HomeMy WebLinkAboutCompaction rerpotPROJECT: �- C;AO PROJECT #:d�y0 DATE: CLIENT: ��✓*--zs G-� WEATHER: CONTACT: ARRIVAL TIME: '00 %' DEPARTURE TIME: ON SITE TIME: �Q TRAVEL TIME: a3 LAB TIME: EQUIPMENT CHARGE: TRAVEL CHARGE: MILEAGE: SCOPE OF FIELD WORK: GENERAL As requested, a Universal) Engineering Technician was present at the above referenced location for the purpose of AT 5 1 rL.%N; i Roo Ron% EARTHWORK As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of Earthwork Testing for the As requested, the technician observed the general condition of the area(s) to be tested and performed soil density test(s). All test(s) were performed in accordance with the (nuclear -gauge / drive sleeve / sand cone) method and were found to (T not meet / pending proctor) the project compaction requirements of % of the maximum dry density per (ASTM DI 57 / D698) (AASHTO T-180 / T-99) (with the exception of test number(s) that failed to meet the project compaction requirements due to 49W . c�' �d� /� /ate s�Joe SOMEONE ENRON CONCRETE / GROUT / MORTAR As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of (Concrete / Grout / Mortar) (Monitoring / Testing) for the While on site, the technician observed the general condition of the area(s) to be tested and cast sets of (cylinders / beams / prisms / cubes) for (compressive / flexural strength) testing. The (concrete / grout / mortar) (tested / observed) on this day was found to be in accordance with the project plans and specifications with regard to batch time, temperature and slump'(with the exception of the concrete batch referenced by ticket number which was found to exceed tolerance for Room MEN Universal Engineering Sciences, Inc. ON SITE TIME: 820 Brevard Avenue LESS #SETSX 1 HR: Rockledge, FL 32955 LESS # IPDS ?f X .25 HR: RENNER 321,638,0808 phone STAND BY TIME: 321.638.0978 fax BILLING: RENEWED TECHNICIAN: CONTACT: