and protect the functions
provided by wetlands and other surface waters to fish, wildlife, and listed species.
b. The authorizations in subsections C.2., C.3., and C.4. of this Order shall
not apply to structures and associated activities that were not legally existing or
25
otherwise properly authorized by all applicable agencies before. the passage of the
Hurricane:
C. Applicable environmental resource, surface water management, dredge
and fill, CCCL, and JCP permits shall be required following provisions of statute and
rule for other activities not authorized in this Order that do not otherwise qualify as an
exempt activity under statute or rule..
d. The nature, timing, and sequence of construction authorized under this
Order shall be conducted in such a manner as to provide protection to, and so as to not
disturb, native salt-resistant vegetation and listed species and their habitat,. including
threatened or endangered sea turtles, endangered manatees, endangered beach mice,
endangered plant communities, and migratory shorebirds. If activities conducted under
subsection C.3. of this Order occur during the marine turtle nesting season (March 1
through October 31 in Brevard, Indian River, St. Lucie, Martin, and Broward counties,
May 1 through October 31 in all other coastal counties within the state), such activities
must be coordinated with the Florida Fish and �Idiife Conservation Commission's
Imperiled Species Management Section to ensure that all activities comply with state
and federal requirements for the protection of sea turtles, their nests, hatchlings, and
nesting habitat.
e. ,Nothing in this Order authorizes the taking, attempted taking, pursuing,.
harassing, capturing, or killing of any species (or the nests or eggs of any species) listed
under Rule 68A-27, Florida Administrative Code, or under the Federal Endangered
Species Act.
26
f. Persons.are advised that all structures that are rebuilt should be rebuilt in
accordance with all applicable local, state, and federal building. standards and
requirements of the Federal Emergency Management Agency.
g. It is recommended that, where possible, owners of property should
maintain documentation (such as photos) of the condition of the structures or lands as
they existed prior to initiating any activities authorized under this Order, and should
provide such documentation to the Department if requested to do so.
h. Activities authorized under subsection C.2. of this Order must be
completed as follows:
(1) By November 1, 2017 for activities that qualify under the No Notice
provisions of paragraph C.2.a. of this Order;
(2) By the. date specified in the field authorization far activities that qualify
under the provisions of subparagraph 13:2.b.(1). of this Order.. However, the deadline
for completing such activities may be extended if a written request with accompanying
documentation as described below is submitted by the person(s) authorized in the field
authorization and received by the District Office of the Department that issued the field
authorization at least thirty (30) days prior to expiration of the field authorization. Such
request must be accompanied by a statement that contractors or supplies are not
available to complete the work, or that additional time is needed to obtain any required
authorization from the U.S. Army Corps of Engineers. The permittee should maintain a
list of contractors that have been contacted and a record of supplies that are on
backorder as needed to demonstrate compliance with this provision..
7. Authorization to Use State Owned Submersed Lands
27
The Department has been delegated by the Board of Trustees of the. Internal
Improvement Trust Fund the authority to grant the following authorizations to use state
owned submerged lands, that is, lands lying waterward of the line of mean high water,
erosion control line, or ordinary high water line, in association with the structure or
activity subject to repair, restoration, removal, or replacement authorized in this,section.
a. Except as provided in paragraphs C.6.4.; c.,-and d., and subsection D.1.
of this Order, activities authorized under this Order involving the repair, replacement, or
restoration of the activities and structures, and the removal of debris located on
submerged lands owned by the state. that do not qualify- for,consent by rule under
Section 18-21.005(1)(b), Florida Administrative Code, are hereby granted a Letter of
Consent under Section-18-21.005(1)(c), Florida Administrative Code, provided:
(1) Such repair; restoration; replacement, or removal is conducted in
accordance with the terms, conditions, and,limitations of this Order;
(2) The structure or activity subject to repair, restoration, or replacement was
authorized by the Board of Trustees of the Internal Improvement Trust Fund prior to the
Hurricane, or was otherwise legally existing immediately prior to the Hurricane;
(3) The activities are conducted solely to repair, restore, or replace structures
or land that was damaged by the Hurricane, or to..remove debris resulting solely from
the Hurricane; and
(4) The structures and activities are repaired, restored', or replaced in the
same location_ and configuration as was authorized by the Board of Trustees of the
Internal Improvement Trust Fund or which otherwise legally existed immediately prior to
the Hurricane.
