COMcheck Software Version 4.1.2.1
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Construction Site:
INDRIO RD & KING HWY
FORT PIERCE, FL
2017 Florida Building Code, Energy Conservation
21910262 7 ELEVEN
Fort Pierce, Florida
2a
New Construction
Owner/Agent:
CREIGHTON COMMERCIAL
DEVELOPMENT
900 SW PINE ISLAND ROAD, SUITE
202
CAPE CORAL, FL 33991
239-210-0455
mross@creightondev.com
Designer/Contractor:
CUHACI & PETERSON
1925 Prospect Avenue
Orlando, FL 32814
407-661-9100
Additional Efficiency Package(s)
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Mechanical Systems List
Quantity System Type & Description
RTU'S - 1 & 2 (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 125 kBtu/h
Proposed Efficiency = 82.00% AFUE, Required Efficiency: 80.00 % AFUE (or 80% Et)
Cooling: 1 each - Single Package DX Unit, Capacity = 93 kBtu/h, Air -Cooled Condenser, Air Economizer
Proposed Efficiency = 12.00 EER, Required Efficiency: 11.00 EER + 12.6 IEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 3000 CFM, 2.4 motor nameplate hp, 0.8 fan efficiency grade
Water Heater 1:
Electric Storage Water Heater, Capacity: 47 gallons w/ Circulation Pump
Proposed Efficiency: 0.87 EF, Required Efficiency: 0.87 EF
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2017 Florida Building Code, Energy Conservation requirements in COMcheck Version 4.1.2.1 and to comply
with any applicable mandatory requirements listed in the Inspection Checklist.
Cuhaci & Peterson Architects
Name - Title Signature
Digitally signed by Jose J Diaz -Velazquez
Reason: This document has been digitally signed
and sealed by Jose J. Diaz -Velazquez on the
date adjacent to the seal. Printed copies of this
document are not considered signed and sealed
and the signature must be verified on any
electronic copies.
Date: 2020.06.08 13:26:46-04'00'
474
Q STATE OF
'ice OR10ZONAL
P.•'
06/08/2020
Date
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 1 of 11
FL Energy Compliance.cck
COMcheck Software Version 4.1.2.1
Inspection Checklist
Energy Code: 2017 Florida Building Code, Energy Conservation
Requirements: 97.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
#
Plan Review
Complies?
Comments/Assumptions
& Req.ID,
C103.2
; Plans, specifications, and/or
;❑Complies ;Requirement will be met.
[PR2]1
,calculations provide all information
:❑Does Not
;with which compliance can be
; ❑Not Observable
determined for the mechanical
;systems and equipment and
;❑Not Applicable
;document where exceptions to the
standard are claimed. Load
calculations per acceptable
;engineering standards and
;handbooks.
C103.2
Plans, specifications, and/or
;❑Complies ;Requirement will be met.
[PR3]1
calculations provide all information
;❑Does Not
with which compliance can be
UNot Observable
determined for the service water
Applicable
heating systems and equipment and
;❑Not
document where exceptions to the
;standard
are claimed. Hot water
,system sized per manufacturer's
sizing guide.
C405.6 ;,Plans,
specifications, and/or
;❑Complies ; Requirement will be met.
[PR17]1
calculations provide all information
:[:]Does Not
:with
which compliance can be
Observable
determined for the electrical systems ;❑Not
;❑Not
Applicable
and equipment and document where
exceptions are claimed. Provisions are
made for metering individual tenant
units. Feeder connectors (for feeder
and branch circuits) sized in
;accordance with approved plans with
maximum drop of 5% voltage drop
;total.
C406 ;
Plans, specifications, and/or
;❑Complies ; Requirement will be met.
[PR9]1
calculations provide all information
;❑Does Not
;with
which compliance can be
Observable
determined for the additional energy
;❑Not
Applicable ;
I
efficiency package options. ;❑Not
Additional Comments/Assumptions:
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 2 of 11
FL Energy Compliance.cck
Section.
#
& Req.ID
Footing / Foundation Inspection
Complies?.
Comments/Assumptions
C402.2.6
Radiant heating systems panels
;IF -]Complies :Requirement will be met.
(FO12]3
j'linsulated to >=R-3.5 on face opposite
;❑Does Not
(space being heated.
III
;see the Envelope Assemblies table for values.
'❑Not Observable
❑Not Applicable
C403.2.4.'
Snow/ice melting system sensors for
;❑Complies ;Exception: Requirement does not apply.
