Loading...
HomeMy WebLinkAboutApproved 203706-20d Compaction - Bldg. 6 signed Headquarters � C IL t ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 &J LVL AND TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way C.A.#5693 Sanford, FL. 32771 KSMengineering.net November 4, 2020 KSM JOB# : 203706-20d/CH/ct CONTRACTOR: Proctor Construction 2050 U.S. Highway 1, Suite 200 Vero Beach, FL 32960 JOB LOCATION: A-1 Truss 4451 St. Lucie Boulevard Ft. Pierce, Florida PERMIT#: 2009-0498 Dear sir, Enclosed, please find the nuclear density test results performed on the footers and pads for Buildings 6 at the above referenced project. Should you have any question, please feel free to contact our office. Respectfully, Digitally signed This item has been electronically signed and sealed by Bryan E.Dahlke,PE FL.Lic.81439 by Bryan E on the date stated directly to the right using a digital signature. Printed copies of this documents are not Dahlke considered signed and sealed and the signature must be verified on any electronic Date: 2020.11 .04 copies. 10:15:05 -05'00' Bryan E. Dahlke, P.E. V.P. of Engineering PE#81439 11/04/20 Email to: bbramble@proctorcc.com Proudly Serving Florida since 1990 Headquarters � CP IL t ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 &J LVL AND TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.#5693 Sanford, FL. 32771 KSMengineering.net ASTM D 1557 and ASTM D 6938 DATE TESTED: 10/30/2020 KSM JOB# : 203706-20d/CH/ct PERMIT#: 2009-0498 NUC# 417 CONTRACTOR : Proctor Construction Nuc Model: 3500 JOB LOCATION: A-1 Truss Nuc Serial#: 3417 4451 St. Lucie Boulevard Ft. Pierce, Florida MATERIAL: Brown Sand with Rock ITEM TESTED: Footers& Pads for Buildings 6 TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH Moisture READ DENSITY PROCTOR COMPACTION VALUE (P.C.F.) Building 6 1. N.W. Pad 0" - 12" 10.7% 55+ 113.4 115.8 97.9% 2. Center Pad it 11.0% 112.7 115.8 97.3% 3. S.E. Pad it 11.2% 112.4 115.8 97.1% 4. N. Footer it 13.0% 112.2 115.8 96.9% 5. N. Interior Footer 12.2% 113.7 115.8 98.2% 6. N. Center Footer 12.7% 113.3 115.8 97.8% 7. S. Center Footer 12.3% 112.8 115.8 97.4% 8. S. Interior Footer 11.9% 113.9 115.8 98.4% 9. S. Footer 11.8% 112.6 115.8 97.2% @ Test Locations the Density& Penetrometer readings indicate the Degree of Compaction Meets Minimum Requirement for Staked Foundation Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been Bryan E. Dahlke, P.E. altered from the approved inspected V.P. of Engineering condition. PE#81439 11/4/2020 Proudly Serving Florida since 1990 Headquarters � C IL t ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 &J LVL AND TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way C.A.#5693 Sanford, FL. 32771 SOIL COMPACTION REPORT KSMengineering.net ASTM D 1557 DATE TESTED 10/30/2020 KSM JOB# : 203706-20d/CH/ct PERMIT# 2009-0498 CONTRACTOR Proctor Construction JOB LOCATION A-1 Truss 4451 St. Lucie Boulevard Ft. Pierce, Florida 117.0 I I I I I I I W E I I I I I I I G116.0 —.. ..—..—�.—..—..� —.. ..—..—�.—..—..�—.._..... I I I I I I H I I I I I I I I T 115.0 ._.._..I—..—.. _.._I._.. I—.._..�.._.._ P I I I I I I I I I I I I I I I C 114.0 113.0 —..—..—..—..—:.—..—..—..—..—..—..— D R I I I I I I Y112.0 ..—.._l._.._..I_..—.. .._.._�._.._..I—..—.. .._.._ I I I I I I I 111.0 ..—.. ..—..— .—..—.. .—.._..;_.._..+..—.. 5 6 7 8 9 10 11 12 13 Moisture - % of Dry Weight Soil A Description: Brown Sand with Rock Proctor Optimum Moisture: 9.6% Proctor Max. Dry Density: P.C.F. 115.8 Bryan E. Dahlke, P.E. V.P. of Engineering PE#81439 11/4/2020 Proudly Serving Florida since 1990