Loading...
HomeMy WebLinkAboutConstruction Plan; Signl� 4 Inn I 3'-0 " 22'-0 " 3'-0 " 2'-0 " 1 /4" x 6" steel plates welded to tubes with 2 ea 10'-0 " 3/8" gr8 bolts through 81-0 plates into cabinet 2" x 2" x 1 /4" steel, - angle welded to tubes existing 6" x 6" x 0.250" wall steel tube section modulus = 10.6 inA3 min req = 9.33 inA3 \ 2" x 3" x 1 /4" steel angle welded to tubes with 2ea 3/8" gr8 bolts through angles into cabinet 5"tube into 6" tube field welded with properly sized spacer pieces grade existing 2' 0" x 6' 0" x TO" deep 3000 psi concrete embedment Note: this drawing and attached calculations apply only to the sign installed at the address shown on sheet 2. This sign conforms to the requirements of ASCE 7-95 double sided lighted signs " Travel Inn " 22' 0" sign by GloMaster Sign Co. John J. Orlando, PE 0044089 State of Florida scale: 1/4" = 1' 0" sheet 1 of 2 job 0101 G Calculations for GloMaster Sign Co., Inc. " Economy Inn " 22' 0" OAH, sign foundation and pole size calculation To be installed on existing poles and foundation at 3425 S. US#1, Ft. Pierce, FL 34982 Definition of terms: M=larger sign dimension (ft), N=smaller sign dimension (ft) Af = projected area normal to wind direction (so Cf=Force Coefficient, F = design wind force (Ibs) Gh = Gust response factor, H = mean height where an equivalent point force is applied (ft) I = importance factor, Kz = vel pressure exposure coefficient evaluation at height z Kzt = topographic factor Qz = velocity pressure evaluated at height z (psf) V = basic wind speed (mph), z = height above ground level (ft) Mw=Turning moment at base (ft-Ibs)), P=Load per post (Ibs) b=Width of concrete embedment (ft), S1=allowable soil stress (psf) D=Depth of concrete embedment (ft) Determine wind load calculation constants From ASCE 7-95, Sec. 6.5, Fig. 6-1, p. 19, V= 140 mph From ASCE 7-95, Sec. 6.4, Table 6-1, p. 16, F=QzGhCfAf Sec. 6.5, p. 17, Eq. 6-1, Qz = 0.00256KzKztV^21 Table 6-2, p.17, Category 1, 1= 0.87 Page 31, Exposure C Table 6-8, p. 33, Cf = 2 Page 34, Sec. 6.5.5, Kzt= 1 Page 34, Sec.6.6.1, G= 0.85 2. Calculate wind load and turning moments Height Hor Dim Vert Dim Af Kz Qz"G'Cf F H M (base) z (ft) (ft) (ft) (sfl (psf) (Ibs) (ft) (ft-Ibs) 0-15 8 3 24.0 0.85 37.8 908 16.0 14533 20 0.0 0.90 40.1 0 0 20 10 4 40.0 0.90 40.1 1603 20.0 32059 25 0.0 0.94 41.9 0 0 30 0.0 0.98 43.6 0 0 40 0.0 1.04 46.3 0 0 50 0.0 1.09 48.5 0 0 Total 64.0 2511 18.6 46592 3. Determine required section modulus (in"3) at base max stress = (P"(H+0.34D)"12)/section modulus max stress < allowable stress for outdoor signs, allowable stress < (0.66)(1.33)(yield strength) for ASTM A37 steel, yield strength = 36000psi required section > (P'(H+0.34D)"12)/31600 number of poles = At base, minimum section modulus = Existing poles is 6" square x 1/4" wall steel tube, section modulus = 4. Size foundation, using method presented by Dunham, pp.229 forward Definition of terms: M=overturning moment (ft - #) P=total bearing load including weight of foundation (#) e=eccentricity of resultant pressure at base (ft) L=length of footer in wind direction (ft), b=width of Tooter (ft) D=depth of Tooter (ft) p1=maximum soil pressure at full wind load (psf) L1=location of max pressure (ft) M= 23295 L= 6 b= 2 D= 3 Weight of foundation = volume 145 Ibslft^3 = 5220 Weight of sign= 4000 P= 9220 e=M/P 2.5 L1=3(L/2-e) 1.4 p1=2P/(3b(L/2-e)) 6493.3 Foundation is OK since L1 greater than 0 (does not overturn) References: Structural Engineering Handbook, Gaylord&Gaylord editors, Fourth edition, McGraw Hill, NY 1997 ASCE 7-88 Standard Building Code (SBCCI), 1997 Rev. Mechanics of Materials, Beer and Johnston, McGraw Hill, NY 1981 Foundations of Structures, Dunham, Clarence W., Second ad., McGraw Hill, NY, 1962 John J. Orlando, P.E. No. 0044089 State of Florida 2 9.33 in"3 10.60 in^3 THESE PI AN$ AND ALL PROPOSED WORK ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT MAY BE NECESSARY IN ORDER TO COMPLY VuITH AILL APPLICABLE CODES. WL? F I L E w yff--��o�6 Lt1CIE COUNTY BUILDING DIVISION REVIEWED FOR COMP161iNCE RSVIEWED BY "' DATE I- --------- PLANS AND PERMIT MUST 13EXEPT ON JOB OR NO IidSPECTION WILL BE MADE sheet 2 of 2