5,
future connection to controls. Freeze
❑Does Not
C403.2.4.
protection systems have automatic
ONot Observable;
6
(FO9]3
controls installed.
±
}f
UNot Applicable
1 1
1 1
I
Additional Comments/Assumptions:
11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 3 of 11
FL Energy Compliance.cck
section
#
Plumbing Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
C404.5,
Heated water supply piping conforms
;❑Complies :Exception: Requirement does not apply.
C404.5.1,
Ito pipe length and volume
;❑Does Not
C404.5.2 .
] requirements. Refer to section details.
;❑Not Observable
[PL6]3
}
❑Not Applicable
C404.5,
1'1 Heated water supply piping conforms
;❑Complies ; Requirement will be met.
:❑Does
C404.5.1,
(to pipe length and volume
Not
C404.5.2
requirements. Refer to section details.
;❑Not Observable ;
[Pl.
❑Not Applicable
C404.6.1,
;Automatic time switches installed to
I❑Complies Requirement will be met.
C404.6.2
; automatically switch off the
;❑Does Not
[PL3]1
recirculating hot-water system or heat
,
:❑Not Observable
;trace.
;❑Not Applicable
C404.6.3
±Pumps that circulate water between a
;❑Complies Exception: Requirement does not apply.
[PL7]3
heater and storage tank have controls
:❑Does Not
Ithat limit operation from startup to
<= 5 minutes after end of heating
�❑Not Observable ;
I cycle.
;❑Not Applicable
C404.6.3
, Pumps that circulate water between a ;❑Complies Exception: Requirement does not apply.
[PL7]3
1 heater and storage tank have controls
:❑Does Not
that limit operation from startup to
I❑Not Observable
`<= 5 minutes after end of heating
;
❑Not Applicable
(cycle.
;
C404.7
i Water distribution system that pumps ;❑Complies ; Exception: Requirement does not apply.
[PL8]3
I water from a heated -water supply
ElDoes Not
pipe back to the heated -water source
!through
Observable
a cold -water supply pipe is a
demand recirculation water system.
;❑Not
;❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
;
entering the cold -water piping to
104°F.
C404.7
Water distribution system that pumps ;❑Complies :Requirement will be met.
[PL8]3
water from a heated -water supply
:❑Does Not
pipe back to the heated -water source
Observable
;through a cold -water supply pipe is a
demand recirculation water system.
;❑Not
;❑Not Applicable
I Pumps within this system have
controls that start the pump upon
;
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
:entering the cold -water piping to
i 104°F.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierc( Page 4 of 11
FL Energy Compliance.cck
Section
#,
-Mechanical Rough -In Inspection
Complies?
Comments/Assumptions ;
& Req.ID
C402.2.6 sThermally
ineffective panel surfaces of;❑Complies
;Requirement will be met.
[ME41]3
sensible heating panels have
;❑Does. Not
insulation >= R-3.5.
;❑Not Observable:
j
;❑Not Applicable
C403.2.9.
HVAC ducts and plenums insulated
;❑Complies :Requirement will be met.
1.1
and sealed according to Florida
UDoes Not
[ME60]3
Section C403.2.9, Table C403.2.9.1.
;❑Not Observable:
❑Not Applicable
C403.2.9.
All ducts, air handlers, filter boxes,
;❑Complies ;Requirement will be met.
2 ' ,
building cavities, mechanical closets
E❑Does Not
[ME79]2
and enclosed support platforms that
;❑Not Observable
form the primary air containment
; ,
Applicable
i passageways for air distribution
;❑Not
systems are constructed and erected
in accordance with Table C403.2.9.2
;
and with Chapter 6 of the Florida
Building Code, Mechanical. Ducts are
be constructed, braced, reinforced
;
and installed to provide structural
strength and durability. All transverse
joints, longitudinal seams and fitting
connections are securely fastened in
accordance with the applicable
standards of this section.
;
C403.2.9.
Duct insulation is protected from
;❑Complies ;Requirement will be met.
1.2
damage but not limited to the
:❑Does Not
[ME80]2.
following: 1. Insulation exposed to
❑Not Observable,'
weather is suitable for outdoor
Applicable
service. Cellular foam insulation is
;❑Not
protected or painted with a coating
that is water retardant and provides
shielding from solar radiation. 2.
Insulation covering cooling ducts
located outside the conditioned space
is vapor retardant located outside the
insulation, all penetrations and joints
of which shall be sealed.
