HomeMy WebLinkAboutWest Contract_0000104-,D t 544 r5 U^ f jCar1v
Contract
Full Cando Renovations November 16, 2020
Jock & Christina West #001
401-640-3416 - 43jock@gmail.com
8880 S. Ocean Drive, Unit 109, Jensen Beach, Ft. 34957
Project #: 20124 - island Dunes i - 109 - West
`i1 LA130R AND MATERIAL REQUIUMENTS LABOR MATERIAL
Permit Cost/Fees -Notice of Commencement, building permit application fee, building permit
review/approved fees, Termination of the Notice of Commencement and iKB time- Pricing
varies and is determined by the building department upon review of the permit application and
cannot be determined until after the permit have been reviewed and approved by the building
1 department. - - ""
Engineer Cost/Fees - Upon review of the permit application the budding department may require, r
that we submit new plans signed off by an Engineer before they can approve the permit, the
Engineer fee varies based on the scope of the roject
* Permit plans $845 - AC Plans $650 (Bldg. D pt will dictate whether or not we need engineered',d
7
AC plans) genera D'-
R Purchase alll rebuild material I $2 000.00
4 !Remove all mirrors m the unit * $400.00
5
save the French Doors front bedroo in
in
I
6
ect any remaining window treatments throughout condo and Dispose
j Disconnect
Disconnect all kitchen appliances - refrigerator, dishwasher, range, microwave, etc. - Dispose
* Homeowner is to supply iKB with the new appliance spec's prior to ordering the cabinetry to
7
ensure that the new appliances and cabinet layout work.
Disconnect washer and dryer - Dispose
* Homeowner is to supply iK8 with the new appliance spec's prior to ordering the cabinetry to
8
ensure that the new appliances and cabinet layout work.
*'
9
Disconnect existing kitchenclings lights -Dispose
i
10
Disconnect all electrical lug s switches throughout condo
plugs/switches
11
Disconnect all ving room ceilings spose
(I
12
Disconnect master bathrotom faucet, .sink, and toilet Dispose
*'
1.3
� Disconnect guest bathroom faucet, sink, and toilet - Dispose
*'
14
Remove existing kitchen countertop and cabinetry - Disposeis
*;
Remove master bathroom countertop,cabbinetry wall
lose t to the toilet -_Dispose �
*'
16
I Remove existinexisting
guest bathroom countertop rto inetry
'm- and abnet ry Dlp
gg.
- -
17
I _. ._ .. _p
[Chip out balcony the
18
Remove base molding throughout entire condo - Door casing is going
Remove kitchen ceiling panels, drywall, and soffit framing (if applicable, depending on
19
!sprinklers)
-..
*'
20
.. y..
!Remove kitchen walls entering into kitchen area dr wall
21
1 Chip out kitchen and entry way the flooring
22.
Remove existing master bathroom shower doors -Dispose
73
Remove existing guest bathroom shuwet doors - Dispose
24
1 Chip out master bathroom dry floor
Initials - Island Kitchen and Bath pg. 1
25 : Remove door at master bath
26 Chip out guest bathroom dry floor and existing shower
27 R ll d Di
emove a oors spose
28 Remove existing master closet
29 Remove existing guest closet
ove
above material
30 Inspect alllex exposed lumbin n e edispose
ct icai within dump
walls Due to updated building codes, if our
p P P g/ p g Y
unit is not updated/current to code, IKB is required to bring it up to code - These costs are to be
31 covered
the homeowner.
y 32 Reframe kitchen will to counter height - 34 1/2" 1 -
33 R d n;
e f k t h II
rape c en wa s an cer ngs
34
Drop ceding in the living room to hold LED recessed lights
35
Replace drywall where existing mirrors were
36 Install soffit into front room for A/C
37 Install duct work in kitchen ceiling soffit
*'
38 I
Install new shower system in master bathroom shower
39
Install new shower system in bathroom #2 shower
40 j
Mud, finish and prime all walls and ceilings
52 (
Tile: Main Living Area
41
RedGuard balcony
'rile
I
Install 7 40sgft of file on the balcony @ $5.75 per sgff.
- Material - HF: Cypress Mist - 9"x 48" - 6540-S @ $3.50 persgft
Layout - Staggered
42
Grout Color - Mapei: Warm Gray #9.3 ;
Tile;
43
Install 1,228s ft underla ment throughout entire condo - approx. sVft. @ $2.10 per s ft.
q g p 9)
q�q
Tile
.%
. gY _..._ . . pp - Q . ( o
Install main floor throughout entire condo a rox. 1,228s ft. 1,350 ft + 10 h waste @ $5.75
r
per sgft, for installation of plank
-';
- Material - HF: Cypress Mist - 9"x 48" - 6540-S @ $3.50 per sgft
- Layout - Staggered
44
Grout Color - Mapei: Warm Gray#93
Tile
Install kitchen cacsplash - approX. 45sgft
Material allowance
Layout - "
45
Grout Color - T TRD
Tile
S3 : Tile: Master Bathroom
¢
Mud shower .
.. _. ...
-wall
Tile
ran (....-. u )
Install shower wall the a rox. lUOs ft. includes 10 /o waste
pp g
Material - ]WT.- Linea Series - White Plane -12"x 24" @ $5.40 per sgft
Layout - Subway
r
- Grout Color - Mapei: Avalanche #38
Install bullnose
Tilei
{�
-
Material -Schluter: Chrome to match the plumbing fixtures
-
J
Tile _
Install wet shower floor in shower approx. 20 sgft.
Material - [WT. Atlas Series - 3"x 3" Mosaic - White Bright
Layout - Straight
49
Grout Color - Mapei: Avalanche #38
Tile
Install niche
j 50
Location controls
Tile
Install floating shower seat
j
51 Location - Below slidebar
Tile'
52 Install threshold - Marble to match the the
Tile.
- .. _ ... .
Install baseboard approx. 40Lft
53 Material - Will be fabricated out of thetloor the
Tile
-
84
'rile: Guest Bathroom
1-4
' Mud shower pan
Tile
$2,500.00,
$350.00
$490.00
$2,579.00I
$4,725.00 i
$900.i}o
$80,00:
$540.00
$360.00
$300.00
$85.00
$350.00
$80.00
$360.00
$80.00
Initials - -__ Island Kitchen and Bath . pg. 2
-Install -shower -wall tile approx. 100sgft. (includes 10% waste)
- Material - iWT: Linea Series - White Plane -12"x 24" @ $5.40 persgft
r� Layout Subway
Grout Color - Mopei: Avalanche #38
Install bullnose
Material - Schluter: Chrome to match the plumbing fixtures
install wet shower floor in shower approx. 20 sgft.
X- Material - IWT: Atlas Series - 3"x 3"Mosoic - White Bright
" -Layout -Straight
57 -Grout Color -Mapei:Avalanche #38
Install niche
58 ! - Location - Above shower controls
install floating shower seat
59 Location - Below slidebar
60 " install threshold - Marble to match the tile
Tile $540.001
Tile
install baseboard approx. 40Lft
61 Material -Will be fabricated out of then floor- We 'file
55 Cabinetry .. Hardware - Counter -tops
Install kitchen and desk cabinetry
Material - Weliborn Premier.Series - Hancock Full Overlay in Glacier- - Soft -close features -
Classic drawer fronts - 36" uppers - Low -profile Crown and under cabinet molding.
* Note * Cabinetry pricing is based on the original signed 2020 designs and any changes that are
62 made may affect the pricing (+/-)•
_
install kitchen cabinetry hardware
63 Material HR: Elements Naples Chrome Pulls
Install master bath cabinetry
- Material - Wellborn Prernier.Series - Hancock Full Overlay in Glacier - Soft -close features -
Classic drawer fronts - Drip tray -
* Note * Cabinetry pricing is based on the original signed 2020 designs and any changes made may
64 aftct the pricing of the cabinets.
Install master bath cabinetry hardware
65 - Material - HR: Elements Naples Chrome Pulls
Instal] guest ath cabinetry
- Material - Wellborn Premier Series . Hancock Full Overlay in Glacier - Soft -close features
Classic drawer fronts - Drip tray
* Note * Cabinetry pricing is based on the original signed 2020 designs and any changes made may
66 affect the pricing of the cabinets.
Install guest bath cabinetry hardware
67 - Material - HR: Elements Naples Chrome Pulls
Install countertops in kitchen w/12" overhang at the peninsula - master and guest bathroom
/4" backsplash @ $37 per sgft. for fabrication - four (4) sink cutouts @ $150 each
Material - Emerstone: Borghini Fantasy 3cm - Three (3) slabs
68 Fdge
S6 Plumbing: Kitchen - Main
Install kitchen sink
l V9 , - Material Chef series single bowl undermount stainiess steel sink - Chef-Z105
Install kitchen faucet
I'°0 Material - Moen Align one -handle high arc pulldown kitchen faucet in Chrome -7565
Install kitchen garbage disposal with push button to the left of the faucet
71 Material - Disposal - 73134A - Push-button - STS-SO
Install washer and dryer - change valve box
S'7 ; Piumbing: Master Bath
Install vanity sink - quantity two (2)
,3 Material - Undermount rectangle - White
Install vanity faucet- quantity two (2)
-Material -Two (2) Moen Voss two -handle widespread faucet in Chrome - T6905 -requires a
4Moen widespread Mpact valve - 9000 Plum-
install shower pan with slope kit Plum
11
Installshower-valve--
--Material - Moen Posiaemp valve - 2520 �.
Location - /�R'�1', on -site, with the Project Manager Plum
Initials - Island Kitchen and Bath
$1,850.00
*I
I
$360.00'
$300.00
$85.00
$350.00
$80.00
$360.00
$17,500.00
$500.00
*! $4,200.00
*' $80.00
*
$1,945.00
*; $50.00'
$5,484.00 $4,776.00
Plum
$475.00-
Plum
$360.00'
Plum
$245.00
Plum
$250.00
Plum _ $250.00
$700.001'
$160.00 j
$150.00
pg. 3
Install shower valve trim
Material - Moen Voss Posi-temp valve/shower trim in Chrome - T2691
1Install handshower w/slidebar
- Material - Moen single function handshower w/slidebar in Chrome - 366BEP - requires a drop
elbow - A725
Location - Opposite the shower controls
Install new bathroom toilet
` - Material - Kohler Highline Comfort Height Elongated Bowl in White - K-3658-00 - with
coordinating soft -close lid K4636-0
58 Plumbing: Guest Bath
Install vanity sink - quantity one (1)
P - Material - Undermount rectangle - White
Install vanity faucet - quantity one (1)
81 - Material -Moen Voss single handle faucet in Chrome - 6903
4 Install shower pan with slope kit
Install shower v_ . - alve
Material - M e Posi-temp valve - 2520
Location - on -site with the Project Manager
Install shower valve trim
- Material - Moen Voss Posi-temp valve/shower trim in Chrome - T2691
Install handshower w/slidebar
- Material - Moen single function handshower w/slidebar in Chrome - 3668EP - requires a drop
elbow - A725
r Location - Opposite the shower controls
f j install new bathroom toilet
Material - Kohler Highline Comfort Height Elongated Bowl in White - K-3658-00 - with
,6 coordinating soft -close lid - K4636.0
59 Electrical: Main
Update electrical panel to current Ft. Bldg. Code - Arc fault breakers
Wire new switches and plugs throughout condo - Dbcor White
"I Install eight(B) LED recessed lights throughout the kitchen @ $145 each - Warm White
"90 "Install eight (8) LED recessed lights throughout the living room @ $145 each - Warm White
Sim Electrical: Master &. Master Bath
Install live 15) LED recessed lights -Three (3) over the vanity - Two (2) in the shower @ $145
91 each - Warm White
92 Install new whisper quiet exhai ;t fan in the bathroom
S11 Electrical: Guest & Guest Bath
,' Install four (4) LED recessed lights- Two (2) over the vanity - Two (2) in the shower @ $145
93 each - Warm White
94 h.stall new whisper quiet exhaust fan in the bathroom
jS12 Glass - Mirrors -
Plum
$150.00
Plum
$260.00
Plum
$375.00
Plum
$125.00
Plum $230.00
Plum $80.00
Plum
Plum
Plum
Plum
Elect
Elect
Elect
lilect
Elect
Elect
Elect
Elect
Install bathroom mirror in the master bath
- Material - TBD project manager will confirm with the homeowner - Full mirror from tower to
95 tower
Glass
Install frameless shower doors: Master Bath (material, fabrication and installation)
Material - Clear Glass - One (I) swing panel - One (1) fixed panel - Chrome hardware to match
j 96 !the plumbing -fixtures- Glass
Install bathroom mirror in the guest bath
97 - Material - Supplied by the homeowner Glass
Install frameless shower doors: Guest Bath (material, fabrication and installation)
li - Material - Clear Glass - One (1) swing panel - One (1) fixed panel -Chrome hardware to match
$150.00
$150.00
$260.00
$375.00
$2,000.00
$1,050.00
$1,160.00
$1,160.00
$725.00
$250.00
$580.00
$250.00
SBO
$1,450.00
SBO
93 ithe plumbing fixtures
Glass
$1,450.00
� S13 � 'trim
Install closets systems
99 Layouts - TBD confirmed between the project manager and the homeowner
TBD
TBD
100 Relocate kitchen. sprinklers
TBD
TBD
101 I Install 5 1/4" base molding throughout entire condo approx. 240Lft
$1,080.00
$1,080,00
102 I Install 5 1/4" crown molding throughout entire condo - approx. 260
$1,170.00
$1,170.00
Initials - _ Island kitchen and Bath
pg. 4
install three (3) 2-panel pocket doors @ $700 each -One (1) for the master bedroom -One (1)
103 for the master closet - One (1) for the master bathroom $600.00 $1,500.00
104 Install one (1) 2-panel swing door @. $350 each -One 1 for the guest bathroom
105 Install two (2) 2-panel bi-fold doors @ $350 each - Two (2) for the front closet $350.00 $350.00
FInstall door h 0ware -
106 Material /� ,fie+ , 'a
Install ceding fans in bedrooms/living room --
- Material - Supplied by the homeowner
* Homeowner will have ceiling fans shipped to the IKB showroom a copy of the spec's are to be
107 provided to the showroom as well * * SBO
-
nthree (3) TV mounts - one (t) in living room, one (1) in the guest and one (1) in the
master bedroom pillar
nlstall
*Homeowner will have the TV mounts shipped to the 1KB showroom * SBO
S.14 I
Additional Items
109
110 IKB Labor (*)
file labor (Tile)
Balcony: $736 - Main Floor, $7,061 - Master shower wall: $1,950 - Guest Bath shower wall:
111 $1,950-Backsplash:$1,066
112 Knockdown ceilings
Plumbing labor allowance (Plum)
i 1 Electrical labor allowance (Elect)
Painter (labor & material)
- Ceilings and trim - Flrt White
115 Walls -Sherwin Williams 4 ,bllowance for one (1) color
1 116 Drywall (Kitchen, Master bath, and Guest bath area only)
117 Construction Clean Up
TOTAL LABOR / MATERIAL ALLOWANCE
GRAND PROJECT ALLOWANCE
$15,500.00
$12,763.00
$2,900.00
$5,900.00
$5,900.00
$4,500.00
$4,000.00
$400.00
$62,897.00 $66,775.00
$129,672.00
Deposits: Countertop Deposit: $4,776 - Project Deposit; $48,959 - Total Deposits: $53,735
Draw #1 due once demo & framing is complete: $15,190
Draw #2 due once drywall is hung: $15,190
Draw #3 due once main floor tile is installed: $15,190
Draw# 4 once shower wall tile is installed :$15,190
Draw #5 due once counter is templated: $12,190
Final Payment due upon completion: Remaining balance
Commencement: ASAP (Sooner if we get the permit)
Completion: 4 Months from date permit is issued and we start
PAYMENT TERMS AND CONDITIONS
1.) Deposit of counter -top material & cabinetry paid in full plus 25% of the project. A deposit check, payable to Island Kitchen and Bath, is required
for a project: to be scheduled. Credit Cards are NOT accepted. Deposit checks will not be cashed until the project is about to commence.
2.) Draws will be collected as needed to complete the project. if the client refuses to pay a draw, the project will be halted until payment is
collected.
3.) Full payment of open balance within 3 days of completion of the project.
TERMS AND CONDITIONS
The prices represented are based on project and product average costs. Prices may vary once project and product measurements, details, and
selections are made by client.
ISLAND KITCHEN AND BATH will execute all work according to the Florida Building Code and is licensed in the state of Florida and is in good
standing. Time spent by the owners on the project is not a billable item. All work will be accordance with the scope of work detailed within the
contract.
Due to unforeseeable conditions inside walls, behind cabinets, etc.., additional cost may occur during construction for issues such as mold, and
existing plumbing/ electrical not being safe or code compliant. These additional costs are NOT included in any contract pricing and will be dealt
with as needed. This contract does NOT account for product defects or product backorder. These issues may affect the project timeline and will be
dealt with as needed.
Initials - Island Kitchen and Bath pg. 5
Any changes requested by the client, after the original contract is signed, will result in a change order. Change orders will affect the project
timeline and are an additional cost to the original contract pricing. A change order will result in a separate fee of $100 per change order, in addition
to the total cost of the Change Order. Change Orders must be signed, and paid immediately and separately from the original contract pricing.
All selections must be made at the time of the contract, unless otherwise stated, such as, To Be Decided (TBD) or Supplied by Owner (SBO). If
there is not a selection stated, TBD, or SBO then we cannot promise the price written within the contract.
It is the client's responsibility to provide all additional information that may be needed for the project. Such as, appliance specifications, all SBO
material, etc.. If any incorrect information is provided by the client, Island Kitchen and Bath is NOT responsible for any additional cost or time that
may occur from this error.
Insurance Agent: 4 Corners Insurance -Stuart --- License Holder: Justin Thiery ---- License Number: CBC 1259508
THANK YOU FOR YOUR BUSINESS!
Client Signature $ Sigti�fure
Date///Ad Date I'��"
Initials - Island Kitchen and Bath pg. 6