Loading...
HomeMy WebLinkAboutNarrative for Peer Review--4vl 1925 Prospect Ave. Orlando, FL 32814 P (407) 661-9100 CGrGtGtC% & feferrvl� F (407) 661-9101 WWW.C-A. r,0M Architects Engineers Planners Narrative for Peer review— Revision #2 June 08, 2020 7-Eleven — Fort Pierce, FL Indrio Rd. & Kings HWY Fort Pierce, FI 34952 CP: 2190262 The followine are revisions that we made in accordance with Deer review comments: MAIN BUILDING: 1. Sheet A0.1 Code Compliance Information Sheet: • Updated the sheet index • Updated the Sales SF • Updated Backroom SF • Added new sheet 2. Sheet A1.3 Architectural Site Plan • Add POS at carwash • Propane tanks not shown on EF sheets • Updated bollard locations • Revised accessible route • Revised site dimensions • Revised keynote tags • Update Building Layout • Update Keynote Schedule • Relocated detail 2/A1.3 • Removed Keynote 15 3. Sheet ALL Architectural Site Plan Details • Added new sheet 4. Sheet A1.4 Dumpster Enclosure & Details • Add finishes to dumpster elevation • Revise front dumpster enclosure elevation • Revise text scale • Revise gate bollard detail • Revise dumpster enclosure wall section • Dumpster enclosure plan meets CMU coursing, as it is built with CMU, Proto doesn't demonstrate a CMU dumpster • Revised finish tags • Revised elevation tags • Added material note 12 March 2020 Peer Review Narrative Page 2 • Update Sill Height • Coordination of Dumpster Height • Updated keynote locations 5. Sheet A1.5 Egress Plan • Revise direction of egress path direction tag • Updated restroom floor plan layout • Added Egress path for restrooms • Removed nitrogen cage • Updated ATM location • Updated fountains location • Updated island 6. Sheet A1.6 Cot Floor Plan • Add missing room name • Revise backroom room names • Security camera matches EF sheets, no work done. • Updated restroom floor plan layout • Updated ATM location • Updated fountains location • Updated island • Removed nitrogen cage 7. Sheet A2.0 Floor Plan • Revise duplicate room name • Revise wall tags • Flip wall sections • Revise exterior elevation tags • Revise leader lines on detail 4/A2.0 • Updated restroom floor plan layout • Updated restroom and backroom dimensions • Revised wall types • Added and revised wall section tags • Added wall tags • Revised framing elevation view • Changed restroom numbers • Update Floor Plan showing metal stub wall after CMU Block wall • Update Floor Plan showing correct front tower columns • Added insulation to detail 3 • Update rear wall type C • Dimension added on interior walls • Men's restroom wall type revised • Women's bathroom wall dimensioned 8. Sheet A2.1 Enlarged Restroom Plan & Details 12 March 2020 Peer Review Narrative Page 3 • Added baby changing stations per EF sheet location • Revise finishes & door tags • Added missing dimensions • Updated floor plan • Updated interior elevations • Added paper towel dispenser keynote detail • Revised site photometrics plan. • Changed door hardware to match push/pull hardware for multiuser. • Added CG-2 note. • Added and/or centered hooks on stall doors. • Added diaper changing station to men's restroom. • Added urinal elevation to men's restroom and added detail keynote detail. • Added paper towel dispenser to both restrooms and added keynote detail. • Added general note for toilet partitions. • Update Restroom Plan showing correct tags • Remove one hosebib from women's restroom • Update Women's Restroom Elevation showing diaper station and tile on wall end • Revised keynotes and callouts • Keytag 14 (Paper towel dispenser) relocated. • Keytag 14 on elevation (5) revised 9. Sheet A2.2 Wall Substrate & Wall Finish Plan • Revise wall finishes • Revise not used detail • Updated restroom floor plan • Updated finishes accordingly • Revised arrow locations • Coordinate Wall finish location and dimensions • Update signage schedule 10. Sheet A2.3 Reflected Ceiling Plan • Updated RCP based on the new floor plan layout • Added light dimension • Revised lighting types • Revised ceiling schedule • Revised section tags • Update Ceiling Pattern • Update front tower light location • Revise Awning Frame • Light Fixtures are shown flanking awing. No lightning is required below awning • Light fixtures are suspended from unistrut spanning joist where required • 24"x24" Access Panel included • Updated lighting locations • Revised dimensions • Keytag 9 (ceiling origin point) relocated 12 March 2020 Peer Review Narrative Page 4 • Dimension of ceiling origin point revised 11. Sheet A2.4 Roof Plan • Add missing keynotes • Add walk pad to roof • Adjust keynotes on plan • Add missing crickets • Add missing slopes on tower • Revise canopy supports • Revise gutter and downspout locations • Added new sections cute • Added overflow scuppers • Moved roof ladder • Revised skylight details • Revised keynotes • Added keynote tags • Update Symbol for tag (15) 12. Sheet A3.0 Exterior Elevations • Revise linetype • Revise canopy • Revise stripes in glazing • Revise downspout locations • Revise signage • Added finish tags • Added section tags • Revised notes • Added dimensions • It is our intention for the canopy to be engineered by the manufacturer to be self- supporting between the columns. If this cannot be accomplished, we will devise a support system as required. 13. Sheet A3.1 Exterior Elevations • Revise linetype • Add door number • Added finish tags • Added section tags • Revised notes • Added dimensions • Overflow scuppers shown per roof plan location 14. Sheet A4.0 Wall Sections • Wall sections updated to coordinate w/ plans • Revised all sections 15. Sheet A4.0.1 • Wall sections updated to coordinate w/ plans 12 March 2020 Peer Review Narrative Page 5 16. Sheet A4.1 • Revised building sections 17. Sheet A5.0 Interior Elevation • Revise interior elevation finishes • Revise front entry wall height • Revise clock outlet location • Add missing HVAC in bulkhead • Updated locations of fountains and ATM • Removed electrical raceways • Added finish tags • Moved sign to be centered • Changed scale of drawings • Beer cave door style updated • Updated detail reference 18. Sheet A5.0.1 • Updated location of ATM and EWCs • New sheet with existing elevations to change scale • Interior Sales Elevation equipment coordination, ATM relocation, trash and hot hold display added, refrigerated display case shown on elevation • Graphical updates 19. Sheet A5.1 Interior Elevations • Update island elevation • Revise interior elevation finishes • Revise bulkhead location • Add interior elevation notes • Remove unused detail • Missing 3 equipment elevations (No cut sheet available) • Revised tile patten detail #1 • Added corner guards • Cabinet coordination on Interior Elevation -Safe • Filler panel added on Interior Elevation -Island • Tea and Nitro beverages removed 20. Sheet A5.2 • Updated interior elevation per revised fixture layout • Added blocking info. • Added water filter side view and elevation. • Added elevations 7, 8, and 9. • Added electrical panel elevation as per electrical. • Added coat hooks. • Added missing top 6" of Gl-P8. 12 March 2020 Peer Review Narrative Page 6 • Updated arrows on key plan. • Added baseboard as needed. • Added open space area note. • Update Interior elevations per updated layout • Additional callouts • Updated location of Veeder Root 21. Sheet A5.4 FINISH FLOOR PLAN • Updated restrooms floor plan layout • Updated locations of floor drains • Removed nitrogen cage • Revised line type scales • Revised general notes • Dimensions added 22. Sheet A6.0 • Revised storefront details • Updated dimensions. • Provided intermediate vertical mullion as required my wind loading. • Revised SHGC on table as per zone 2 requirements. • Added not used note. • Changed deltas to hexagons. 23. Sheet A6.1 • Revised Exterior Materials Schedule 24. Sheet A7.0 • Revised parapet detail • Revised door head detail • Revised keynotes • Added parapet cap detail • Removed unused details • Revised details to show metal stud furring • Insulation added to wall details • Water Heater/Mop Sink Coordination • Revised detail 15 25. Sheet A7.1 • Revised canopy detail • Revised bump out detail • Added canopy detail • Removed unused details • Added scupper detail • Revised corner bump out detail 26. Sheet EF1.0 EQUIPMENT FLOOR PLAN 12 March 2020 Peer Review Narrative Page 7 • Updated equipment plan based on updated EF sheets • Graphical revisions 27. Sheet EF1.1 EQUIPMENT SCHEDULE • Updated equipment schedule based on updated schedule 28. Sheet EF2.0 FIXTURE FLOOR PLAN • Updated fixture plan based on updated EF sheet • Graphical Revisions 29. Sheet EF2.1 FIXTURE SCHEDULE • Updated fixture schedule based on updated schedule • Updated schedule 30. Sheet M1.0 Mechanical Plan • Updated louver spec • Updated detail 3 • Updated restroom diffuser and exhaust layout • Revised site photometrics plan. 31. Sheet M1.1 Mechanical Roof Plan • Removed details 2 and 3 and called for structural coordination • Revised site photometrics plan. 32. Sheet M1.2 Refrigeration Piping Riser Details • Updated beer cave riser • Revised site photometrics plan. 33. Sheet M2.1 Refrigeration Specifications • Added beer cave to set points • Revised site photometrics plan. 34. Sheet P1.0 DRAIN PIPING PLAN RISERS & SCHEDULES • Updated restroom plumbing layout. 35. Sheet PLI WATER PIPING PLAN RISERS • Updated restroom plumbing layout. 36. Sheet P1.2 SLAB PENETRATION PLAN • Updated restroom plumbing dimensions. 37. Sheet E0.1 Site Power Plan • Revised fuel canopy lighting. • Revised location of site lighting fixtures. 38. Sheet E1.0 Electrical Floor Plan 12 March 2020 Peer Review Narrative Page 8 • Added power for signage and 1 BNB Syrup • Revised location for Panel "L" in detail 2 • Revised power location for CO2 Monitor and Door Buzzer • Added heat trace power in Beer Cave and added keynote "14" • Added speaker to beer cave • Updated restroom power layout • Updated ATM location • Added plan North Arrow • Updated receptacle for speaker location in the back • Updated panel "L" location • Removed receptacle for touch screen tea and nitro cold draft • Added convenience receptacle (B-5) • Moved receptacle for Cold Well (B-28) • Added receptacle for Micro-matic (A-13) • Added circuit for Nitrogen unit (A-5) • Added GCFI outlets 39. Sheet E1.1 Panel Schedules and One -Line Diagram • Revised BUS AMPS for "MDP" • Revised branch panels ratings to be series rated • Revised Panel "S" to have Isolated ground bus • Revised breaker A/31 and circuit for A/31,53 • Removed panelboard notes from "L" • Revised panel F. • Renamed circuits A-5 & A-13. • Renamed circuit A-11 • Updated Panelboards A & B 40. Sheet E1.2 Electrical Slab Penetration Plan • Added one penetration P1 under island in sales floor 41. Sheet E1.4 LOW VOLTAGE FLOOR PLAN • Updated ATM data receptacle location • Updated speaker data receptacle location • Added plan North Arrow 42. Sheet E1.5 Low Voltage Details Removed 1 data for camera 43. Sheet E1.6 Electrical Details • Revised INTERIOR ELEVATION -BEVERAGE BAR detail #5 • Updated outlet locations 44. Sheet E2.0 Lighting Plan 12 March 2020 Peer Review Narrative Page 9 • Revised lighting types in back room and revised counts in lighting fixture schedule • Updated lighting layout for restrooms area. • Updated lighting for beer cave • Added (1) DP4sc in sales floor area • Added occupancy sensor in beer cave • Updated detail view for soffit lighting in canopy • Re -circuited beer cave lights to L-13 • Added plan North Arrow 45. Sheet E2.1 Lighting Control Plan • Revised lighting types in back room and revised counts in lighting fixture schedule • Added circuit L-29 to Lighting contactor • Updated restrooms lighting layout • Removed wall occupancy sensor switch in the offices according to NEC • Added occupancy sensor in beer cave • Added (1) DP4sc in sales floor area to group 1 • Added plan North Arrow 46. Sheet E2.1 LIGHTING PLAN & SCHEDULE • Updated light plan and schedule layout per new one 47. Sheet E2.2 INTERIOR PHOTOMETRICS PLAN • Awaiting new photometrics per new lighting layout 48. Sheet E2.12 Interior Photometrics • Revised counts in lighting fixture schedule 49. Sheet E2.3 Egress Photometrics • Revised layout and photometrics in restrooms area 50. Sheet EF-L Lighting Plan and Schedule • Revised lighting types in back room and revised counts in lighting fixture schedule • Updated light plan and schedule layout per new one. CAR WASH: 1. Sheet CWA1.0 Floor Plan • Add elevation reference • Added missing keynotes to plans • Added missing dimensions • Relocate POS • Relocate timer • Revised sections marks • Added new section marks • Added bump outs on corners • Revised door schedule • Added Keynote 1 to plan 12 March 2020 Peer Review Narrative Page 10 2. Sheet CWA2.0 Exterior Elevations • Revise POS and time location • Revise signage • Added finish types • Added bump outs • Added sections marks • Revised side metal canopy • Added overflow drain • Centered wall mounted items 3. Sheet CWA3.0 Wall Sections • Wall sections updated to coordinate w/ plans • Revised all wall sections • Added down spout detail 4. Sheet CWA3.1 • Added overflow scupper to detail 4 • Updated view references 5. Sheet CWA4.0 Building Section • Building section update to coordinate w/ plan • Revised all wall sections • Added new details 6. Sheet CWA5.0 Roof Plan • Revise carwash roof plan • Update direction arrows to coordinate w/ site plan • Revise car wash reflected ceiling plan • Revised building section • Added metal awning detail • Revised location of wall packs Sleet GIALE 0 Car- Wash Power- Plan 7. Sheet CWE1.0 Car Wash Power Plan • Revised circuit CW/13,25,27 • Revised roof plan to show bump outs • Revised ceiling plan to show bump outs End of Narrative