Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Narrative for Permit Re-submission
� 1925 Prospect Ave. Orlando, FL 32814 Orlando, P (407) 661-9100 CG1GZGtC/ & iBisOLt Architects Engineers Planners F ww -p.00 01 c �.covu Narrative for Permit Re -submission June 10, 2020 7-Eleven — Fort Pierce, FL Indrio Rd. & Kings HWY Fort Pierce, F134952 o U D % l ARCHITECTURE Sheet A0.1 Code Compliance Information Sheet Sheet A1.3 Site Plan Sheet A1.3.1 Architectural Site Plan Details Sheet A1.4 Dumpster Enclosure & Details Sheet A1.5 Egress Plan_ Sheet A1.6 CO2 Floor Plan Sheet A2.0 Floor Plan CP: 2190262 • Revised sheet index per REV 1 • _Added new sheet_ • Add POS at Carwash • Propane tanks not shown on EF Sheets • Updated bollard locations • Revised accessible route • Revised site dimensions • Revised keynote tags • Update Building Layout • Update Keynote Schedule • Relocated detail 2/A1.3 • Removed Keynote 15 • Added new sheet • Add finishes to dumpster elevation • Revise front dumpster enclosure elevation • Revise text scale • Revise gate bollard detail • Revise dumpster enclosure wall section • Dumpster enclosure plan meets CMU coursing, as it is built with CMU, Proto doesn't demonstrate a CMU dumpster • Revised finish tags j • Revised elevation tags • Added material note I • Update Sill Height j • Coordination of Dumpster Height •_ Updated keynote locations _ •, Revise direction of egress path direction tag • Add missing room name • Revise backroom room names I _ • _ Security —camera matches EF sheets, no work done _J • Revise duplicate room name • Revise wall tags May 20, 2020 Peer Review Narrative Page 2 Sheet A2.1 Enlarged Restroom Plan & Details i Sheet A2.2 Wall Substrate & Wall Finish Plan Sheet A2.3 Reflected Ceiling Plan • Flip wall sections • Revise exterior elevation tags • Revise leader lines on detail 4/A2.0 • Revised wall types • Added and revised wall section tags • Added wall tags • Revised framing elevation view • Changed restroom numbers • Update Floor Plan showing metal stub wall after CMU Block wall • Update Floor Plan showing correct front tower columns • Added insulation to detail 3 • Updated wall types • Update rear wall type C • Dimension added on interior walls • Men's restroom wall type revised _•_ Women's bathroom wall dimensioned • Added baby changing stations per EF sheet location • Revise finishes & door tags • Added missing dimensions • Revised site photometrics plan. • . Changed door hardware to match push/pull hardware for multiuser. • Added CG-2 note. • Added and/or centered hooks on stall doors. i • Added diaper changing station to men's restroom. j • Added urinal elevation to men's restroom and added detail keynote detail. • Added paper towel dispenser to both restrooms and added keynote detail. • Added general note for toilet partitions. • Update Restroom Plan showing correct tags • Remove one hosebib from women's restroom • Update Women's Restroom Elevation showing diaper station and tile on wall end • Revised keynotes and callouts • Keytag 14 (Paper towel dispenser) relocated. _ • _ Keytag 14 on elevation (5) revised • Revise wall finishes • Revise not used detail • Revised arrow locations • Coordinate Wall finish location and dimensions • —Update signage schedule • Added light dimension • Revised lighting types j • Revised ceiling schedule • Revised section tags -------____Update Ceiling Pattern May 20, 2020 Peer Review Narrative Page 3 • Update front tower light location • Revise Awning Frame • Light Fixtures are shown flanking awing. No lightning is required below awning • Light fixtures are suspended from unistrut spanning joist where required • _ 24"x24" Access Panel included_ • Updated lighting locations • Revised dimensions • Keytag 9 (ceiling origin point) relocated • Dimension of ceiling origin point revised Sheet A2.4 Roof Plan • Add missing keynotes • Add walk pad to roof • Adjust keynotes on plan • Add missing crickets • Add missing slopes on tower • Revise canopy supports • Revise gutter and downspout locations j • Added new sections cute • Added overflow scuppers • Moved roof ladder • Revised skylight details • Revised keynotes • Added keynote tags • Update Symbol for tag (15) Sheet A3.0 Exterior Elevations • Revise linetype • Revise canopy • Revise stripes in glazing • Revise downspout locations I Revise signage 1 i Added finish tags i Added section tags i Revised notes • Added dimensions • It is our intention for the canopy to be engineered by the manufacturer to be self-supporting between the columns. If this cannot be accomplished, we will devise a support system as required._— Sheet A3.1 Exterior Elevations _ • Revise linetype • Add door number • Added finish tags • Added section tags • Revised notes • Added dimensions • Overflow scuppers shown_ per roof plan location _ rSheet A4.0 Wall Sections F • Wall sections updated to coordinate w/ plans �___ _ _—_ _ _ __ _ _ f _ • _Revised all sections Sheet A4.0.1 Wall Sections • Wall sections updated to coordinate w/ plans • Revised all sections ff May 20, 2020 Peer Review Narrative Page 4 Sheet A4 1 Building Sections • Revised all building sections Sheet A5.0 Interior Elevations a Revise interior elevation finishes • Revise front entry wall height • Revise clock outlet location • Add missing IIVAC in bulkhead • Removed electrical raceways • Added finish tags • Moved sign to be centered • Changed scale of drawings • Beer cave door style updated • Updated detail reference Sheet A5.0.1 Interior Elevations — • _ _ _ New sheet with existing elevations to change scale • Interior Sales Elevation equipment coordination, 1 ATM relocation, trash and hot hold display added, refrigerated display case shown on elevation __________ Sheet A5.1 __•__ Graphical updates-----------------------=-------� Interior Elevations • Update island elevation • Revise interior elevation finishes • Revise bulkhead location • Add interior elevation notes • Remove unused detail • Revised tile patten detail #1 • Added corner guards • Cabinet coordination on Interior Elevation -Safe • Filler panel added on Interior Elevation -Island _ _ —_ — —• Tea and Nitro beverages removed_ — Sheet A5.2 Interior Elevations • Added blocking info. Added water filter side view and elevation. I • Added elevations 7, 8, and 9. j • Added electrical panel elevation as per electrical. • Added coat hooks. i • Added missing top 6" of G1-P8. j • ! Updated arrows on key plan. • Added baseboard as needed. • Added open space area note. • Update Interior elevations per updated layout j • Additional callouts. j • Updated location of Veeder Root Sheet A5.4 Finish Floor Plan • Revised line type scales • Revised general notes • Dimensions added Sheet A6.0 • Updated dimensions. • Provided i#termediate vertical mullion as required my wind loading. • Revised SHGC on table as per zone 2 requirements. j • Added not used note. ---- - - — 0 Changed deltas to hexagons^ Sheet A7.0 Details a Added parapet cap detail • Removed unused details May 20, 2020 Peer Review Narrative Page 5 • Revised details to show metal stud furring • Insulation added to wall details • Water Heater/Mop Sink Coordination • Revised detail 15 Sheet A7.1 Details - • Added canopy detail Removed unused details ... • ...Added scupper detail. • _Revised corner bump out detail Sheet EF 1.0 Equipment Floor Plan • Graphical revisions _ Sheet EF 2.0 Counter Plan _ - •- Graphical Revisions Sheet EF 2.0 Counter Schedule _ Updated schedule MECHANICAL -------_- Sheet MO.1 --__-__ - -_----_----- _--_-� -Sheet M1.0 T Updated louver spec -� • Updated detail 3 j-� �_� - _ • _Revised _site photometrics plan. Sheet M1.1 Removed details 2 and 3 and called for structural coordination • Revised site photometrics plan. Sheet M1.2 _ Updated beer cave riser Sheet M2.0 SheetM2.1 -- - - - • Added beer cave to set points - - - - - _ _ Revised site photometrics plan. ELECTRICAL Sheet E0.1 • Revised fuel canopy lighting. • Revised location of site lighting fixtures. Sheet E1.0 • Added power for signage and 1 BNB Syrup j • Revised location for Panel "L" in detail 2 i • Revised power location for CO2 Monitor and Door Buzzer • Added heat trace power in Beer Cave and added keynote "14" • Added speaker to beer cave • Removed receptacle for touch screen tea and nitro cold draft • Added convenience receptacle (B-5) • Moved receptacle for Cold Well (B-28) • Added receptacle for Micro-matic (A-13) • Added circuit for Nitrogen unit (A-5) • Added GCFI outlets Sheet E1.1 _ • Revised BUS AMPS for "MDP" • Revised branch panels ratings to be series rated • Revised Panel "S" to have Isolated ground bus • Revised breaker A/31 and circuit for A/31,53 • Removed panelboard notes from "L" • Revised panel F. May 20, 2020 Peer Review Narrative Page 6 • Renamed circuits A-5 & A-13. j Renamed circuit A-11 • Updated Panelboards A & B Sheet E1.2 1 Added one penetration PI under island in sales floor Sheet E1.3 ---------------_____-.__--_— 1 - ---- --- ---- --_----------- Sheet El.4 Sheet .E15---_----------- ---- ---- -----_ ._...-_..--____.__._ __. Removed 1 data for camera—--------------------� _. .. ...... ... __.. _ .. .._.-.-.-____._�..._.-_.__.._-.-.__..-__---_-___-.._.-__ Sheet E1.6 __....._..--_.-.._-__....-..._.__.__.. Revised INTERIOR ELEVATION -BEVERAGE BAR detail #5. • Updated outlet locations Revised lighting types in back room and revised Sheet E2.0 counts in lighting fixture schedule 1 Revised exterior wall lighting. Revised cooler lighting. • Revised ceiling sales lighting. Sheet E2.1 —• Revised lighting types in back room and revised J counts in lighting fixture schedule • Added circuit L-29 to Lighting contactor Sheet E2.2 Revised counts in lighting fixture schedule I i Sheet E2.3 Added new sheet. • Revised layout and photometrics in restrooms area Sheet E2.4 Revised site photometrics plan. j Sheet EF-L Revised lighting types in back room and revised counts in lighting fixture schedule PLUMBING Sheet P0.1 SheetP 1.0 -- --- - ---- - - - - -- ---- -- - - - - - - --- - - - - - - -- - - _ - - - - - - Sheet P2.0 STRUCTURAL Sheet 5001 Sheet S 101 Sheet S201 ' Sheet 5202 End of Narrative