HomeMy WebLinkAboutCompaction rerpotPROJECT: �- C;AO
PROJECT #:d�y0 DATE:
CLIENT: ��✓*--zs G-�
WEATHER:
CONTACT:
ARRIVAL TIME: '00 %' DEPARTURE TIME:
ON SITE TIME: �Q TRAVEL TIME: a3 LAB TIME:
EQUIPMENT CHARGE: TRAVEL CHARGE: MILEAGE:
SCOPE OF FIELD WORK:
GENERAL
As requested, a Universal) Engineering Technician was present at the above referenced location for the purpose of
AT 5 1
rL.%N; i Roo Ron%
EARTHWORK
As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of Earthwork Testing for the
As requested, the technician observed the general condition of the area(s) to be tested and performed soil density test(s). All test(s) were
performed in accordance with the (nuclear -gauge / drive sleeve / sand cone) method and were found to (T not meet / pending proctor) the project
compaction requirements of % of the maximum dry density per (ASTM DI 57 / D698) (AASHTO T-180 / T-99) (with the exception of test
number(s) that failed to meet the project compaction requirements due to
49W .
c�' �d� /� /ate s�Joe
SOMEONE ENRON
CONCRETE / GROUT / MORTAR
As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of (Concrete / Grout / Mortar)
(Monitoring / Testing) for the
While on site, the technician observed the general condition of the area(s) to be tested and cast sets of (cylinders / beams / prisms /
cubes) for (compressive / flexural strength) testing. The (concrete / grout / mortar) (tested / observed) on this day was found to be in accordance with
the project plans and specifications with regard to batch time, temperature and slump'(with the exception of the concrete batch referenced by ticket
number which was found to exceed tolerance for
Room
MEN
Universal Engineering Sciences, Inc. ON SITE TIME:
820 Brevard Avenue LESS #SETSX 1 HR:
Rockledge, FL 32955 LESS # IPDS ?f X .25 HR:
RENNER
321,638,0808 phone STAND BY TIME:
321.638.0978 fax BILLING:
RENEWED
TECHNICIAN: CONTACT: