Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBuilding PlansGulf Coast Supply and MPG 5v Crimp Metal roofing FL #II651.12
21. ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5'
wood screws with self sealing washer at 12' o.c. max spacing over ASTM D
11 2) 30 lb felt underlagment installed with min. 4 aide laps and L" and
laps fastened with corrosion resistant tin caps and with 1, 5" ring shank nods
aced In oe_at`ell laps_and two �staggered Lrows 12' o.c. in field. Attach
.H.
H.
tucco on typical concrete - �¢, J�'
E77Os5/8" thick light textured EE
block construction
O'
Finish Columns with 5/8" thick x 8"w cut
5/8" thick cut coral I r * I coral finished stucco bands
finished stucco bands RIGHT E L- Ey A T I O I�l
SCALE: 1/4' - 1'-0'
Gulf Coast Supplg and MFG 5v Crimp Metal roofing FL #11451.12
26 ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c, max spacing over ASTM D
(type 2) 30 lb felt underlagment installed with min. 4 side laps and L" and
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced L o.c. at all laps end two staggered rows 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet
ELEVATION MOTES:
Gulf Coast Supplg and MPG 9v Crimp Metal roofingFL #IIL51.12
2L ga. 5v crimp metal roofing attached to plywood deck using #4 x 1.5"
wood screws with self sealing washer at 12" o.c, max spacing over ASTM D
(tgpe 2) 30 lb felt underlagment installed with min. 4 aide laps and L" and
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced L" o.c. at all Iapta and two staggered row& 12' o.c. in field. Attach
ack to trusses umna a tachment detail an this sheet
a/ W i.nu.i, c.u6 c.vi ai SLUGGo on T_gpicai concrCLC
finished stucco bands block construction
REAR ELEVATION
- Overhangs at 1'-0" unless otherwise noted on Roof Plan
- Roof pitch at 4;12 unless otherwise noted
- Any changes to this plan shall be submitted to the architect
for approval In writing prior to starting construction.
- Return ALL Stucco Bands Into Window or Door.
SCALE: 1/4' - II
Gulf Coast Supplg and MFG 5v Crimp Metal roofing FL #11651.12
2L ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5"
woad screws with self sealing washer at 12" o.c. max spacing over ASTM D
(tgpe 2) 30 lb felt underlagment installed with min. 4 side laps and L' end
laps fastened with corrosion resistant tin caps and with 1.25' ring shank nails
spaced L" o.c. at all laps and two its�gered rows 12" o.c. in field. Attach
deck to trusses using attachment deta on this sheet
/8" thick x 8"w cut
)ral finished stucco bands
1/8" Thick cut coral stucco over paper
backed wire lath nailed to substrate through
one layer of 15 lb felt using 8d nmis. Substrate
to be 19/32" CDX Plywood nailed at L" o.c.
in field and edges with 10d ring shank galvanized
nails into truss webbing.
12
12 4 SLOPE
4 SLOPS
77;
�:� .; 12" � � �� � �� � � � � : 12,E
goo" I SST .
H.
"-
1 1—
12"
2" ®®®
° ® 5/8" thick x 8"w cut ❑.: 5/8" thick x 8'°w cut
3 coral finished stucco bands 3 coral finished stucco bands I�
®® ., 5/8' thick x 8"w cut
coral finished stucco bands
01 ®
5/8" thick fight textured nIt
stucco on typical concrete
block construction
= Finished Floor -------------_ — — — — — — — — — — — — — — — — Brae Finis ad loon
-0'-4" A.F.F. 5/8" thick light textured Finish Columns with
------®--®-®------------------- 5/8" thick cut coral
stucco on typical concrete
block construction r 1 e-rS�- finished stucco bands
LEFT ELEVATION B"
FRONT ELEVATION REVIEWED FOR
SCALE: III- r-o• OMPLIANCE
SCALE:
ST. LUCIE COUNTY'
ALL CONTRACTOR WARRANTIES BEGIN WHEN THE CLOSING
OCCURS BETWEEN THE BUYER AND WYNNE BUILDING CORP.
AND WILL CONTINUE FOR ONE YEAR FROM THAT DATE
2" x 4" top plate 1I 1/2' drywall ceding on truss bottom cord
1/2" drywall on
x 4" studs at 14" o.c.
base —board 11 11 / 2' x 4" P.T. bottom plate
\ 4" concrete slab with fibermeA OR
OW #10/10 WWFI on L ail Visqueen over
clean compacted termite treated fill
Interior Non -Searing Partition
nts
PERMITTING INFORMATION (FORM 100)
I
Florida Building Code Residential: Lth Edition and ASCE i-10 for Wind Loading
Building Design ia: Enclosed Risk Category II Wind Velocitg: IL5 mph ultimate
Mean
Roof Height:Il'-i2m Rod Pitch: 4:12
t t
Internal Pressure Coeff—icient: toja
I
Subiectabilitg to damage from: Weathering: Negligible Termites: Vary Heavu
Width of Rod End Zone: V-4' Wind Speed: IL6 mph ultimate
Wind Exposure Classification: C
1
1.21 x O.L O.'12L
Adjustment factor for Exposure Height: AS demon
Load Combination: ASCE 1-10 Section 2.4 DL+LL, DL+O.LWL; OAD +O.LIDL
Components I Cladding Wind Pressure (NET) R Zone: I. +20.L/32.L pal
RZ Zone: 2.
+20.L/- 1. pot
Rod Zone: 3. +20.L/-84.0 psf
Components I Cladding Wall End Zone Width:'— ''
none:
Components I Cladding Wind Pressure (NET) ill 4. +35.8/-38.1 pot
p - Root Zone I
Wall Zone: 5. +35.8/-4i.8 pat
Wells Zone 4
Components I Cladding Wind Pressure (NET) on Garage Door: +32.0/-40.3 Pat
Shear Walls Considered for Structure? y
= Rod Zone 2
Continuous Load Path Provided? YYe�ss
Walls Zone 5
Are Components an Cladding Dew Provided? Yes
END ZONE
Minimum Sal Bearing Pressure-2 Ia, Presumptive: X 50 Test: psi
SEE RODUCT AP RO AL P IM A T P 0 ECTION Is R O E INGS
MM - Corner Zones
Rod Zara 3
ROOF LIVE LOAD: 31 pal ROOF DEAD LOAD: 10 pal
FLOOR LIVE LOAD,-*- pal PLO R DEAD LOAD: IO pot
a
JOB ADDRESS:
Gulf Coast Supply and MFG 5v Crimp Metal rooting FL #11651.12
2L ga. 5v crimp metal rooting attached to plywood deck using #9 x 1.5"
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlayment installed with min. 4 side laps and L' and
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced L" o.c. at all laps and two staggered rows 12 o.c. in field. Attach
deck to trusses using attachment detail on this sheet
Simpson HETA 20 or equal
ihu th (1
0) IOd x Ior s 1/2' each truas 12
( 24 o.c.) ortmg Max. 4 PRE-ENGINEERED TRUSSES
" wp� �'`�� at 24°o.c. TYPICAL
18101bs upiPt (sh
drawings b manufacturer)
Aluminum Drip
Edge t Fascia /
2" x L" Sub -Fascia
Kaycan full o vent vmpl sofft i
using® 1/8' ilia shank x 1.5' long
roaring nails with 3/8' die. head
produce approval -see chart 0
5/8" thick light textured
stucco on typical concrete
block construction
#5 bar Vert. w/
30" overlap cell at each filled
FLOOR PLAN.
TYPICAL NOTES: SCALE 1/4" = 1'-0
"
I. Contractor to verify ALL notes and dimensions prior to
proceeding with Work.
2. Contractor to STRICTLY enforce ALL OSHA Requirements.
S. ALL Lumber to be used as Beam, Rafters, etc... to have
a minimum 1,400 P.S.I. fiber stress.
4. No dissimilar metals to touch.
5. ALL Concrete used for slabs shall be min. 2,500 PSI concrete.
ALL Concrete used for vertical filled cells, Cont. tie beams il to
shall be 3,000 P.S.I. concrete and/or 4,000 P.S.I. grout mix
6. Drywall at ceilings shall be leveled and attached to bottom chord
of trusses with screws per FBC R-102.3.5.
1. ALL wood in contact with concrete shall be pressure treated.
8. ALL wall dimensions are nominal and not finished wall or stud dimensions.
9. ALL plumbing fixtures to be low flow.
10. Contractor to Provide Drain at water heater in accordance
with the current edition of the Florida Plumbing Code.
11. Contractor to Provide a 2'-8" wide door at one bathroom for
handicap accessibility requirements.
12. Lowest finished floor to be set by Governing Building Department
surveyor to set in field.
13. Separation between residence and garage shall be per FBC R302.6
14. Door between garage and residence shall be 1-3/4"t 20 min. rated door
Water Heater
15. Wall and Ceiling shall have a flame -spread classification of not greater than 200 per FB
16. Wall and ceiling finishes shall have a smoke -developed index of not greater than 450 per
I'll. All exposed attic insulation materials installed on attic floors shall have a critical radiant
flux not less than 0.12 watt per square centimeter. Exposed foam plastic insulation
materials exposed on the underside of the roof deck or on the attic walls shall comply
with F.B.C. R316 - see permit info box of code edition
18. Gypsum board material shall conform to ASTM C36, C-19, C415, C514, C630, C931
C` 40, C1002, C1041,0I-7i, C1118, C12-18, C1395, or C13% and shall be installed
according to the following: (FBC Ri02.3.5)
Dr wall
Thickness
Location
Orientation
Framing
Member
Max. spacing
of fasteners
Nat stung options for
installation of drywall Into
Mawmum
All
wood training members
Nails
Screws
2" x min. thickness
Ceiling
Perpendicular
24"
1"
12"
lags 1 3/8" long with 19/64" head
0.098" diameter x 1 1/4' long
annular -ringed or 5d cooler nail
/2 11
OR
Walls
IL"
g°
IL"
0.080" dia. xx 1 5/8" long with
Direction
Direction
15/64" head
OR
Ggpsum board nod 0.084' ilia.
x 15/8" with 9/32 head.
Ceiling
Perpendicular
24"
1"
12"
lags 1 5/8" long with 19/L4" head
0.098' diameter x 1 3/8" long
annular -ringed or Ld coder nail
OR
Walls
Either
IL"
8°
IG°
0.092" dia. xx 1 1/8" long with
Direction
1/4, head
OR
Ggpsum board nail 0.0915" dia.
x 11/8' with 19/44" head.
CRASH POST DETAIL
N.T.S.
34" high by 4" diameter
steel crash post. Floor
Flange with 4 - 3/8"
expansion bolts into
slab (3/8"t 50 ksi steel plate)
6"
2%" 2 /s"
0
0
2�2'
E) 2hr V
O 0
2'q" 2 h°
6"
C R302.9.1
FBC R302.9.2
In x L" P.T. Buck
block with case han
prior to door attacl
Install SGD thru buck into
block with 3/1V tap -con with
1 1/2" penetration at G" o.c. max.
from each corner and 20." o.c. max
thereafter at head per product approval
Use 3/IL" tap -con with
1 1/2" penetration at G" o.c. max.
from each corner and 20" o.c. max
thereafter at sill per product gpprc
19. ALL ceramic tile surfaces installed shall conform to ASTM A108.1 thru A108.6,
A108.1, A118.1, A118.3, A136.1 and A131.1
20. Cement, fiber -cement or glass mat gypsum backers in accordance with ASTM
C1288, C1325. OR C1118 and installed I.A.W. manufacturers recommendations shall
be used as backer for the wall tile in tub areas and wall panels in shower areas.
21, Insulation including facings such as retarders or vapor permeable members installed
within floor -ceiling assemblies, roof -ceiling assemblies, wall, crawl spaces and attics
shall have a flame spread index not to exceed 25 with an accompanying STMsmoke
E 8-4.developed index not to exceed 450 when tested in accordance with A
Insulation shall comply with F.B.C. R316.
Grade
o
P 9
XXXXXXXXXXY
R-30 blown fiberglass
in bottom chord or trusses
I/2" drgwall with smooth finish
Two rows or beam block filled with concrete
end (l) #5 bar cant. in each row. Substitute
ed precast lintel filled with concrete and (l) 95
Car cant. for bottom row over openings
#1 1/2" dr wall over I" x Purringg
strt s a� IL" o.c. with R4.1 ri-roll
insuPation on typical 8" Block walls
All drywall to be installed per FBC R102.3.1
and shall meet all pertaining ASTM codes.
Co Mortar to be Type "M" onlg proportioned per FBC RLOI.I
and Mortar Jonts shall comply with FBC R601.2.1.
Provide Dur-O-Rock at all wet areas (ex showers, tuba etc...>
Fill cell with concrete and
(U #5 bar Vert. (typical).
Max. appacing shall not exceed
Wood 46" unleaa otherwise noted
see foundation plan notes for
ass spacing at openings
4" concrete slab with fibermesh OR
L"xL" #10/10 WWM on L mil Visqueen over
clean compacted termite treated fill
- IIII III -
���=IIII,
144w x 18 Concrete rooting
--( - with (2) #5 bars cont. and #5
14° transverse bars at 48" c.c.
TYfi iCAL SECTION
Scale : 1/2" = 1'-0"
Maaonrg Beam
to /
nails
Head
fixed door
sliding door
AREA
CALCULATIONS
Living A/C
= 1446 sq'
ft.
