Loading...
HomeMy WebLinkAboutcompaction testPROJECT: PROJECT #: CLIENT: CONTACT: ARRIVAL TIME: �G � ��-, ON SITE TIME: EQUIPMENT CHARGE: SCOPE OF FIELD WORK: DEPARTURE TIME: TRAVEL TIME: TRAVEL CHARGE: GENERAL WEATHER: LAB TIME: MILEAGE: As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of .rs EARTHWORK As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of Earthwork Testing for the As requested, the technician observed t`,her,general condition of the areas) to be tested and performed - soil density test(s). All tests) were performed in accordance with t (nucl�a�a�ge /drive sleeve /sand conF.) method and were found to (r�eetr"% not meet /pending proctor) the project compaction requirements of � of the maximum dry density per (ASTM D�'557 / D698) (AASHTO T-180 / T-99) (with the exception of test numbers) that failed to meet the project compaction requirements due to CONCRETE /GROUT /MORTAR As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of (Concrete /Grout /Mortar) (Monitoring /Testing) for the While on site, the technician observed the general condition of the areas) to be tested and cast sets of (cylinders /beams /prisms / cubes) for (compressive /flexural strength) testing. The (concrete /grout /mortar) (tested / 6bserved) on this day was found to be in accordance with the project plans and specifications with regard to batch time, temperature and slump (' � the exception of the concrete batch referenced by ticket number ,which was found to exceed tolerance for \ Universal Engineering Sciences, Inc. 820 Brevard Avenue Rockledge, FL 32955 321.638.0808 phone 321.638.0978 fax ON SITE TIME: �� LESS #SETS �X 1 HR: LESS # IPDS �X .25 HR: STAND BY TIME: BILLING: TECHNICIAN: � V CONTACT: