Loading...
HomeMy WebLinkAboutVeg removal permit�L UM -A NOTICE OF P a J VEGETATION REMOVAL IPOLO PERMIT EXEMPTION THE APPLICANT SHALL KEEP THIS EXEMPTION POSTED ON -SITE AT ALL TIMES DURING LAND CLEARING. Permitll: 20201171 Fee: $0.00 Building Pemlli#: 2011-0437 Date Issued 11232020 Property Owner: Maverick Boat Group, Inc. Date Expires: Upon completion of work or 11232021, whichever occurs first Contractor: RF Concrete Construction, Inc. — 772 567 3356 Parcelli 1429-501-0053 0004 Project Location: 3207 Industrial 319rStreet, Fort Pierce FL Property Size: 243 acres Pro act Description: Applicant requests an exemption for the removal of grass only associated with construction of concrete slab (Building Permit 42011-0437). Per Land Development Code 6 00 04 this activity qualifies for an exemption. Field Notes: 1. HABITAT'. a. Uplands: Commercial b. Wetlands: None observed by staff. Please note this does not constitute a state or federal jurisdictional determination and all formal wetland delineations must be obtained from appropriate state and/or federal agencies. 2. WILDLIFE'. None observed. 3. SIGNIFICANT ARCHAEOLOGICAL OR HISTORIC FINDINGS None Identified. Mitigation: No mitigation is required, as no native vegetation is to be removed. Exemption #20201171 provides authorization for the removal of press only. No native vegetation Is permitted to be removed at this time. Conditions of Issuance: The following minimum standards for vegetation protection shall be applied to areas of vegetation designated to be preserved (Land Development Code Section 60005 C). A barrier shall be placed and maintained around the tree perimeter to form a continuous boundary as specified below. • Vegetation protection barricades shall be placed at minimum distance of either ten (10) feet from the edge of groups of protected vegetation or from the radius of the dripline from all protected trees, whichever is greater in the event that a full 10 foot buffer cannot be provided, the applicant shall provide the maximum buffer feasible; Protective barriers or protective designations shall remain in place until completion of site construction and clearing activities; In the event that any protective barriers are removed or altered and clearing activities are conducted within an area identified for preservation, SLC ERD is authorized N directthat all land clearing and site alteration work at the site be stopped until the barriers are restored and any necessary corrective actions taken N repair or replant any vegetation removed or damaged as a result of these encroachments Preservation areas shall be maintained in their natural state, so as not N alter the water and oxygen content of the soil and impair its function; • No grade changes or excavation of any sort may be made within the barricaded areas; • No signs, permit, wires, or other attachments shall be affixed or attached N protected vegetation; and • Noequipment, including passenger vehicles, shall sparest parked, or stored or repaired within designated vegetation preservation areas. • A National Pollutant Discharge Elimination (NPDES) Permit, separate from this permit, may be required for construction activities disturbing 1 acre or more. Please visit w dep state fl us/water/stormwater/npdes or contact Jose Vega, St Lucie County Stormwatar Program Coordinator at 772 462-1668 for more information. Post Clesrina Requirements: 1. Landsosping: Landscaping shall be in compliance with the approved ERD Landscape plan. PLEASE NOTE • THIS IS HOT AN ON�LTIM • SURVEYOR TODETERYIINE IF YOUR PROPERTY ISAFFECTm OY OR LIES WITHIN A FLOODPLAIR. • LL REm THIS EY.95PTgR POSTED OILSREATALLTW ES W WRG LARDCLGWRG. • THEPROPERTY OWNER ARWR AGENtSRALL DE RESPONSIBLE EORORTAIHIRG ALLAPPLICAXESTATDEEDPAL PERMITS. rynn Swartzel Environmental Regulations Specialist