Loading...
HomeMy WebLinkAbout30 day power release 10 27-'20 12:53 FROM-' 7728787656, T-437 P0001/0006 F-818 PioirrlAli � �1Q1(4) ft as`r [4e Bt i ditij:&Code:R gOf a NVishin 6 Q -�kvmia.Aire IVED Fa�lr ie>cep L 34'9$� REC' TT2,.462- 165 Fa c 77244st*2- ; O C T 2 2020 ST. Lucie County, Permitting kleciu -for 30-baay'TerOottr/ Power:Rei se Dates PerrAlt bey; 2 9 ed AddMS: C6 S� THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELE=CAL POViIER TO THE ABOVE DESCRIBED PROPERTY, FOR A.P0101) NOT''TQ EXCEED THIRTY(.3p)DAYS, FOR,Tf E PURPOSE Of'TEsnNG SYSTEM AND EQUIPMENT IN PREPARATION FOR AFINAL.INSPEt~ ON. ,IN CONSIDERATION OF APPROVAL.OF THE REQUEST ft HS�EBY ACKNOWLEDGE•AND AGREE-AS FOLLOWS: 1. 7KS tagm ary power release is iAAUW ed fbr the above sled pprpoSe orb+,and thM wM be no occupancy of any type,Mer that►that permitted by ijpmVuctfon during tM time period. Z. AS witness hy our sjgnaturos,Wei heraby.agree W abldO b aft tents and conditions of this agreement, JnCJuding Building DN109n Policy,which is incarpdrated herein 15,.y reference. 3. All conditibns'and reAUremeras listed in the aM( hed document entided"Regtiirements for 30 Day Power for Testing"fiave'bag�fulfilled'and the premlte is ready for compliant a inspection. 4. All r1equests for an o t n9on beyond 30 days•must be:made in wr"tirig to the Building Offidal•stadng the reason'for the request Power maybe removed*from the site.and[dr a-Stop Wbric Order issued-if the Ffrmf lnspeWd h&S ribt bieen approved whin 30 days. A fee df$100.00 will be regifired to lift the Stop Work'order. WE HEREBY RELEASE:AND AGREE TO HOED,HARMI ASS,ST. LUQE COUNTY,AND THEIR EMPLOYEES FROM ALL LIABRAnES AND•CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE.FUTURE OUT OFTKS TRANSAC nON,INCLUDING-ANY DAMAGE'k*HICH:,--MAY BE INCURRED 0UE To THE DISCONNEMON OF EIL�C?�?,ICAL PO U IJtiI THE E1+ 1V OF V1�LAITON 01=T#II5 AGf MEND OwNtR•SIG'NATURE DATE ` CxFn1 'Cain . DATE ELECMCAL CONTRACTOR SIGNATURE DATE