Loading...
HomeMy WebLinkAboutTemite Treatment Planning &Development Services Building &Code Regulation Division O 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #:_ �2006—6l a� JOB ADDRESS: 1109-+ BUILDER/CONTRACTOR: 7 ly T S,-_,\d4f-s _6-1� PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #:JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites.in accordance with the standards of the National Pest Control Association. Square feet if area treated: 1�° Chemicals used: DOMINION 2L Percentage of solution: .05% Total gallons.used: Date of Treatment: ` O Time of Treatment: b --K-Footing - — =-� --Slab --- -- -- -- ----- -- --- - x ist Treatment ist Treatment Re-Treat Re-Treat Driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other Perimeter for Final Inspectio 1st Treatment _ Re-Treat PAUL C LU Signature of Exterminator Dat Note. There must be a completed form for each required freatrnent or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled Inspection will fail and a re inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistantjobsite posting board shall be provided to receive duplicate Treabnent Certificates as each required protective treatment is completed, providing a copy for the person the permit is Issued to and another copy for the bullding permit files The Treatment Certificate shall provide the product used,Identity of the applicator, time and date of the treatment,site location, area treated, chemical used,percent concentratlon and number of gallons used, to establish a verifiable record of protective treatment If the soil chemical barrier method for termite prevention Is used, final exterior treatmentshall be completed prior to final bullding approval. St.Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 c