Loading...
HomeMy WebLinkAboutengineeringENGINEERING REVIEW.• BOAT LIFT TOP CARRIER BEAMS AND MOUNTING BRACKETS COMPLY WITH WIND LOAD REQUIREMENTS OF THE 6TH EDITION (2017) FLORIDA BUILDING CODE, PER ASCE 7-10, AND PER DESIGN LOAD REQUIREMENTS OF THE 2015 EDITION ALUMINUM ASSOCIATIC ALUMINUM DESIGN MANI BEAMS AND MOUNTING BRAC INSTALLED PER HI —TIDE INSTRUCTION EXCEED ULTIMATE DESIGN WIND SPE 180 MPH (EXPOSURE CATEGORY C BOATS ARE TO BE REMOVED FROM E LIFTS PRIOR TO A MAJOR WIND EVE GS: PILING PENETRATION TO BE 10' INTO THE SAND BOTTOM OR 5' JNTO ROCK STRATA, SUB —SURFACE CONDITIONS CAN VARY GREATLY, THE CONTRACTOR SHALL VERIFY ALL PILE CAPACITIES TO COMPLY WITH FBC 201 Z ALL PILINGS TO BE 8" MINIMUM DIAMETER 2.5 C. C. A PRESSURE TREATED WOOD, PRE —STRESSED CONCRETE OR COMPARABLE EQUIVALENT, ELECTRICAL REVIEW i/2 HP ELECTRIC MOTOR 8.8 AMPS ® 115V EACH 4.4 AMPS ® 230V EACH QUANTITY.• 2 TOTAL WATTS: 2024 X2 E 1 HP 12.8 6.4 ti.... QUANTITY 2 TOTAL WATTS, o „ o w 2944 Digitally signed by Roger M BARER DN: c=US, o=Sustainable Earth Engineers dba MCR Engineers, ogcr Baber, P.E. ou=A0141OD0000017183ADA33 C00001 860, cn=Roger M BABER Date:°2°q�p,�0lia'1a5,1� 0 o°°oo R M e 0 � 8TATE OF �FBk4ORIDPO� "c00008 °pOoN A aaop0"� ooa -04'00' ROGER BARER P.E. NO. 43855 CR PROFESSIONAL ENGINEERING C.A. NO, 26967 1014 NE PINELAKE DR, STUART, FL 34994 lNG MOUNTING TABS DIA. SS LAG TS FOR WOOD PILING OR CONCRETE ANCHORS FOR CRETE PILINGS PER PILING UIRED.M/N/MUM (2) 3/8" SS CARRIAGE BOLT FOR ACHING MOUNTING TAB TO LEFT REQUIRED PER PILING. MOUNTING TAB CONSTRUCTED FROM 1/4" X 2" ALUMINUM 6061—T6 FLAT BAR, O O � 9, 000 LB. GEAR LIFT ( & > /7�lBOATLIFT0 AND MARINE PRODUCTS GEAR DRIVE X2 BOAT LIFT 2017 FBC �l /�(fl 4050 SELVITZ ROAD FORT PIERCE, FL J4981 R. HYDE SCALE: NTS DATE: 4117120 REV** 1 1-800-544-0735 www.hi-tide.com