28
(5) All the terms and conditions of Rule 18-21.005(1)(b) [Consent by Rule] or
18-21.005(1)(c) [Letter of Consent], Florida Administrative Code, as applicable, are met
(including certain restrictions for activities performed within aquatic preserves and
Monroe County), and provided that activities that require an easement under Rule 18-
21.005(1)(f), Florida Administrative Code, must obtain the applicable state owned
submerged lands easement under Chapter 18-21, Florida Administrative Code, within
one year of expiration of this Order. This Order does not limit the provisions of those
statutory and rule provisions.
a. Non-water dependent structures, grandfathered, are not authorized to be
repaired, restored., or replaced when more than 50 percent of the structure or activity is
lost(based on the cost to repair, restore, or replace the structure or activity);.
b. Water dependent. structures that were legally existing .immediately before
the Hurricane but not in conformance with the current criteria of Chapters 18-18, 18-20,
or 18-21, Florida Administrative Code, as applicable, may be repaired, restored, or
replaced to the footprint that existed immediately before the Hurricane, but shall, to the
greatest extent practicable, be repaired, restored, or replaced to meet the current
criteria.of Chapters 18-18, 18-20., and 18-21., Florida Administrative-Code, as applicable,
with respect to design features such as the elevation of decking surfaces and spacing of
deck-planking.
C. This Order does not authorize the .reconstruction or repair of.unauthorized
structures.
8. Water and Wastewater Plants and Collection and Distribution
Systems
29
a. Owners and operators of water and wastewater plants and collection and
distribution systems, and their licensed engineers and contractors, .are authorized to
make all necessary repairs to restore essential services and repair or replace (as
necessary) all structures, equipment, and appurtenances of the plants and systems to
their pre-Hurricane permitted or registered condition without prior notice to the
Department. Within thirty (30) days of commencing the work of such repair or
replacement, however, the owner or operator shall notify the Department in writing,
describing the nature of the work, giving. its DEP Facility I.D. for the location, and
providing the name, address, and telephone number of the representative of the owner
or operator to contact concerning the work.
b. Owners and operators of underground injection control Class V Group 6
stormwater and lake level control wells in existence.and functioning immediately before
the Hurricane are authorized, without prior permission by the Department, to lower the
intake structure to allow a greater volume of lake water to flow down the wells when not
to do so would result in immediate flooding of structures not usually inundated by such
lake waters. Within three (3). days of lowering said structures, written notice shall be
provided.to the District Office of the Department in which the structure is located.
9. Suspension of Fees
For those activities noted above, subject to the limitations, duration, and other
provisions of this Order, the following application fee, base fee, and minimal annual
lease fee requirements of Sections 161.041, 161.053, 161.0535, 161.055, and 373.109,
Florida Statutes, and Chapters 18-18, 18-20., 18-21, and 62-4, Florida Administrative
Code, shall be suspended as follows:
30
a. For structures and activities authorized under paragraphs C.2.a.,or C.3.a.
of this Order, the lessee may submit.a written request to the Division of State Lands (at
3900 Commonwealth Boulevard, MS #130, Tallahassee, Florida 32399-30.00) to waive
applicable lease fees. In such cases, the owner must identify and document (such as
with currently-dated photographs.)the area (in square feet) of the structure or facility that
is no longer useable. When such documentation is received and deemed sufficient,
lease fees will be waived, but only for that portion :of the structure that is no longer
useable.
b. When the restoration or replacement of individual structures (such as a
dock or pier) or entire facilities (such as marinas) on state owned submerged lands that
are completely destroyed is authorized by'a field authorization under paragraph C.2.b.
of this Order, applicable lease fees will be waived for the duration described in
paragraph c. below.
C. Lease fees that are waived under paragraphs. a. or b. above,, will be
waived only for the duration of this Order (including. subsequent extensions thereto)
unless otherwise provided in a field authorization issued under paragraph C.2.b. of this
Order, or until. the repairs, restoration, or replacement commences, whichever is
earlier. The duration of the waiver of suspension of lease fees may be extended
beyond the duration of this. Order (including subsequent extensions thereto) or beyond
the date specified in a field authorization issued under paragraph C.2.b. of this Order,
upon a written request by the lessee to extend the waiver of the lease fees. Such
request must be received by the Division of State Lands before the expiration of this
Order (or extensions thereto), or before the date specified in the field authorization
31
(whichever date is later), and must be accompanied by a signed statement that
construction has not yet commenced because contractors or supplies are not available
to commence the necessary repairs, restoration, or replacement, or because additional
time is needed to obtain any required authorization from the U.S. Army Corps of
Engineers or local government. Such request for extension of the waiver of lease fees
must also contain a reasonable. schedule for when repair, restoration, or replacement
will commence..
d. In all cases where lease fees are waived under paragraph a.(1) above, the
lessee must notify the Division of State Lands, at the address stated in paragraph a.,
above, of the time repair, restoration, or replacement construction commenced.
D. GENERAL PROVISIONS
1. General Limitations
The Department issues this Emergency Final Order solely to address the
emergency created by the Hurricane. This Order shall not be construed to authorize
any activity within the jurisdiction of the Department except in accordance with the
express terms of this Order. Under no circumstances shall anything contained in this
Order be construed to authorize the repair, replacement, or reconstruction of any type of
unauthorized or illegal structure, habitable, or otherwise. This Order does not convey
any property rights or any rights or privileges other than those specified in this Order.
2. Suspension of Statutes and.Rules
Within the Emergency Area, the requirements and effects of statutes and rules
which conflict with the provisions of this Order are suspended to the extent necessary to
implement this Order.
32
To the extent that any requirement to obtain a permit, lease, consent of use, or
other authorization is waived by this Order, it should also be construed that the
procedural requirements for obtaining such permit, lease., consent of use, or other
authorization, including requirements for fees and.publication of notices, are suspended
for the duration of this Order, except as provided in subsection C.8.
3. Review of Requests for Field Authorizations
It is the intent of the Department to act on requests for field authorizations in a
timely and expeditious manner. The Department may require the submission of
additional information as is .necessary.
4. Other Authorizations Required
This Order only provides relief from the specific regulatory and proprietary
requirements addressed herein for the duration of the Order, and does not provide relief
from the requirements of other federal, state, water management districts, and local
agencies: This Order therefore does not negate the need for the property owner to
obtain.any other required. permits or authorizations, nor from the need to comply with all
the requirements of those agencies, This Order-does not provide relief from any of the
requirements of Chapter 471, Florida Statutes, regarding professional engineering.
Activities subject to federal consistency review that are emergency actions
necessary for the repair of immediate, demonstrable threats to public health or safety
are consistent with the Florida Coastal Management Program if conducted in strict
conformance with this Order.
5. Extension of time to comply with specified deadlines
33
For facilities and activities regulated by the Department in the Emergency Area,
this Order extends by thirty (30) days the time to comply with the following specified
deadlines that occur between the date of issuance of this Order and the expiration of
this Order:
a. The time deadlines to conduct or report periodic monitoring or any other
similar monitoring that is required by a permit, lease, easement, consent of use, letter of
consent, consent order, consent agreement, administrative order, or other authorization
under Chapters 161, 253, 258, 373, 376, or 403, Florida Statutes, and rules adopted
thereunder, except for monitoring required by air permits issued under Title IV or V of
the Clean Air Act or under the Prevention of Significant Deterioration (PSD) program;
b. The time deadlines to file an application for an extension of permit
duration or renewal of an existing permit, lease, easement, consent of use, letter of
consent, or other authorization under Chapters 161, 253,.258, 373, 376, or 403, Florida
Statutes, and rules adopted thereunder, except for air permits issued under Title V of
the Clean Air Act;
C. The time deadlines to file an application for an operation permit under
Chapters 161, 253, 258, 373, 376, or 403, Florida Statutes, and rules adopted
thereunder, except for air permits issued under Title V of the Clean Air Act;
d. The expiration date for an existing permit, lease, consent of use, or other
authorization under Chapters 161, 253, 258, 373, '376, or 403, Florida Statutes, and
rules adopted thereunder, except for air permits issued under Title V of the Clean Air
Act; and
34
e. The time deadlines to obtain a :permit for :and commence construction of
the initial phase of a system for which a conceptual permit was issued pursuant to Part
IV of Chapter 373, Florida Statutes, or Sections 403.91 —403.929, Florida Statutes, and
rules adopted thereunder.
