Loading...
HomeMy WebLinkAbout30 day power release 10-27-'20 12:53 FRAM- 7728787656 T-437 P0002/0006 F-818 Na Mp O��Y■ ' ® niJLU :k _ountY, Permitting Rried Adder:`-'� � e r �•s--� THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY,FOR A PEROD NOT TO QCGEED THIRTY(30)DAYS,FOR THE PURPOSE OFTESMG SYSTgN1•S ACID EQUIPMENT IN-PREPARATION FOP,A FINAL INSPECrTON. IN f 0NSWERATION OF APPROVAL OF THE REQUEST WE HfftSY ACKNOV&MGE AND A*EE AS FOLLOWS. 1. This•tanTerary power release is.mqu for tf18 abq�e Sid PCB My,Ltd there benoactuparcl of any type,"t)ther than Brat;pemiitted by wisi action during this Vmt penod. z. As wiliness by our f1g.rroWr ,s,ft har.by agri?e to•abide by-AU'leans and cofddrdons of this agmw efit, inrlUding Building•I?ivislon.Policy,which is fncorpo't herein by reffetertce. 3. All conditions.and ragreriti listied in the att9d1W document entitled"Rouiriments.fir 30 Day Power-for-Tatng"gave begirt fififllled and the preen,ise is ready for compl'rance.inspection. 4. All requests fbr art•a darWlson iieyond 30 days•mu6t•be':Made in wrung W the Building 6ffidai stOUng the rea5orf for t1 a ratlt�est. Power may be removed from the site,and/or a S'tap Work Order issued•if the F W tnspecdon has not keen approved vVltYiin 30 days. A fee of$100.00 will be required to lift the Stop Work Order. WE HERBY RELEASE-AND AGREETO HOLD HARMLE ,ST. LUM COUNTY,AND THEIR EMPLOYMS FROM ALL LIABIL117ES AMa AM-.OF ANY TYPE OF.NATt1RE WHICH MAY a�E NOW OR IN THE FUT11i�E OUT OF TIO. n. 11SACT 0 INCL,UDInl ANY DAMAGlz-'V 'N..,Ck•,..MAY B jNdU1 t)DUE TO THE i3ISCt3�1iN1 Cl`I01�f OP C .1 IN 7HE'�1.43F VIOLX ON OF TniiS 3 GREEM t)W�IEi�Silly ..._„�_ DATE WNTl AIC—M.C DATE ELEC'1 P=L CON7mcm sIGN7-'r'5.E DATE'