HomeMy WebLinkAboutBuilding permit app From_ fax5616880909 1.161.688.0909 Wed Nov 18 12:04:06 2020 MST Page 1 of 1
�•, St Lucie County Insp�ctions
2300 Virginia Avenue .
, �� Ft Pierce,FL 34982
� ' (722) 462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOLL TREATMENT
J
PF;Ri`T1T# JOB ADDRESS 3621 Grove Ct,Fort Pierce,FL 34951-29I0
BUILDER GHO Homes
'PEST CONTROL CONTRACTOR HolneTeam Pest Defense,Inc.
PEST CONTROL LICENSE it JF0001886
We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean termites iti
accordance with the standards of the National Pest Control Association.
Square feet ol'area treated: 220 Chemicals used: Sentricon Always Active HDbait system
Percentage of solution: .50% Total gallons used:
Date of treatment: 11/11/20 Time of treatment: AM
FBC104.2.6 Certificate uf,Protective Treatment for prevention of rerxtites.
A weatlier resistaia jobsite posting board shall he provided to receive
Z Footing duplicate Treatment Certificates as each required protective treatment is
19 1st Treatment completed,providing ti copvfor•the person the poermit Cs iiwed to and
another copy for the huildsng pen-nil files. The.Treatrrrertt Certf cote.shai!
G Re-treat provide the r oduct used,identi e the applicator tine and date o the
p P" �; .l�� I F .f
❑ Slab treatnrent,site location,area treated,chemical used,percent concentration
and mtartber of oallans used. to establish a verifiable record oj'protective
❑ 1 st Treatlmen.t treatinent. If fhe soil chentictil barrier method fa•terntfte.pr-evention is used.
❑.Re-treat final exterior treannerrt shall be completed prior to final building approval.
D Driveway St Liteie County requires for the final inspection for CO,a Permanent
❑ 1 st Treatment Sticker to be placed on the electrical panel.box cover,listing all the
❑Re-treat treatments and dates of applications.
❑Pools-
C 1st Treatment -
❑Re-treat Signature of exterminator
❑Other
0 1 st Treatment
❑Re-treat
®Perimeter for Final Inspection
tVOTE.There must be a completed form for each required treatment or re-treatment curd this form must be on the job site to be
.picked tip l y the inspector at time oj,each inspection:or the scheduled inspection will fail and a re-inspection fee charger!.