Loading...
HomeMy WebLinkAboutMechanical Compliance Certificaten�( COMcheck Software Version 4.1.2.1 Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: INDRIO RD & KING HWY FORT PIERCE, FL 2017 Florida Building Code, Energy Conservation 21910262 7 ELEVEN Fort Pierce, Florida 2a New Construction Owner/Agent: CREIGHTON COMMERCIAL DEVELOPMENT 900 SW PINE ISLAND ROAD, SUITE 202 CAPE CORAL, FL 33991 239-210-0455 mross@creightondev.com Designer/Contractor: CUHACI & PETERSON 1925 Prospect Avenue Orlando, FL 32814 407-661-9100 Additional Efficiency Package(s) Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Mechanical Systems List Quantity System Type & Description RTU'S - 1 & 2 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 125 kBtu/h Proposed Efficiency = 82.00% AFUE, Required Efficiency: 80.00 % AFUE (or 80% Et) Cooling: 1 each - Single Package DX Unit, Capacity = 93 kBtu/h, Air -Cooled Condenser, Air Economizer Proposed Efficiency = 12.00 EER, Required Efficiency: 11.00 EER + 12.6 IEER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 3000 CFM, 2.4 motor nameplate hp, 0.8 fan efficiency grade Water Heater 1: Electric Storage Water Heater, Capacity: 47 gallons w/ Circulation Pump Proposed Efficiency: 0.87 EF, Required Efficiency: 0.87 EF Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2017 Florida Building Code, Energy Conservation requirements in COMcheck Version 4.1.2.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Cuhaci & Peterson Architects Name - Title Signature Digitally signed by Jose J Diaz -Velazquez Reason: This document has been digitally signed and sealed by Jose J. Diaz -Velazquez on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. Date: 2020.06.08 13:26:46-04'00' 474 Q STATE OF 'ice OR10ZONAL P.•' 06/08/2020 Date Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 1 of 11 FL Energy Compliance.cck COMcheck Software Version 4.1.2.1 Inspection Checklist Energy Code: 2017 Florida Building Code, Energy Conservation Requirements: 97.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID, C103.2 ; Plans, specifications, and/or ;❑Complies ;Requirement will be met. [PR2]1 ,calculations provide all information :❑Does Not ;with which compliance can be ; ❑Not Observable determined for the mechanical ;systems and equipment and ;❑Not Applicable ;document where exceptions to the standard are claimed. Load calculations per acceptable ;engineering standards and ;handbooks. C103.2 Plans, specifications, and/or ;❑Complies ;Requirement will be met. [PR3]1 calculations provide all information ;❑Does Not with which compliance can be UNot Observable determined for the service water Applicable heating systems and equipment and ;❑Not document where exceptions to the ;standard are claimed. Hot water ,system sized per manufacturer's sizing guide. C405.6 ;,Plans, specifications, and/or ;❑Complies ; Requirement will be met. [PR17]1 calculations provide all information :[:]Does Not :with which compliance can be Observable determined for the electrical systems ;❑Not ;❑Not Applicable and equipment and document where exceptions are claimed. Provisions are made for metering individual tenant units. Feeder connectors (for feeder and branch circuits) sized in ;accordance with approved plans with maximum drop of 5% voltage drop ;total. C406 ; Plans, specifications, and/or ;❑Complies ; Requirement will be met. [PR9]1 calculations provide all information ;❑Does Not ;with which compliance can be Observable determined for the additional energy ;❑Not Applicable ; I efficiency package options. ;❑Not Additional Comments/Assumptions: 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 2 of 11 FL Energy Compliance.cck Section. # & Req.ID Footing / Foundation Inspection Complies?. Comments/Assumptions C402.2.6 Radiant heating systems panels ;IF -]Complies :Requirement will be met. (FO12]3 j'linsulated to >=R-3.5 on face opposite ;❑Does Not (space being heated. III ;see the Envelope Assemblies table for values. '❑Not Observable ❑Not Applicable C403.2.4.' Snow/ice melting system sensors for ;❑Complies ;Exception: Requirement does not apply. 