;
C403.2.9.
f Additional insulation with vapor
;❑Complies ; Requirement will be met.
1.3
barrier is provided where the
;❑Does Not
[ME81]2
minimum duct insulation requirements;
ENot Observable
of Section C403.2.9.1.1 are
determined to be insufficient to
;❑Not Applicable
prevent condensation.
,
C403.2.13
Unenclosed spaces that are heated
;❑Complies ; Exception: Requirement does not apply.
[ME71]2
use only radiant heat.
;❑Does Not
❑Not Observable:
❑Not Applicable
C403.2.3
HVAC equipment efficiency verified.
;❑Complies ;see the mechanical systems list for values.
[ME55]2
;❑Does Not
I❑Not Observable
i
;❑Not Applicable
C403.2.9.
Ducts, air handlers, filter boxes,
;❑Complies ; Requirement will be met.
3
building cavities, mechanical closets
:❑Does Not
[ME10]2
and enclosed support platforms that
:❑Not Observable
form the primary air containment
Applicable
passageways for air distribution
;❑Not
systems are sealed in accordance with
the applicable criteria of this section
;
I and Table C403.2.9.2.
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierc( Page 5 of 11
FL Energy Compliance.cck
Section
#
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
C403.2.9.
Cavities in framed spaces are not
;❑Complies ; Requirement will be met.
4
used to deliver air from or return air to
;❑Does Not
[ME78]2
the conditioning system unless they
; UNot Observable
contain an air duct insert which is
Applicable
insulated in accordance with Section
;❑Not
C403.2.9.1 and constructed and
sealed in accordance with the
requirements of Section C403.2.9.2
appropriate for the duct materials
used.
'
C403.2.9.
IAir distribution systems are sized and ;❑Complies ;Requirement will be met.
5
designed in accordance with
;❑Does Not
[ME76]2
recognized engineering standards.
:❑Not Observable
J
{ Refer to section details.
:❑Not Applicable
C403.2.9.
units not installed in
;❑Complies ; Exception: Requirement does not apply.
6
JAir-handling
attics of commercial buildings.
;❑Does Not
[ME77]2
; ❑Not Observable:
;❑Not Applicable
C403.2A.
Fault detection and diagnostics
;❑Complies
7
installed with air-cooled unitary DX
;❑Does Not
[ME113]2
units having economizers.
i
;❑Not Observable
❑Not Applicable
C408.2.2.
!Air system balancing accomplished in
;❑Complies ;Requirement will be met.
1
a manner to first minimize throttling
Z❑Does Not
[ME53]3
losses, then for fans with fan system ;
Observable
power greater than 1 hp, fan speeds
;shall
;❑Not
Applicable
be adjusted to meet design flow
;❑Not ;
conditions. Balancing procedures shall
be in accordance with NEBB
Procedural Standards, the AABC,
I
National Standards, or equivalent
1 procedures.
C403.2.6.
Demand control ventilation provided
;❑Complies :Requirement will be met.
1
;for spaces >500 ft2 and >25
;❑Does Not
[ME59]1
; people/1000 ft2 occupant density and
; ❑Not Observable
served by systems with air side
economizer, auto modulating outside
I
:❑Not Applicable
:air damper control, or design airflow
>3,000 cfm.
C403.2.6.
Enclosed parking garage ventilation
;❑Complies ;Exception: Requirement does not apply.
2
!has automatic contaminant detection
;❑Does Not
[ME115]3
1 and capacity to stage or modulate
fans to 50% or less of design capacity. ;❑Not
Observable;
i
;❑Not Applicable
C403.2.7
,Exhaust air energy recovery on ;❑Complies
; Exception: Requirement does not apply.
[ME57]1
;systems meeting Table C403.2.7(1)
ElDoes Not
;and C403.2.7(2).
I❑Not
Observable;
❑Not Applicable
C403.2.8
!Kitchen exhaust systems comply with
;❑Complies ;,Exception: Requirement does not apply.
[ME116]3
replacement air and conditioned
ElDoes Not
supply air limitations, and satisfy hood
Observable
rating requirements and maximum
�❑Not
Applicable
exhaust rate criteria.❑Not
C403.3
;Air economizers provided where
;❑Complies
[ME62]1
:required, meet the requirements for T❑Does
Not
:design capacity, control signal,
;ventilation controls, high -limit shut-off,;
❑Not Observable
:integrated economizer control, and
;❑Not Applicable
provide a means to relieve excess
,outside air during operation.
;
111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 6 of 11
FL Energy Compliance.cck
Section
#
Mechanical Rough -In Inspection
Complies?
Comments/Assumptions
& Req.ID
C403.4.4.
(Multiple zone VAV systems with DDC
;❑Complies ; Exception: Requirement does not apply.
6
of individual zone boxes have static
;❑Does Not
[ME110]3
j pressure setpoint reset controls.
See the Mechanical Systems list for values.
;❑Not Observable
f
;❑Not Applicable
C408.2.2.
JAir outlets and zone terminal devices
;❑Complies ;Requirement will be met.
1
R have means for air balancing.
;❑Does Not
[ME53]3
;❑Not Observable:
❑Not Applicable
C403.5,
Refrigerated display cases, walk-in
;❑Complies ;Requirement will be met.
C403.5.1,
coolers or walk-in freezers served by
:❑Does Not
C403.5.2
'remote compressors and remote
❑Not Observable:
[ME123]3
condensers not located in a
Applicable
pp
condensing unit, have fan -powered
I condensers that comply with Sections
C403.5.1 and refrigeration compressor;
jsystems that comply with C403.5.2..
C403.5.3
j Condensing coils installed in cool air
;❑Complies ; Requirement will be met.
[ME124]3
i stream of another air-conditioning
j❑Does Not
unit. The condensing coil of one air-
conditioning unit shall not be installed
;❑Not Observable ,
{fff
I
in the cool air stream of another air-
:[]Not Applicable
i
conditioning unit.
Additional Comments/Assumptions:
1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierc( Page 7 of 11
FL Energy Compliance.cck
Section
#
Final Inspection; ,
Complies?;
Comments/Assumptions
& .Req:ID
C303.3,
Furnished O&M manuals for HVAC ;❑Complies :Requirement will be met.
C408.2.5.
systems within 90 days of system ;❑Does Not
3
[FIB]3
acceptance. Not Observable
;❑Not Applicable
i
C403.2.4..
Minimum one humidity control device ;❑Complies ; Requirement will be met.
2.4
per installed ;❑Does Not
[FI56]3
humidification/dehumidification
:❑Not Observable;
system. Controls prevent
:❑Not Applicable ;
simultaneous operation of
1
humidification and dehumidification
4 equipment.
C4012.1
HVAC systems and equipment design ;❑Complies :Requirement will be met.
dloads
[F150]3•
calculated in accordance with :❑Does Not
ANSI/ASHRAE/ACCA Standard 183 or
Observable ;
ACCA Manual N or by an approved :❑Not
equivalent computational procedure. ❑Not Applicable ;
i Design loads shall be attached to the
j
code compliance form submitted to
the building department when the
building is permitted or, in the event ;
the mechanical permit is obtained at a
later time, the sizing calculation shall
1
be submitted with the application for
;the mechanical permit.
C403.2.2 ..
HVAC systems and equipment ;❑Complies ; Requirement will be met.
[FI27]3
capacity does not exceed calculated :❑Does Not
loads.
❑Not Observable
❑Not Applicable
C4.03.2.4.
Heating and cooling to each zone is ;❑Complies ; Requirement will be met.
1,
i controlled by a thermostat control. :❑Does Not
[FI47]3
Minimum one humidity control device ;
Observable ;
fi
per installed ,❑Not
humidification/dehumidification ;❑Not Applicable
system.
C403:2.4. 'Thermostatic
controls have a 5 °F ;❑Complies ; Requirement will be met.
1.2
deadband. j❑Does Not
[FI38]3 -
; ❑Not Observable:
❑Not Applicable
C403:2.4.,,
Temperature controls have setpoint ;❑Complies ; Requirement will be met.
1.3
overlap restrictions. :❑Does Not
[FI20]3,
i UNot Observable:
j❑Not Applicable
C403.2.4..
Each zone equipped with setback ;❑Complies ;Requirement will be met.
2
I controls using automatic time clock or ❑Does Not
[FI39]3
i programmable control system. ;❑Not Observable
❑Not Applicable
C404:12.21
Public lavatory facilities equipped with ;❑Complies ; Requirement will be met.
[FI53]3
outlet devices which limit the flow of ❑Does Not
I hot water to a maximum of 0.5 gpm or
are equipped with self -closing valves❑Not Observable I
that limit delivery to a per cycle ;❑Not Applicable
maximum of 0.25 gallons of hot water j
Ifor recirculating systems and to a
maximum of 0.50 gallons for non -
recirculating systems.
111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierc< Page 8 of it
FL Energy Compliance.cck
& Req.ID I
Final Inspection I, Complies?
C404.12.2 Public lavatory water temperature
[FI57]3 <=110°F.
C404.12:1 Showers used for non -safety reasons
[FI52]3 equipped with flow control devices to
Comments/Assumptions
LJComplies :Requirement will be met.
Does Not
❑Not Observable
❑Not Applicable
❑Complies :Exception: Requirement does not apply.
Does Not
limit the water discharge to a
maximum of 2.5 gpm per shower :❑Not Observable
head. Flow restricting inserts used as ;❑Not Applicable
a component part of a showerhead
are mechanically retained at the point
of manufacture
C408.2.2
; Construction documents require that a ;LJComplies ; Requirement will be met.
[FI54]3
written balance report be provided to UDoes Not
the building owner or rep for HVAC
UNot Observable
systems serving zones with total
;❑Not Applicable
condition area > 5,000 sqft. Air ;
i distribution systems shall be tested,
+adjusted, and balanced by a licensed
engineer or certified company.
C403.2.4.
2.1,
C403.2.4.
2.2
[F140]3
C403.2.4.
2.3
[F[41]3
[FI11]3
Automatic Controls: Setback to 55°F
(heat) and 85°F (cool); 7-day clock, 2-
hour occupant override, 10-hour
backup
Systems include optimum start
controls.
Heat traps installed on supply and
discharge piping of non -circulating
systems.
;LJComplies ;Requirement will be met.
Does Not
ENot Observable
❑Not Applicable
;
LJComplies Requirement will be met.
❑Does Not
❑Not Observable
❑Not Applicable
❑Complies ;Requirement will be.met.
❑Does Not
❑Not Observable
❑Not Applicable
C404.4 All piping insulated in accordance with ;LJComplies Requirement will be met.
[FI25]2 section details and Table C403.2.10. :❑Does Not
❑Not Observable
❑Not Applicable
C404.6.1 j Controls are installed that limit the
[FI1213 operation of a recirculation pump
installed to maintain temperature of a
storage tank. System return pipe is a
dedicated return pipe or a cold water
supply pipe.
C408.2.1 :Commissioning plan developed by
[FI28]1 :registered design professional or
approved agency.
C408.2.3. : HVAC equipment has been tested to
1 :ensure proper operation.
[FI31]1
C408.2.3. ; HVAC control systems have been
2 ;tested to ensure proper operation,
[FI10]1 ; calibration and adjustment of controls
LJComplies :Requirement will be met.
Does Not
;
❑Not Observable
❑Not Applicable
;
;LJComplies ; Requirement will be met.
lDoes Not
❑Not Observable
❑Not Applicable
❑Complies :Requirement will be met.
Does Not
;
❑Not Observable
❑Not Applicable
❑Complies :Requirement will be met.
Does Not
;
❑Not Observable
❑Not Applicable
11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 9 of 11
FL Energy Compliance.cck
Section
#
Final Inspection
Complies?
Comments/Assumptions
& Req.I D
C408.2.3.
; Economizers have been tested to
;❑Complies
3
ensure proper operation.
❑Does Not
[FI32]1
;❑Not Observable
❑Not Applicable
C408.2.4
Preliminary commissioning report
;❑Complies ; Requirement will be met.
[FI29]1
completed and certified by registered
ElDoes Not
;design professional or approved
UNot Observable
;agency.
❑Not Applicable ;
C408.2.5. Furnished HVAC as -built drawings
;❑Complies :Requirement will be met.
1 ' '
submitted within 90 days of system
:❑Does Not
[FI7]3
?acceptance.
;❑Not Observable
❑Not Applicable
C408.2.5.
;An air and/or hydronic system
;❑Complies Requirement will be met.
3
; balancing report is provided for HVAC
:❑Does Not
[FI43]1
;systems.
;❑Not Observable
❑Not Applicable
C408.2.5.
; Final commissioning report due to
;❑Complies ; Requirement will be met.
4
building owner within 90 days of
UDoes Not
[F130]1
; receipt of certificate of occupancy.
❑Not Observable:
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2' 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3)
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 10 of 11
FL Energy Compliance.cck
Project Title: 21910262 7 ELEVEN Report date: 06/08/20
Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Piercf Page 11 of 11
FL Energy Compliance.cck