6. Permit Extensions During States of Emergency
The public is advised that Section 252.363., Florida Statutes, provides for tolling
and extending the expiration dates of certain permits and other authorizations following
the declaration of a state of letnergency. Affected permits,include authorizations granted
by the.Department, water management district, or delegated local government, pursuant
to part IV of Chapter 373, Florida Statutes, and Joint Coastal Permits issued under Rule
6213-49, Florida,Administrative Code.
The extension provisions of Section 252.363, Florida Statutes, do not apply to:
a. Permits that:
(1) Authorize activities that occur outside the geographic area affected by the
declaration of a state of emergency;
(2) Include authorization under a programmatic or regional general permit
issued by the U.S. Army Corps of Engineers;
(3) Are held by a permittee.in significant non-compliance; or
(4) Are subject to a court order specifying an expiration date or buildout date
that would be.in conflict with the.extensions granted iri this section.
b. State owned submerged lands authorizations under Chapters 253 or 258,
Florida Statutes;
c. Formal determinations of the landward extent of wetlands and other surface
35
t , l
waters; or
d. Verifications of exemptions from permitting criteria.
To receive an extension under Section 252.363, Florida Statutes, the holder of a
valid, qualifying permit must notify the authorizing agency in writing within ninety (90)
days of the expiration of a declaration of emergency,. as established in a Governor's
Executive Order. The duration of the tolled period remaining to exercise the rights
under ape rmit shall be equal to six (6) months in addition to the duration of the
declaration of emergency.
7. Deadlines for Agency Actions
For each .of the following offices, any deadlines specified in statutes, rules,
agreements, or Department orders, under which the Department is required by law to
take action within a specified time'period, and under which failure by the. Department to
timely take such action could result in -any type of default binding on the Department,
are hereby suspended and -tolled for a period of seven days from the date of this Order,
provided suchAead line had not expired as of the effective date.of this Order:
a. Each Department office and delegated local program that sustains, within
its geographic boundaries; any significant physical damage occurring as a direct result
of the. Hurricane. This includes. Department offices located outside the impacted area.
that perform any of-their duties in the.impacted area.
b. Any office of the Department not directly impacted by the Hurricane if that
office has deployed staff to any District Office of the Department or delegated local
program specified above, or to any water management district office in an impacted
36
r
area, to assist in Hurricane relief efforts or to supplement the normal staff in those
impacted offices.
8. Expiration Date
This Emergency Final Order shall take effect immediately upon execution, and
shall expire on November 2, 2016.unless modified or extended by further order.
9. Violation of Conditions of Emergency Final Order
Failure to comply with any condition set forth in this Order shall constitute a
violation of a Department Final Order under Chapters 161, 253, 258, 373, 376, and 403,
Florida Statutes, and enforcement proceedings may be brought in any appropriate
administrative or judicial forum.
1.0. Applicability to,Delegated.Programs
The provisions of this Order apply in those cases where a water management
distract, local government, or other entity is acting for the Department in accordance with
a delegation agreement, operating agreement, or contract: Such water management
district, local government, or other entity shall comply with the terms.of this Order to the
extent that it. is acting as an agent of the Department. This Order does not apply in
those cases where a water management district, local government, or other entity is
acting under its.own independent authority.
NOTICE OF RIGHTS
Pursuant to Section 120.569(2)(n), Florida Statutes, any party adversely affected
by this Order has the right to seek an injunction of this Order in circuit court or judicial
review of it under Section 120.68, Florida Statutes. Judicial review must be sought by
filing a notice of appeal under Rule 9.110 of the Florida Rules of Appellate Procedure.,
37
with the Clerk of the Department in the Office of General Counsel, 3900 Commonwealth
Boulevard., Mail Station #35, Tallahassee, Florida 32399-3000, and by filing a copy of
the notice of appeal, accompanied by the applicable filing fees, with the appropriate
district coui�,fof,:appeal. The notice of appeal must be fled within thirty (30) days after
this Order is filed with the Clerk of the Department.
DONE AND ORDERED on this 5th day of October, 2016, in Tallahassee,
Florida.
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
Jontaa P. Steverson, Secretary
3900 Commonwealth Boulevard
Tallahassee, Florida 32399-3000
FILED on tb' ate; pursuant to
§120 Florida tatutes., with the
d .s"gnated Depa ment Clerk, receipt
w ' is--here y acknowledged.
,R
DATE: