Loading...
HomeMy WebLinkAboutSolar planACCEPTABLE ALTERNATE EXTEND THRU TO SHEATHING ADD SEALENT AT CONNECTION ADEQUATE LENGTHSTOES CURE BRACKET TO CEMENT TILE. DRILL HOLE THRU CONIC. TILE AND INSTALL TAPCON SO AS NOT TO BREAK TILES. 1/4° LAG ACCEPTABLE ALTERNATE OR #14 PHIL PAN OR HEX HEAD ACCEPTABLE ALTERNATE NOTE: THE MOUNTING BRACKET BY IRONRIDGE IS ACCEPTABLE FOR INSTALLATION OF THE PANELS PRVIDE 3/8"x 2 1/2" LAGS 4FT & 6 FT O.C. MAX TO EXISTING TRUSSES BELOW PANELS S-5 CLAMP S-5 CLAMP 3" PANEL '032 THICK STANDING SEAM CONNECTION Au. Hwowus: swwr:es os oALv PANELS SHALL NOT BE wctei i cn iu rnoucc vnurc PERCENT OF MEAN HEIGHT, OR 3 FT. WHICH EVER IS SMALLER. upper hold down clamp see detail A or optional detail A-1 10' ar 12' solar poneis x ¢ CU E STRAP Bf A KET DETAIL C x d (U E NOTE: EAGLE CLAW PLASTIC J"`i. ALUMINUM TOP CLAMP HEADER BRACKET ACCEPTABLE ALTER �1/4"-20x3/4' Lq S.S. OR PAN I. PANEL 2-/ 14x2"PAN HEAD OR HEX HEAD SCREW. — MIN. 1/2" O.S.B. OR PLYWOOD SHEATHING STRAP SPACING upper clamp assembly detail A-1 48" O.C. MAX strap..,_._ —� LOWER/RET LOWER hold down clamp see detail B PLEASE NOTE: LOWER CLAMP/SPRING ASSEMBLY MAYBE OMITTED PROVIDED A CONTINUOUS CROSS STRAP IS INSTALLED NO MORE THAN 12" ABOVE LOWER/RETURN ASSEMBLY ROOF LAYOUT GENERAL CONDITIONS 1. THE SOLAR COLLECTOR INSTALLATION AS DETAILED IN THE DRAWINGS IS FOR THE INSTALATION OF POTABLE WATER HEATING SYSTEMS ON STRUCTURES UP TO 35 FEET IN HEIGHT WITH ROOF SLOPES BETWEEN 0 AND 30 DEGREES, ROOF AREAS 1 AND 2 BUT NOT CORNERS, 2. THE DESIGN OF THIS INSTALLATION IS -F OR HEX HEAD SCREW. 7 A F 'ROOFING &—_'L m u ----------i--- O.S.B. OR PLYWOOD SHEATHING :: SPRING ASSEMBLY AT CONTRACTORS OPTION III 14X 1 1/2-PAN HEAD r—OR HEX HEAD SCREW. lower damn assemlo( ROOFING MIN. 1/2" O.S.B. OR PLYWOOD SHEATHING detail B NOTE: LOWER CLAMP/SPRING ASSEMBLY MAY BE DELETED PROVIDED BOTTOM CONTINUOUS STRAP IS LOCATED WITHIN 12" OF BASE BASED ON ASCE7-10 FOR SURFACE AREAS BETWEEN 2D AND 48 SQUARE FEET RESULTING IN A MAXIMUM WIND PRESSURE OF <- 67 PSF. x � '� THE INSTALLATION SHALL UTUZE HARD- 1'I WARE PROVIDED BY THE MANUFACTURER NRER (70 `— yl� AS DETAILED IN THE (SHOWN ON ! V MANUAL OR AS SHOWN ON PLAN. ENSURE TILE CAMN. IS FILLED COMPLETLY WITH DOW TILE BOND ROOF TILE ADHESIVE OR EQUAL APPLY ADHESIVE TO TILE AQUA THERM ;q1 / MOUNTING BRACKET IS ATTACHING 70 PLUS ALL PROVIDE LENGTH TO SECURE L TILES AROUND IT (S) MINIMUM. BRACKET TO CEMENT TILE. DRILL HOLE THRU CONC, TILE AND INSTALL SCREW SO AS NOT TO BREAK TILES. MOUNTING BRACKET 14X 1 1/2"PAN HEAD STRAPPING OR HEX HEAD SCREW. / ROOFING MIN. 1/2" O.3B. OR PLYWOOD SHEATHING rERRAFT MOUNTING BRACKET DUAL C FLORIDA BUILDING CODE 2014 5TH EDITION O TO INCLUDE THE EXISTING AND PANEL RISER SYSTEM RESIDENTIAL CODES ULTIMATE DESIGN WIND SPEED: 180 NOMINAL DESIGN WIND SPEED: 140 RISK CATAGORY: 2 IMPORTANCE FACTOR: 1.0 CONIC. BARREL/FLAT EXPOSURE CATAGORY: C TILE INTERNAL PRESSURE COEF: +-0.18 -- ENCLOSED STRUCTURE T `9,AY THE STRUCTURAL COMPONENTS OF THIS- 1/2' D.S.e OR PLYWOOD PLAN ARE IN COMPLIANCE WITH THE 2014 ROOF DECKING FLORIDA BUILDING CODE, WIND LOAD COMPLIANCE AND ITS RESISTANCE TO STRAP BRACKET RAFTER GRAVITY AND DESIGN PRESSURES TILE ROOFD,E Cl) E O M U Li Z M N U W WIC- ¢ , C4 L7 LilQ Y ¢ N Z zW W W 2 W 0 Z Cl) Y W N�C]rW-,2 Y U �ZW LJ JW ON <E ¢ =A�d WlnN ZWZ W LOW ¢W, NMW CU d L IJ GO Y h Z CIS 7U W M H-W� L CU ,R Y Cn z W Uj W o Z O Z W REVISION I DATE 9 i x W1n W <Z as <d. LL< 00 ON z F O 0 z < VATE 06-11-16 BY CK ET NUMBER 44 S-1