Front Porch
= 141 sq.
ft.
Rear Porch
= 200 sq.
ft.
Garage
= 321 sq.
ft.
Total Under Roof= 2108 sq. If t.
Total Cubic Ft = 11,548
2' Writ
2
12" I MATH R
L+V-1 2„
I "
2"
we -I 2"
2" LAUNDRY 2" 3" 2" 2' AAv 2' VTR
3" aT-1 3" 8-1
2 KTICHEN 2"
2" i AV-1
3" 2"
1% er_� BATH #2
FLUMBING RISER
I" x L' P.T. Buck nailed to
block with case hardened nails
prior to door attachment .
N Masonry Well '° L�
illl19
y..':...'.!
Bottom Trac Typical Flooring
Sill Install SGD thru buck into
block with 3/14" tap -con with
Sliding D 00r Detail I penetration at (onmax.
fromom each corner and 20.' o.c. max
thereafter at Jambs per product approval Jamb
At Masonry Wall NTS
Window Schedule
Mark
Size
Rou h Open.
Window Description
PRESSURE ZONE
I.
4'-5Ya"x 5'-3ie"
54ie'x 63i4'
Single Hung
ZONE 4
2.
V-24"x 5'-3 ia"
15" x 63 it"
Single Hung
ZONE 4
3.
'-2' x 3'-2 I/2'
2`1l 38 i""
Single Hung
ZONE 4
4.
4'-Il 4'-2 %"" 1
54 %s"x 54Ya"
Single Hung
ZONE 4
ALL Windows to be aluminum windows w/ tint
and mullions per elevations.
ALL windows to withstand pressures in permit info box on sheet
ALL windows in bathrooms to be tempered
All rough opening dimensions to be verified bg contractor
with manufacturer s specs prior to construction
Door Schedule
Mark
Size
Rough Opening
Door Description
PRESSURE ZONE
A
9'-0' X 1'-0"
108" x 84'
Overhead Garage Door
ZONE 4
B
3'-0' X L'-8'
41'/4'x 83%"
Fiberglass Panel - Insuring
ZONE 4
C
L'-O" X L'-8'
14" x 81 '�,° or
Sliding Glass Door
ZONE 4
D
2'-O' X L'-8"
Solid Core - Wood - L-Panel -Bi-Fold Finished 24' x 81 %'
E
2'-L' X L'-8'
Solid Core - Wood - L-Panel
F
5'-O" X V-8"
Solid Core - Wood - L-Panel - Dr -Fold
G
2'-8' x V-8' x 1 %4"
Solid Core Wood, Steel, or Masonite Door
H
2'-8" X L'-8"
Solid Core - Wood - L-Panel
J
2'-6" X 6'-8"
Solid Core - Wood - L-Panel - Br -Fold
K
2'-8' X 6'-8'
Solid Core - Wood - L-Panel - Bi-Fold
ALL Exterior doors to withstand pressures stated in permit info
box on sheet #1
GARAGE DOOR SPECIFIED IN PRODUCT APPROVAL FORM AND SHALL
WITHSTAND THE PRESSURES STATED IN PERMIT INFO BOX ON SHEET #1
All rough opening dimensions to be verified by contractor
with manufacturers specs prior to construction
To b"ptic
O
�r
J? -V
OPTIONAL
n PATIO/SLAB
EGRESS
N
I
°
MASTER
Ur
BEDROOM
Imo
it A.F.F.
�N
Flat Ceiling
A#/1 C
Meter
O
11 Rod !'Shelf
Lr 4r,
Vanity to e i I in4Y.2„h,g
rr \J /`•s L O E
I gC
ot
W
p.
I
_
12' x 12" Concrete column /
block Pilled with concrete and
(2) #1 bars Vert. tied into
lintels above
Covered Porch
8'-O" tol9'-8" A.F.F.
Vaulteb Ceding
GR AT
ROOM
I
rl
I
�r
I N
x L" knee -wall 8'�O" to 9'-8" A.F.F-
mu counter top I Vaulted Ceiling
DINING
7e��`Xo I ROOM
I
Vanity to be
34 Y,"high
-0 3/1',
R-II setts In"ast1511
detail fbls
IZSteel Ballard bd4'2�2`xS4eaiA
Provide auto I AtAww
closer so-
L_____
I
_
I
22" _y
15P
Amp
MIMI
DEC
�n
GARAGE
EEG
I Y
O
-4" A.F.F.
°
O MT [
T
-
0
N
IV Flat Ceding
Install windows thru buck into
block with 3/I6" tap -con with
1 1/2" penetration at L' o.c. max.
from each corner and 20.° o.c. max
thereafter at ambs and 20' o.c. max.
Exterior face at head and Ell per product approval
of wall / \ Buck to be In x 4' PT
r----------------- i
I Block wall in f -J
1�garage to be
struck block
I I
I I
14'-6"
I
I A I
I I
Flat 'Ceiling
II'-6"
SECOND
BEDROOM
0
EGRESS
O_
C V E R D 12" x 12" concrete e
PORCH with concrete and (2)
into lintels
6' 2"
% V v`ilk
° _ CO E COMP
9'-O" 3'-5"
15'-101, 5'-41,
3'-4"
,12
I
in
I
block filled
•s Vert. tfal O O
5'-4"
9'-6"
to
FILE COPY
Attach buck to block wall with
1/4" dia. Eleo cone screws with min.
1 1/4' penetration at 12" o.c. max
and 4' max from each corner thru
Exterior face 2" x L" PT Buck
of wall
ones
I"x4" P.T. Buck nailed to INSTALL VULKEM BLOCK SEALANT #8 Wood screws thru jamb into buck
lock with case hardened nails ON ALL JAMB, HEADER, AND at each bingo and 15" o.c. max and
Detail a t W i n d ow S prior to window attachment SILL BLOCK PRIOR TO BUCK D et all a t D OOr prior to door attachment
INSTALLATION
NTS NTS
In Braden t Braden AIA, PA
Winne Building Corp.
Date Drawn :
Revisions :
Sheet
Architects - Planners
3-
411 S.E. Coconut Avenue
The Grand Carlton
G LEFT ARAGE
Drawwnn : bbgy:
2-
Tel : (112) 281-8258
C.C.U.
Spanish Lakes
St. Lucie County Florida
Fax : (112) 281-8283
E-mail: bradenaiaecomcast.net
Checked bg:
St_wetr+ Pl 'A4ggL aeer�nnnn%)
D.R.B.
OF 5
Comm
12-2�
B
r
.7 I lq�N_UII I Uri�N_/IIII IXV I >_%I"
I. ALL FOOTING ARE DESIGNED FOR A MINIMUM OF 2,500 PSF SOiL
BEARING CAPACITY. IF ANY SUB -SOIL, MUCK OR NON -UNIFORM
CONDITIONS EXIST, REPORT TO ARCHITECT AND OBTAIN
PROPER ENGINEERING DATA FOR DESIGN.
2. ALL SLABS AND FOOTINGS TO BE A MiNIMUM 2,500 PSI AT 28 DAYS
ALL COLUMNS, FILLED CELLS, AND BEAMS SHALL BE MIN. 3000 PSI
BE 3000 PSI OR 4,000 PSI GROUT MIX AT 28 DAYS
3. POISON SOIL AND COVER W/ 6 MIL. VISQUEEN WITHIN 24 HOURS. NO
SOIL POISONING TO BE ACCOMPLISHED OUTSIDE OF FOUNDATION.
4 GROUND FLOOR SLAB TO BE A MINIMUM 4" THICK W/ 6X6 10/10
WELDED WIRE MESH REINFORCING ON 6 MIL. POLYETHYLENE VAPOR
BARRIER ON TERMITE TREATED, CLEAN MACHINE COMPACTED FILL
(MINIMUM 415% DENSITY). LAP POLYETHYLENE 12" MINIMUM. FIBERMESH
MiX MAY BE SUBSTITUTED FOR WELDED WIRE MESH.
5. LOT TO BE CLEARED OF ALL SMALL PLANT GROWTH AND DEBRIS
BEFORE FiLL IS BROUGHT IN. FILL MATERIAL SHALL CONSIST OF
CLEAN GRANULAR SAND CONTAINING LESS THAN 10% MATERIAL
PASSING THE US STANDARD NO. 200 MESH SIEVE. PLACE
STRUCTURAL FILL IN LOOSE LAYERS OF 12" IN THICKNESS AND
COMPACT EACH LIFT TO AT LEAST 95% OF ITS MODIFIED DRY
PROCTOR VALUE.
6• GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS. BRING ANY DISCREPANCIES OR OMISSIONS TO THE
ATTENTION OF THE ARCHITECT.
-I• GARAGE FLOORS TO BE SMOOTH TROWEL FINISH (SLOPPED PER
FOUNDATION PLAN). PROVIDE 1-1/2" RECESS FOR OVERHEAD DOOR
FOUNDATiON FLAN
8. SLOPE ALL PORCH SLABS, COVERED WALK, ETC. AWAY
FROM HOUSE TO DRAINS (iF PROVIDED) PER PLANS
9. DESIGN LOADS ARE AS FOLLOWS:
ROOF (DL+LL) = 41 PSF
WIND VELOCITY = PER PERMIT INFO BOX ON SHEET #1
EXPOSURE = I
10. ALL REINFORCING STEEL SHALL BE GRADE 40, MEETING ASTM A -I(., t
A-35 SPECIFICATIONS. ALL ANCHOR TO BE A - 30-1 STEEL.
11. ALL DOWELS, SLEEVES, CONDUITS, INSERTS, BLOCKOUTS, ANCHOR
BOLTS AND FRAMES SHALL BE IN PLACE PRIOR TO POURING CONCRETE.
FOR OPENINGS AND SPECIAL FEATURES OMITTED ON THESE PLANS,
SEE ARCHITECTURAL OR MECHANICAL PLANS WHERE APPLICABLE.
12. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS:
FOOTING: 3"
BEAMS: 1-1/2"
13. LAP ALL REINFORCING STEEL A MINIMUM OF 48 BAR DIAMETERS.
14. USE STRUCTURAL GRADE WOOD WITH A MINIMUM Fb OF 1600 PSI
IS. ALL STANDARD LUMBER SHALL BE SYP WITH A MINIMUM Fb OF 1000
PSI OF NO.2 SOUTHERN PINE, UNLESS NOTED OTHERWISE.
16. ALL LUMBER IN CONTACT WITH ANY CONCRETE OR MASONRY SHALL BE
PRESSURE TREATED. FASTENERS TO HAVE MiN. G185 RATING.
1. Any changes to plans must be submitted to the architect
for approval before proceeding with construction.
2. Contractor shall be responsible for verification of all
notation and dimensions before starting construction.
3. Soil conditions assumed to be 2500 psf. Should any other conditions be
encountered, the architect shall be notified in writing for revision
4. Verify all recess thickness at showers, tile, etc....
S. Contractor to provide filled cell with concrete and 1 #5 bar vert. at 48"
o.c. max. Provide (1) filled cell on each side of openings up to 5'-11" wide.
and Provide (3) filled cells on each side of openings from 10'-0" and up
Contractor to see plans for any other condition used. Foundation walls
shall have filled cells at 24" o.c. unless otherwise noted (see section)
(a. Contractor to provide for Form Board Survey - Form Board Survey
to be provided to Truss Company prior to truss construction
1. Contractor to provide for soil test prior to construction and provide
a copy of soil test to architect for review prior to construction
8. ALL Reinforcing steel shall be grade 60, meeting ASTM A-16 and
A-35 specifications. ALL Anchors to be A-301 steel.
9. Provide a minimum of 3" concrete protection at footings and
1-1/2" concrete protection at beams for ALL reinforcing bars.
#5 bar wart. w/
30' overlap Pill cell with concrete and
t h P II d (1) #5 bar vert. (typical). Thicken edge to 8'1
SCALE: 1/4" = 1'-0"
Termite Protection for New
Construction.
Soil treatment used for subterranean termite prevention
inside the foundation perimeter shall be done after all
excavation, backfilling and compaction is complete.
If soil area is disturbed after initial chemical soil treatment
area shall be re -treated with a chemical soil treatment
including spaces boxed or framed.
Treatment must be in accordance with the rules and laws
established bg the Florida Department of Agriculture and
consumer services.
Protective sleeves around metallic pipin penetrating
concrete slab on grade floors shall not be of cellulose
containing materials and shall receive application of
termiclde in annular space between sleeve and pipe.
a sae Max spacing shall not exceed with concrete and 4" concrete stab with fibermesh OR
Wood 48" unless otherwise noted one #5 bar continuous Vxb" #10/10 WWM on 10 mil Visqueen over
Base see foundation plan notes for clean compacted termite treated Pill
spacing at openings
4" concrete slab with fibermesh OR GRADE
6"xb" #10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill °p — '' _
Grads 0D 7j-• 1 I_ Ill i
_�t� IIII i
14"w x 18"d Concrete footing
with (2) #5 bars cont. and #5
transverse bars at 48" o.c.
f I ) TYPICAL FOOTING DETAIL
_ SCALE 1/2" = 1'-O"
4" concrete slab with fibermesh OR
6"xV #10/10 WWM on 10 and Visqueen over
clean compacted termite treated fill
#5 bar Cont.
zkStep per
. � r
..: a foundation plan
d
12" x 12' concrete column
block Pilled with concrete
and (2) s1 bars vert. tied
into Imtels above
Top of rooter
16" below finished floor
#5 bars cont. bottom steel
MINK41
w
19
#5 bar cont. in curb,
Curb height
Verify based on
foundation ulan-
E
Contractor to provide
proper foundation chairs
for proper steel installation
30" min.
SCALE 1/2" = 1'-0"
F
"I
#5 bar vert. w/
30" overlap
at each filled cell
Corner
Steel Lap
nts
Fill cell with concrete and
(l) #5 bar vert. (typical).
Filled
Cell Masonry
Column With One
Max spacing shall not exceed
48" unless otherwise noted
45
From Footing
g
To Tie Beam
Wood
see foundation plan notes for
Conc. Fill To Be
3000 PSI
Base
s acin at enin s
p g °p g See Floor Plan For Location
4' concrete slab with fibermesh OR
Vxb" #10/10 WWM on 6 mil Visqueen over
patted termite treated fill t}' •§ clean comp
acted O
Single Filled Cell Column
_ NTS
14w x 18d Concrete footing
- ""9
-I with (2) #5 bars cont. and #5
transverse bars at 48" o.c.
B DETAIL
2" x V PT wood secured with
1/2"dia. x 6" expansion anchors
with 2" sq. washer at 18" o.c. overhead door track secured to wood
jamb per manufacturer's product approval
Garage Door Jamb Detail
GARAGE DOOR TO WITHSTAND PRESSURES STATED NITS
PERMIT INFO BOX ON SHEET 41. SEE PRODUCT
Filled Cell Masonry Column With One
#5 From Footing To Beam Each.
Conc. Fill To Be 3000 PSI
See Floor Plan For Location
Double Filled Cell Column
NITS
Braden t Braden AIA, PA
Architects - Planners
-411 S.E. Coconut Avenue
Tel : (112) 281-8258
Fax : (112) 281-8283
E-mail:1 B bradenaiascomcast.net
1 14'-0" 1 ' :.I 47Ni 1 20'-0" 1
:�T-�%i•if- . — e e
z p
TF
I Fl
Q Filled cell under I
girder above
24" I
Di
I
�_ I
Rear Patio/Slab
p
r J
to be poured separate u1 �I
from the house
slab.
n I
o I
,
°
N I
I Thicken footing to
24% x 14"d x 24"L I
I
I FI under Pilled cell a
under girder bearing. I 1
° O O C
L _
_ _
— — —
m
I Rear Patio/Slab to
U c
be Plush with bottom of
U
I sliding es&
Slope Ira
=u)
°I
°
I
I
I
III
I
I
I
I
FI
I
H.B. I I
I � 4" concrete slab with fiber ash OR I
° 0 4"xb" 1110/10 WWM on 6 mil V squeen over
clean compacted termite treated fill
°
I � I
I
I
nu_ o0
o A/C ° r—------- w.H I I
I #1 I 4'e Sisal Ballard
`i filled w/ Concrete ® I F\-IUis
I
FS >_ I I l=310 l I
° I o >`� I I PQ I a�y I I � is I I
I E�v I I I
`r�
I I I
�� e a FI
I a � = I L— — I
qoj I:N lo° o °I I
-;I 3A i_
o a O \
°I ry
I Uo _—_—_ _— —
® q T T T T T TMr
IF V- I ° I I I I I °
U � py C
°i x i° o O V110
CODE CO
ST. LUCK
�—
L—--------J F r— 1
1.5" Recess for ° ° — — — — — — — — —
° ° "
arage Uoor L_
3'-5" 9'-0"
12' x 12" concrete column block fills
with concrete and (2) #1 bars vert. i
mto hntals above
Wynne Building Corp.
The Grand Carlton
Spanish Lakes
St. Lucie County Florida
12
c
NO
rim y-
N
a
FOOTING
SCHEDULE
Mark
am
tan
FI
14"W
x 18"D
MONOLITHIC FOOTING
WITH
2 #5 BARS CONTINUOUS
12"W
X 12"D
MONOLITHIC FOOTING
WITH
(2) #5 BARS CONTINUOUS
30"
x 30" x 16"D
COLUMN FOOTING WITH (4)
#5 BARS EACH WAY
P
8"W
x 8"D
THICKEN SLAB EDGE
WITH
1 #5 BAR CONTINUOUS
aflwlith
'W
x 18"D
Curb at Garage
MONOLITHIC FOOTING
WITH
2 #5 BARS CONTINUOUS - CURB a O'-0'
Date Drawn Revisions : Sheet Comm #
G3-25-20
GARAGE Drawn b12 - 2 t
LEFT y:
C.C.U. 3.
Checked by:
D.R.B. OF 5
ROOF SHEETING
ATTACHMENT DETAIL
I. Minimum Nail Size = ad ring shank (min. 2.5" long)
2. Minimum Screw Size = #8 x 2"
S. Minimum Sheathing Thickness 19/32" CDX Plgwood
-4. Use nails or screws basid on presspre for roof stated
in permit info box on these pans ror zone 3
Ke
Area
Ede
Field
Fastener
six.
Pressure
Zone (
6
8d ring shank
45 psf
Zone 2
8d ring shank
16 psf
Zone 3
488
4118d
ring shank
84 0sf
** Zone 3a
6"
6"
48 wood screw
112.5 psf
** Use nails or s4rewe based on reure for r¢of stated
in permit info box on these pus$
ns for zone 3
Concrete
/ Lintel
Column
to
Verify with Plan
12"x 12"
lumn Block
Provide #5 bars with min. 48 bar
diameters overlap Into beam. Tie
Pilled cell steel into continuous
beam block steel. k-,
Provide 35 bar set in pre -cast
lintel into beam where length of
the opening calls for it.
Provide Cast-Crete
SUS-OS/OT pretestlint- -
Min. set Bearing mter -4 -
wide PT Buck
.ached per iamb
ads into fllkd ci
4" Pre -cast
Sill
Filled Call
Provide 85 bars with min. 48 bar
fiameters overlap in Pilled cell. Tie
Pilled call steel into continuous
Pooter steel.
i.
Concrete Footing
`: y;; :'.:.:,':; '_,; a. .;,.'.`.'.'L'• '�^' tees (Doter schedule
exact sizes)
DETAIL AT WINDOW OPENING iN
CBS WALL Scale: 1/2" = I'-o"
17l
N
SINGLE PLY REAR GIRDER TRUSS
Nail 2" x 4' blockinp to wart leg or
truss with IOd x 1.5 nails at 4' o c.
Install Simpson MGT into mall using
5/8" dia. threaded rod not man. 120
into met beam and (22) IOd nails into truss
R-II batts
Rebar
Rebar 48 Bar Dia.
MIn.Overlap TRUSS BLOCKING DETAIL
Lin t I Attachment AT GIRDER STRAPPING
AT CENTER BEARING POINT
NTS
1/8" thick light textured stucco Installed per
ASTM C 926 over ASTM D type 2 paper backed
wire lath nailed to substrate through one lager ofASTM D Tgpe 2 felt paper using Od nails. Substrate
to be 19/32' CDX Plywood nailed at 6" o.c. in field
and edges with IOd ring shank nails into studs.
Gulf Coast Supply and MFG Sv Crimp Metal roorint FL #11651.12
26 ga. 5v crimp metal roofing attached to plywood deck using #9 x 1.5'
wood screws with self sealing washer at 12" o.c. max spacing over ASTM D
(type 2) 30 lb felt underlagment installed with min. 4u side laps and V and
laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails
spaced 6 o.c. at all laps and two staggered row& 12" o.c. in field. Attach
deck to trusses using attachment detail on this sheet
Additional Precast Lin ad "All
u n
#5 bars Lintel Bar Clear A B
Length Length Span Bars Bars
CLEAR
2'-10" 2'-$" I'-6" 21:3 none
%L ---- A IL--- ----y
3'-6" 3'-4" 2'-2" 2,#3 none
SPe-OS/IT OPs-18/IT 8F8-10/2T
4'3'-10" 2'-1 2,43 none
4'-6" 4'-4" 3'-2" 2,93 none
5'-4" 5'-2" 41-0" 2,#3 none
5'-10" 2,#4 none
1 6'-4" 5'-4" 2 U4 none
�'-6" 7'-O" 6'-2" 2,45 none
eF16-Ib/IT W-4" 7'-10" T-O" 2,#5 none
NOTES:
I. min. coverage of ateel=l.5"
2. min. bearing required a ea. end=e" ALL reinforcing steel is grade 60.
3. standard for rernf. steel=ASTM At.15
TYPICAL LINTEL SECTION
l PRECAST CONCRETE )
LINTEL SCHEDULE
Mark
Lmtal
ize
Cast -Greta
8 1fcatwn
Rome at
Block�d
• Aboove
bottom
steel
8�
Top
Steal
Max.
os�
(PLF)
Max.
Lw
(PLF)
Maw
Load
(101
L22
2'-7
31-6"
DPe-OB/IT
—
1
85
3061
5911
1024
L31
;-g
4'-,V
ere-OD/IT
—
1
i6
2561
1363
163
145
'-S"
II
�e-OD/IT
—
I
#5
Ilo5
404
331
L60
6'-0'
V-V
spe-OD/IT
—
1
06
1238
e36
121
L60
V-se
T-6'
alce-OBAT
—
I
i6
Io5
121
934
Leo
W-Of
V-4'
�e-Ib/2T
I
1
$5
962
611
612
1.10
Y-Om
IV-64
GPO-0/2T
1
85
2
85
643
630
401
L10B
1'-O"
IC'-6"
eFK-15/2T
ONE
1
$5
2
85
533
Iles
401
LIDO
101
m-4'
OPe-6/2T
1
#3
2
$5
582
414
452
1.I006
101
m-4'
i PI&-IB/2T
ONE
1
85
2
1 i6
11
1028
452
L120
17-W
W-4'
WO-I8/2T
1
i5
2
i5
4r1
428
324
L1205
121-0'
rb'-4'
Ott-ID/2T
ONE
1
a5
2
s6
lo16
-r10
324
U40
14'-O'
S)'-4'
9FI6-1113I
ONE
1
i6
2
i6
12W
604
251
LI&O
W-Ora
11
$110e-11111
1
lK
2
$5
300
M2
1`14
LIII
I6'-o'
11
e1016-18/27
ONE
1
85
2
85
no
900
114
- ALL LINTELS SHALL BE MADE BY CAST-CRETE.
- LINTELS SHALL BE FiLLED SOLID WITH 3000 PSI CONCRETE
- REFER TO CAST-CRETE CATALOG FOR ALL INFORMATION 18EGARDING
LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE I.-OAD REQ.
REQUIREMENTS
- LINTELS OVER 14'-O" LONG ARE TO BE PRESTRESSED.
Simpson HETA 20 or equal
hurricane anchor at each truss
with (10) IOd x 1 1/2' nails -
( 24' o.c.) suppporting Max.
I8101ba. upldt
Aluminum Drip �-
Edge t Fascia
12"
2" x V Sub-Fascl
Kalcon full o vent vin ffit in I sostalled
wirq 1/8 dia shank x 13" long gals.
roofing nails with 3/8" ilia. head per
product approval -see chart sheet 81
12' x 12' concrete column
block filled urth concrete
and (2) #1 bars vart. tied-`
into lintels above
thicken edge to 8'x8"
with concrete and
one #5 bar continuous
BEYOND
To of rooter
16 below finished floor
_s
into
Aluminum Drip
Edge t Fascia
Flash and Counter
Plash
Nail ledger to
gable and truss
with (2) iOd ils
at each web nI
5/8" thick light textured
stucco on tgpical concrete
block construction
Varies - see plan
#5 bar vert. w/
30' overlap
at each Pilled cell
Rear Patio/Slab to
be Plush with bottom of
sliding door recess.
12
4
ellln
Poured Coi
concrete h
Poured Concret
concrete hiock
Concrete ,
rianuPacture
Trusses at 24' o.c.
we shop drawingsr}
by others 11
R-30 Batts
batts
Frame ceiling transitioIi
as needed using metal studs
field verify exact configuration
and sizes
\Drywall ceding
see typical section
transition insulation Detail
nts
chore Per
Spec,
lax.
Aluminum Panel
Siva per manufacturer
— See Tuhreal Stud Detail
1/8" x 3/32' Wing Nut w/
approprmte washer ands acing
per manufacturer's Details
`a
.ors•
V
� A91'
m
I
Stud Detail
Stud u/ Die Cast 2rnc NTe
Nickel Plated Wing Nut
r„•
Mush Mounted Shutter Detail
rite
Brace Gable and
with 2" x 4` SYP #2
Oft back nailed to bottom
of top chords using (2) IOd
nails at each truss
RE -ENGINEERED WOOD TRUSSES
a 24"o.c. TYPICAL
( shop drawings by manufacturer )
Brace Gable and
with 2" x 4" SYF
Oft back nailed t
or top chords usir
nails at each true
"\R-30 blown fiberglass
in bottom chord or trusses
I/2' drywall with smooth finish
Two rows of beam block Pilled with concrete
end (1) #5 bar Cont. in each row. Substitute
recast lintel Pilled with concrete and (1) #5
r cunt. for bottom row over openings
1/2" drywall over Is x furring
strips at 14' o.c. with R4.1 ri-foil
insulation on typical Be Block walls
All drywall to be installed per FBC R102.3.1
T and shall meet all pertaining ASTM codes.
W Mortar to be Type "Me only proportioned Der FBC R601.1
and Mortar joints ahall comp y with FBC R401.2.1.
Provide Dur-O-Rock at all wet areas tax. showers, tuba etc...)
C
I
a
Strap truss to wall using Simpson MGT with
5/8 111 threaded rod with min 12" embedment
into beam either wet set or in epoxy with
122) IOd nails into truss. Add blocking to
Simpson HE I A 1V
hurricane anchor at each truss
�-- (24" o.c.) supporting Max.
.ao
WA A VAN
AF
J
�f
n
JV WIA
.ii
nor
�n
1°
�
I
I
n
�
PAN
Fe
IBM
11
IQ
Fill call with concrete and O O
(1) #5 bar vert. (typical).
'Max. spacing shall not exceed
48" unless otherwise noted
see foundation plan notes for — OVERHANGS AT 1'-0" UNLESS OTHERWISE NOTED ON THIS SHEET
spacing at openings — ROOF PITCH AT 4:12 UNLESS OTHERWISE NOTED ON THIS SHEET
Step per foundation plan - 4" concrete slab with fibarmeah OR
LOW #10/10 WWM on 6 mil Vnsqueen over — TRUSS SHOP DRAWINGS TO BE PROVIDED BY MANUFACTURER
© Slope per Foundation plan °) clean compacted termite `treated PIII - ANY CHANGES TO THIS PLAN SHALL BE SUBMITTED TO T H E
ass�� 1=
14' �1
_--
"' III- 3 Tublcal SeCtlon at Front Forc
Scale
: 1/2" = I'-O"
Braden t
Braden AIA, PA
Architects
— Planners
411
S.E. Coconut Avenue
Tel :
(112) 281-8258
Fax
: (112) 281-8283
E-mail:
bradenaiascomcast.net
Stuart. FL
S499L #AACOOOOS2
FLAN
w
� X
� as
v
IQ �
.J0 4�
,_
a
0 to ui
� u
s3
O
03 OD
IQ uV,
N
S
3LIANCE
FILE COPY
ARCHITECT FOR APPROVAL IN WRITING PRIOR TO STARTING CONSTRUCTION.
ALL TRUSS TO TRUSS CONNECTIONS BY
TRUSS MANUFACTURER
ARCHITECT TO REVIEW TRUSS SHOP DRAWINGS PRIOR
TO CONSTRUCTION FOR LAYOUT AND UPLIFT VERIFICATION
CONTRACTOR TO PROVIDE FOR FORM BOARD SURVEY AND TO PROVIDE
FORM BOARD SURVEY TO TRUSS COMPANY PRIOR TO TRUSS CONSTRUCTION
W�u nne Budding Corp. Date Drawn : Revisions : Sheet
GARAGE Drawn
Drawn log:
The Grand Carlton LEFT
C.C.U.
Spanish Lakes Checked by:
St. Lucie County Florida D.R.B. OF 5
Comm
12-2,
1-2-19
PANEL
"A"
Pales
BR
Load
Wne
Description
CrC#
etas
Doxnptun
Wire
es
1
20
1.2 ks
012
Rerngaratar
I
Ref
#L
1
20
1.2 ks
#12
Clothn Wadwr
3
1
20
1.6 ks
812
Kitchen S.A.C.
5
C
Dr
810
JkU50
1
20
I.5 ka
sm
Kitchen S.A.C.
9
s
1
20
#12
Bathraas Reaepta
9
10
Ar Can
$10
—
I
20
1.2 ka
012
Duheaher
II
12
1
20
IZ ke
#12
Microswe
13
14
Air 14wda
810
5.0 km
30
2
1
16
—
#14
Gaerrd LlgWng
16
IL
I
16
#14
Ganerd Lighting
11
18
WH
$10
5.0 km
25
2
—
I
Is
—
814
Gaesrd Lighting
19
20
1
15
*14
Gennd LighLng
21
22
GDO
812
0.81 Kill
20
1
—
1
16
—
#14
Gowd Lighting
23
24
Spero
span
26
21,
Span
Spare
21
28
Spars
so"
211
30
Spare
PANEL "A" LOAD CALCULATION SHEET
Load Description
Ot .
Watts
Total(Watts)
General Lightma (3, walla ail:.Itr).........................
.Small. Appli9nca. Circuit( .................. ...........
Rana4.........................................................
Affr{aerator..................................................
Microwave ........ ........................ I....................
Drah .Washer ...................................................
Clothes .Washer ...............................................
Clothes,Drger.......................... I ..... I ...... I ... I....
Water Heater
Garage.Door.Opener.......................................
1135
3
5,205
2
1.500
3000
I
12 000
12 000
1
1 00
I 00
1
1.500
ISOO
1
1200
1200
I
1,200
1,200
1
5,000
6,000
1
4.500
4.500
I
810
810
Total Watts
35A15
First 10000 Watts 9100%
1
10,000
10,000
Remainder 25A15 940%
1
O
1o.246
Electric Heat or A/C 10.000 065%
I
10,000
10,000
Calculated Load
Watts
30,246
Voltage
240
Calculated Wattage Divided bg Voltage Total Ampa 126.02
Panel Size Required = 150 Am s
Electrical SL,mbol Legend
$ I
Seigle Pole Satoh
® 1
Recessed Can Light
Dome Pole Satch
®
Egaball Recessed
Pa
Push Button Satoh
.SS
Exhaust Fan
'8
D Outlet
Ceiling Merited Light
Special Remptacle
Wall Mounted Light
ground t circuit
Light with PdI Chan (attic)
®
Floor Dupes outlet
©
Computer Connection Jack
®
Carbon Monoxide Detector
4&
Flood Light
Thermostat
®
Electrical Panel
®
Central Yea
8
Electrical Meter
Smoke Detector
Cahng fan
®
Television Jack
®
Telephone Jack
Ac oisc
A/C Disconnect
®
I x 4 Florescent Lght
®
2 x 4 Floresmnt Lighit
®
Spedur Hook -Up
= JUNCTION BOX TO SUPPORT A PAN
O - THERMOSTAT LOCATION
B/A = BALANCED AIR
Soffit
FIELD FIELD VERIFY SERVICE LOCATION RESPECIVE TO PANEL LOCATION AND USE APPROPRIATE RISER BELOW
A/C due. A/C dice.
#2/0 AL SER Cable
(3) #I THHN Copper
With #I Grnd
2" PVC Schedule
40 conduit
2" PVC Schedule
AMP
40 conduit sleeve AMP
MCB
Into attic MC13
PANEL
AHU
PANEL
200a rated
meter can %1
200a rated
meter can n
2" PVC
schedule
rv°W'Yv
2" nai
FPL
banding
pant
2" PVC
schedule
rv'W'W
2" rial
bonding
pant
Meter
OPTIONAL
PATIO/SLAB
163 CFM
IOxIOx6
MASTER
BEDROOM
143 CFM
IO)dOxb
° S/A
CLOSE
11 I
0" I ° °
r 22" x 54"
Ate Access
150 Amp
Panel
GARAGE
r-----------------1
I I
I I
I I
I
I I
I I
I I
I I
I
I I
I I
I I
Ii1lMIMA41M."IQ
I
I
GR AT
RO M
Centi
FM on ce
K i
12°
L------f —
r 1R7A1
20k2015 st 4
1
Registere
g\fan IOxIO>> ZM
DINING
ROOM
Exhaust Duct
Thru Soffit
4" Exhaust
Duct Thru
Wall
WP GF
Install Quiet
° under disc. N
H B not shown or 0
clarity
�thru d
ATH o�fit A iC
232 CPM
12x&x1
\ SECOND
BEDROOM
1
I \ 123d2xe
�y B/A
COVERED
PORCH
ground rods ---------- I I ground rods f j�
ELECTRICAL RISER ALTERNATE SERVICE ELECT. RISER M E C� I A I `� I C A L
- Contractor shall use AL-CU Landing lugs. NTS -Contractor shall use AL-CU Landing lugs. NT8
- Contractor shall torque lugs I.A.W. - Contractor shall torque lugs I.A.W. /� _
manufacturers recommendations which manufacturers recommendations which SCALE: 114ri — 1r — Oit
shall be verified prior to construction
shall be verified prior to construction
- Venfg AIC/KIC Rating prior to ordering equipment
I
- Verify AIC/KIC Rating prior to ordering equipment
ELECTRIC NOTES:
I.
Use copper wire onlg Prom panel to devices
15.
Contractor shall guarantee all materials and workmanship
free defects for a of not less than two from
20. All equipment and panel sizes shall be verified before
The
2.
Provide and wire all requirad smoke t Carbon
of period gears
ordering. contractor shall provide circuit routings to
Monoxide detectors.
the date of acceptance or certificate of occupancg, or one
suit the job conditions.
3.
Contractor to varifg location of electrical
gear from closing sale of house.
service and provider.
Correction of defects shall be completed without additional
21. Furnish and install all fixtures as called for on the plans
4.
ALL bath and kitchen receptacles to be GFCI
protected.
charge and shall include replacements or repair of ang
or as selected bg others.
S.
ALL exterior outlets to be WP/GFCI protected,
other phase of installation that may have been damaged.
A.
Recessed cons to be installed per NFPA requirements.
16.
it is not the intent of these plans to show everg minor detail
22• All racewage and pipes placed in or through ang concrete
1.
Temper resistant AFCI receptacles are required in
of construction. The contractor shall Furnish and Install
slab shall be spaced a minimum of three diameters of the
ALL roomc
all items for a complete electrical sgstem and provide all
largest conduit or pipe from any other service.
S.
9.
A/C Return Air Balance Must comp) w/ FBC RMIL02
ArC Rsfrrg�vg lines that are run 'Ehru slabs must be
the requirements necessarg for the equipment to be placed in
proper working order.
23. All exposed wire below 9'-I" shall be installed 1n metal EMT
P
a saved in
11.
All work shall be done in accordance with the N.E.C. and
conduit.
10.
ALL A/C Equipment shall complg with energg calculation
shall coca I with all local codes and ordinances, and shall
P g
24. Dr er Vents to be Installed per
^I
II.
All work shall be performed b a licensed electrical
P g
meet all stWndard requirements of the local electric utlhtg
FEFC RMI502
12.
contractor, the completed sgstem shall be fullyoperative.
Contractor for
and telephone company.
shall pail all fees, permits, testing. and
blower
13.
Ins including testing where required.
All work shall be coordinated trades to
18.
The electrical sgstem shall be completelg and effectively
with other avoid
grounded a# required bg the latest edition of the N.E.C.
interference with the progress of construction.
14.
All required insurance shall be provided for protection
19.
All material shall be new and shall bear underwriters'
against the public habilitg and propertg damage for the
labels where applicable.
LAYOUT
Braden t
Braden AIA, PA
Architects - Planners
411
S.E. Coconut Avenue
Tel
(112) 281-8258
Fax :
(112) 281-8283
E—mail:
bradenaiascomcast.net
Meter
O
I
w
MASTER
BEDROOM
CLO
OPTIONAL
PATIO/SLAB
i
overed Porc�'-\
wP GFCI l t
1
\ 1
I
Smoke / Carbon G R AT
Monoxide Detector R O M
Combo
® s I
� I
I
I
I
I
I �I
I ® II
I II
I II
I II
I I DINING
GFCI
I_ FC
--� ROOM
I ` '
GFCf GFCI �\ I
II KITCHEN —I1P
L— — — — — --
/24" 1 3'-2" 3'-2" Hines F
/ C.M. Detector
TI
onlyy per FBC
®.,� R314.3
D
GF
42" GFCI
— W.H.
j i A —th as JJ ` L
150 AN i Oanat�
Panel \ peptinal loeatron
Pull chain
\ light in attic
42" GFCI
GARAGE
II Garage
Door
Opener
r----------------- I
I 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
ELECTRICAL FLAN
I L
F A
entet
ut-NI 11\SECO90
B9DROON
Total Attic Space = 2124 sq. ft.
Venting Ratio 1/150 = 14.16 sq, ft. required
Provide A Continuous Vented Soffit
Whne Building Corp.
The Grand Carlton
Spamish Lakes
St. Lucie County Florida
i\ PB
(f
y WP GFCI
I —I `COBO rRCH
PC I
SCALE: 1/4" = 1'-0"
Post Light With � o
-1 Photo call I f
Date Drawn Revisions
3-25-20
GARAGE
LEFT Drawn by:
C.C.U.
Checked bg:
D.R.B.
Exhaust Duct
Thru Soffit
a Wire For
Front Post
Light
FILE COPY
Shoat Comm #
12-2b
� 1 �
OF 5
Braden ♦Braden,/ 1 P1
AL
� � � #AAC000032
RECEIVE;
Nov 0520
PeT'iting Depa
417 Coconut Ave. Stuart, FL 34996 4o (772) 287-8258 St. ��ce courn ye
x EED FOR
St. Lucre County Building Dept. CODE COMPLIANCE
ST LUCIE COUNT(
Wynne Development
Date:
Address: a.e
Permit -QjiTA 1
To whom it mag concern,
This detail applies to the insulation in
the ends of the vaulted ceilings.
If you have any questions please feel
free to call me at 112-281-8258
R-19 bat
Since ly
Braden t� Braden AIA PA
nt
FILE COPY
Trusses at 24" o.c.
see shop drawings bg others
11'rame ceding transll
as needed using met
field verif" exact configuration
and sizess
CeIIIn transltlo D
—30 Batts
—19 batts
call ceiling
see typical section