5, future connection to controls. Freeze ❑Does Not C403.2.4. protection systems have automatic ONot Observable; 6 (FO9]3 controls installed. ± }f UNot Applicable 1 1 1 1 I Additional Comments/Assumptions: 11 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 3 of 11 FL Energy Compliance.cck section # Plumbing Rough -In Inspection Complies? Comments/Assumptions & Req.ID C404.5, Heated water supply piping conforms ;❑Complies :Exception: Requirement does not apply. C404.5.1, Ito pipe length and volume ;❑Does Not C404.5.2 . ] requirements. Refer to section details. ;❑Not Observable [PL6]3 } ❑Not Applicable C404.5, 1'1 Heated water supply piping conforms ;❑Complies ; Requirement will be met. :❑Does C404.5.1, (to pipe length and volume Not C404.5.2 requirements. Refer to section details. ;❑Not Observable ; [Pl. ❑Not Applicable C404.6.1, ;Automatic time switches installed to I❑Complies Requirement will be met. C404.6.2 ; automatically switch off the ;❑Does Not [PL3]1 recirculating hot-water system or heat , :❑Not Observable ;trace. ;❑Not Applicable C404.6.3 ±Pumps that circulate water between a ;❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls :❑Does Not Ithat limit operation from startup to <= 5 minutes after end of heating �❑Not Observable ; I cycle. ;❑Not Applicable C404.6.3 , Pumps that circulate water between a ;❑Complies Exception: Requirement does not apply. [PL7]3 1 heater and storage tank have controls :❑Does Not that limit operation from startup to I❑Not Observable `<= 5 minutes after end of heating ; ❑Not Applicable (cycle. ; C404.7 i Water distribution system that pumps ;❑Complies ; Exception: Requirement does not apply. [PL8]3 I water from a heated -water supply ElDoes Not pipe back to the heated -water source !through Observable a cold -water supply pipe is a demand recirculation water system. ;❑Not ;❑Not Applicable Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water ; entering the cold -water piping to 104°F. C404.7 Water distribution system that pumps ;❑Complies :Requirement will be met. [PL8]3 water from a heated -water supply :❑Does Not pipe back to the heated -water source Observable ;through a cold -water supply pipe is a demand recirculation water system. ;❑Not ;❑Not Applicable I Pumps within this system have controls that start the pump upon ; receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water :entering the cold -water piping to i 104°F. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierc( Page 4 of 11 FL Energy Compliance.cck Section #, -Mechanical Rough -In Inspection Complies? Comments/Assumptions ; & Req.ID C402.2.6 sThermally ineffective panel surfaces of;❑Complies ;Requirement will be met. [ME41]3 sensible heating panels have ;❑Does. Not insulation >= R-3.5. ;❑Not Observable: j ;❑Not Applicable C403.2.9. HVAC ducts and plenums insulated ;❑Complies :Requirement will be met. 1.1 and sealed according to Florida UDoes Not [ME60]3 Section C403.2.9, Table C403.2.9.1. ;❑Not Observable: ❑Not Applicable C403.2.9. All ducts, air handlers, filter boxes, ;❑Complies ;Requirement will be met. 2 ' , building cavities, mechanical closets E❑Does Not [ME79]2 and enclosed support platforms that ;❑Not Observable form the primary air containment ; , Applicable i passageways for air distribution ;❑Not systems are constructed and erected in accordance with Table C403.2.9.2 ; and with Chapter 6 of the Florida Building Code, Mechanical. Ducts are be constructed, braced, reinforced ; and installed to provide structural strength and durability. All transverse joints, longitudinal seams and fitting connections are securely fastened in accordance with the applicable standards of this section. ; C403.2.9. Duct insulation is protected from ;❑Complies ;Requirement will be met. 1.2 damage but not limited to the :❑Does Not [ME80]2. following: 1. Insulation exposed to ❑Not Observable,' weather is suitable for outdoor Applicable service. Cellular foam insulation is ;❑Not protected or painted with a coating that is water retardant and provides shielding from solar radiation. 2. Insulation covering cooling ducts located outside the conditioned space is vapor retardant located outside the insulation, all penetrations and joints of which shall be sealed. ; C403.2.9. f Additional insulation with vapor ;❑Complies ; Requirement will be met. 1.3 barrier is provided where the ;❑Does Not [ME81]2 minimum duct insulation requirements; ENot Observable of Section C403.2.9.1.1 are determined to be insufficient to ;❑Not Applicable prevent condensation. , C403.2.13 Unenclosed spaces that are heated ;❑Complies ; Exception: Requirement does not apply. [ME71]2 use only radiant heat. ;❑Does Not ❑Not Observable: ❑Not Applicable C403.2.3 HVAC equipment efficiency verified. ;❑Complies ;see the mechanical systems list for values. [ME55]2 ;❑Does Not I❑Not Observable i ;❑Not Applicable C403.2.9. Ducts, air handlers, filter boxes, ;❑Complies ; Requirement will be met. 3 building cavities, mechanical closets :❑Does Not [ME10]2 and enclosed support platforms that :❑Not Observable form the primary air containment Applicable passageways for air distribution ;❑Not systems are sealed in accordance with the applicable criteria of this section ; I and Table C403.2.9.2. 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierc( Page 5 of 11 FL Energy Compliance.cck Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.2.9. Cavities in framed spaces are not ;❑Complies ; Requirement will be met. 4 used to deliver air from or return air to ;❑Does Not [ME78]2 the conditioning system unless they ; UNot Observable contain an air duct insert which is Applicable insulated in accordance with Section ;❑Not C403.2.9.1 and constructed and sealed in accordance with the requirements of Section C403.2.9.2 appropriate for the duct materials used. ' C403.2.9. IAir distribution systems are sized and ;❑Complies ;Requirement will be met. 5 designed in accordance with ;❑Does Not [ME76]2 recognized engineering standards. :❑Not Observable J { Refer to section details. :❑Not Applicable C403.2.9. units not installed in ;❑Complies ; Exception: Requirement does not apply. 6 JAir-handling attics of commercial buildings. ;❑Does Not [ME77]2 ; ❑Not Observable: ;❑Not Applicable C403.2A. Fault detection and diagnostics ;❑Complies 7 installed with air-cooled unitary DX ;❑Does Not [ME113]2 units having economizers. i ;❑Not Observable ❑Not Applicable C408.2.2. !Air system balancing accomplished in ;❑Complies ;Requirement will be met. 1 a manner to first minimize throttling Z❑Does Not [ME53]3 losses, then for fans with fan system ; Observable power greater than 1 hp, fan speeds ;shall ;❑Not Applicable be adjusted to meet design flow ;❑Not ; conditions. Balancing procedures shall be in accordance with NEBB Procedural Standards, the AABC, I National Standards, or equivalent 1 procedures. C403.2.6. Demand control ventilation provided ;❑Complies :Requirement will be met. 1 ;for spaces >500 ft2 and >25 ;❑Does Not [ME59]1 ; people/1000 ft2 occupant density and ; ❑Not Observable served by systems with air side economizer, auto modulating outside I :❑Not Applicable :air damper control, or design airflow >3,000 cfm. C403.2.6. Enclosed parking garage ventilation ;❑Complies ;Exception: Requirement does not apply. 2 !has automatic contaminant detection ;❑Does Not [ME115]3 1 and capacity to stage or modulate fans to 50% or less of design capacity. ;❑Not Observable; i ;❑Not Applicable C403.2.7 ,Exhaust air energy recovery on ;❑Complies ; Exception: Requirement does not apply. [ME57]1 ;systems meeting Table C403.2.7(1) ElDoes Not ;and C403.2.7(2). I❑Not Observable; ❑Not Applicable C403.2.8 !Kitchen exhaust systems comply with ;❑Complies ;,Exception: Requirement does not apply. [ME116]3 replacement air and conditioned ElDoes Not supply air limitations, and satisfy hood Observable rating requirements and maximum �❑Not Applicable exhaust rate criteria.❑Not C403.3 ;Air economizers provided where ;❑Complies [ME62]1 :required, meet the requirements for T❑Does Not :design capacity, control signal, ;ventilation controls, high -limit shut-off,; ❑Not Observable :integrated economizer control, and ;❑Not Applicable provide a means to relieve excess ,outside air during operation. ; 111 High Impact (Tier 1) 12 1 Medium Impact (Tier 2) 13 1 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 6 of 11 FL Energy Compliance.cck Section # Mechanical Rough -In Inspection Complies? Comments/Assumptions & Req.ID C403.4.4. (Multiple zone VAV systems with DDC ;❑Complies ; Exception: Requirement does not apply. 6 of individual zone boxes have static ;❑Does Not [ME110]3 j pressure setpoint reset controls. See the Mechanical Systems list for values. ;❑Not Observable f ;❑Not Applicable C408.2.2. JAir outlets and zone terminal devices ;❑Complies ;Requirement will be met. 1 R have means for air balancing. ;❑Does Not [ME53]3 ;❑Not Observable: ❑Not Applicable C403.5, Refrigerated display cases, walk-in ;❑Complies ;Requirement will be met. C403.5.1, coolers or walk-in freezers served by :❑Does Not C403.5.2 'remote compressors and remote ❑Not Observable: [ME123]3 condensers not located in a Applicable pp condensing unit, have fan -powered I condensers that comply with Sections C403.5.1 and refrigeration compressor; jsystems that comply with C403.5.2.. C403.5.3 j Condensing coils installed in cool air ;❑Complies ; Requirement will be met. [ME124]3 i stream of another air-conditioning j❑Does Not unit. The condensing coil of one air- conditioning unit shall not be installed ;❑Not Observable , {fff I in the cool air stream of another air- :[]Not Applicable i conditioning unit. Additional Comments/Assumptions: 1 I High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierc( Page 7 of 11 FL Energy Compliance.cck Section # Final Inspection; , Complies?; Comments/Assumptions & .Req:ID C303.3, Furnished O&M manuals for HVAC ;❑Complies :Requirement will be met. C408.2.5. systems within 90 days of system ;❑Does Not 3 [FIB]3 acceptance. Not Observable ;❑Not Applicable i C403.2.4.. Minimum one humidity control device ;❑Complies ; Requirement will be met. 2.4 per installed ;❑Does Not [FI56]3 humidification/dehumidification :❑Not Observable; system. Controls prevent :❑Not Applicable ; simultaneous operation of 1 humidification and dehumidification 4 equipment. C4012.1 HVAC systems and equipment design ;❑Complies :Requirement will be met. dloads [F150]3• calculated in accordance with :❑Does Not ANSI/ASHRAE/ACCA Standard 183 or Observable ; ACCA Manual N or by an approved :❑Not equivalent computational procedure. ❑Not Applicable ; i Design loads shall be attached to the j code compliance form submitted to the building department when the building is permitted or, in the event ; the mechanical permit is obtained at a later time, the sizing calculation shall 1 be submitted with the application for ;the mechanical permit. C403.2.2 .. HVAC systems and equipment ;❑Complies ; Requirement will be met. [FI27]3 capacity does not exceed calculated :❑Does Not loads. ❑Not Observable ❑Not Applicable C4.03.2.4. Heating and cooling to each zone is ;❑Complies ; Requirement will be met. 1, i controlled by a thermostat control. :❑Does Not [FI47]3 Minimum one humidity control device ; Observable ; fi per installed ,❑Not humidification/dehumidification ;❑Not Applicable system. C403:2.4. 'Thermostatic controls have a 5 °F ;❑Complies ; Requirement will be met. 1.2 deadband. j❑Does Not [FI38]3 - ; ❑Not Observable: ❑Not Applicable C403:2.4.,, Temperature controls have setpoint ;❑Complies ; Requirement will be met. 1.3 overlap restrictions. :❑Does Not [FI20]3, i UNot Observable: j❑Not Applicable C403.2.4.. Each zone equipped with setback ;❑Complies ;Requirement will be met. 2 I controls using automatic time clock or ❑Does Not [FI39]3 i programmable control system. ;❑Not Observable ❑Not Applicable C404:12.21 Public lavatory facilities equipped with ;❑Complies ; Requirement will be met. [FI53]3 outlet devices which limit the flow of ❑Does Not I hot water to a maximum of 0.5 gpm or are equipped with self -closing valves❑Not Observable I that limit delivery to a per cycle ;❑Not Applicable maximum of 0.25 gallons of hot water j Ifor recirculating systems and to a maximum of 0.50 gallons for non - recirculating systems. 111 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierc< Page 8 of it FL Energy Compliance.cck & Req.ID I Final Inspection I, Complies? C404.12.2 Public lavatory water temperature [FI57]3 <=110°F. C404.12:1 Showers used for non -safety reasons [FI52]3 equipped with flow control devices to Comments/Assumptions LJComplies :Requirement will be met. Does Not ❑Not Observable ❑Not Applicable ❑Complies :Exception: Requirement does not apply. Does Not limit the water discharge to a maximum of 2.5 gpm per shower :❑Not Observable head. Flow restricting inserts used as ;❑Not Applicable a component part of a showerhead are mechanically retained at the point of manufacture C408.2.2 ; Construction documents require that a ;LJComplies ; Requirement will be met. [FI54]3 written balance report be provided to UDoes Not the building owner or rep for HVAC UNot Observable systems serving zones with total ;❑Not Applicable condition area > 5,000 sqft. Air ; i distribution systems shall be tested, +adjusted, and balanced by a licensed engineer or certified company. C403.2.4. 2.1, C403.2.4. 2.2 [F140]3 C403.2.4. 2.3 [F[41]3 [FI11]3 Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2- hour occupant override, 10-hour backup Systems include optimum start controls. Heat traps installed on supply and discharge piping of non -circulating systems. ;LJComplies ;Requirement will be met. Does Not ENot Observable ❑Not Applicable ; LJComplies Requirement will be met. ❑Does Not ❑Not Observable ❑Not Applicable ❑Complies ;Requirement will be.met. ❑Does Not ❑Not Observable ❑Not Applicable C404.4 All piping insulated in accordance with ;LJComplies Requirement will be met. [FI25]2 section details and Table C403.2.10. :❑Does Not ❑Not Observable ❑Not Applicable C404.6.1 j Controls are installed that limit the [FI1213 operation of a recirculation pump installed to maintain temperature of a storage tank. System return pipe is a dedicated return pipe or a cold water supply pipe. C408.2.1 :Commissioning plan developed by [FI28]1 :registered design professional or approved agency. C408.2.3. : HVAC equipment has been tested to 1 :ensure proper operation. [FI31]1 C408.2.3. ; HVAC control systems have been 2 ;tested to ensure proper operation, [FI10]1 ; calibration and adjustment of controls LJComplies :Requirement will be met. Does Not ; ❑Not Observable ❑Not Applicable ; ;LJComplies ; Requirement will be met. lDoes Not ❑Not Observable ❑Not Applicable ❑Complies :Requirement will be met. Does Not ; ❑Not Observable ❑Not Applicable ❑Complies :Requirement will be met. Does Not ; ❑Not Observable ❑Not Applicable 11 High Impact (Tier 1) 2 1 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 9 of 11 FL Energy Compliance.cck Section # Final Inspection Complies? Comments/Assumptions & Req.I D C408.2.3. ; Economizers have been tested to ;❑Complies 3 ensure proper operation. ❑Does Not [FI32]1 ;❑Not Observable ❑Not Applicable C408.2.4 Preliminary commissioning report ;❑Complies ; Requirement will be met. [FI29]1 completed and certified by registered ElDoes Not ;design professional or approved UNot Observable ;agency. ❑Not Applicable ; C408.2.5. Furnished HVAC as -built drawings ;❑Complies :Requirement will be met. 1 ' ' submitted within 90 days of system :❑Does Not [FI7]3 ?acceptance. ;❑Not Observable ❑Not Applicable C408.2.5. ;An air and/or hydronic system ;❑Complies Requirement will be met. 3 ; balancing report is provided for HVAC :❑Does Not [FI43]1 ;systems. ;❑Not Observable ❑Not Applicable C408.2.5. ; Final commissioning report due to ;❑Complies ; Requirement will be met. 4 building owner within 90 days of UDoes Not [F130]1 ; receipt of certificate of occupancy. ❑Not Observable: ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 2' 1 Medium Impact (Tier 2) 3 1 Low Impact (Tier 3) Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Pierce Page 10 of 11 FL Energy Compliance.cck Project Title: 21910262 7 ELEVEN Report date: 06/08/20 Data filename: W:\2019\2190262\Deliverables\Plot files\2020-03-05_Permit Set\Comcheck\2190262 Fort Piercf Page 11 of 11 FL Energy Compliance.cck