HomeMy WebLinkAboutProducts Review; Premium Plus Skirting I
Flow!:MXVIaaeast t *Y/S61aO14 11:22 16,46t9 a,4041006
b �: f `
---E
Drawer A i 0 s o
RVentilation:PIEOlulyPLSARIN
i
Us . 0 ,
nUmngoreiguy Igig N + Center Vent 8.4 sq. i0a. I panel
Solid0P';ane .040" a Available Co#o s
White I
9i Center'Ven Panel .040"':'' i• ,
l Grey i
I Top Front Tim
Tan
.f TO galck ` i p T im -.059 .; Clay
9; Bottom.Trim .047 Sand
I E
' V ntilatiom
Center Vent 4.9 sq. Wft. of panel r
Avai able Colors t A .
Vinyls irting
solid Panel 35
Whiterented Panel 35't
Grey a
Tan ,� i.y • Tv Front Trim .)50
i �
Clay • op Back Trim . . 43°
Sand _
• Bottom Trim
Trim i� Co parfsir n: Pre'MNM Plus Eagle
,
�FrontRy ai4 I .OS$"
.050d MOTE:Top Back trim f0t
Back Rail .054% .04r Premium Plus and Eagle
Botto,r Chang .047" ,04T Trim Kilear the same
Top Front Trim IiVidth 4.725" 4.360" dimensions:
Upper leg .5W1 .5501
The resort many installers use Premium Pl4s Trim KIM with Eagle Panel is because it' HEAVIER,
and,in brass whi�re blow out is a problem, Premium Plu�offers more rigid protection sga�inse blow-out,
800- 945 -4440
. � I caaas ea o ewr�
i
99/Z0 39Vd 1 iod3a 3WOH 31ISOW 0i3L9L9b£98 9b�L9 bZOZ/6Z/L0
I
7'
Be
MOUNT B 01% RAIL
1. Ground preparation.Prepare the ground so that it is smooth,free
of loose clumps, clods or protruding obstacles. Guard against
uneven settling of` wwly excavated ground by mounting the
bottom rail on treated(2"x2")lumber:
2. Mark the ground location directly below the outside,bottom edge
of the home.Use a level or plumb bob to determine this location
w at each corner.
3. Snap a chalk line or stretch a nylon string between each corner to
guide the bottom rail.
4. Position the bottom rail with the back leg toward the inside of the
FA1 chalk line perimeter.
5. Drive ground spikes every 19 inches.Two sets oflaoles are provided
�. in the bottom rail.They are located inside the charnel,and on the
back leg.Ground spikes may be driven in either hole at intervals of
ATUCH BACK RAIL 19 inches.
6. Installation on concrete.Use a N4"masonry nag.You may also
1. Determine a place for mounting.Place bottom edge of back rail drill a hole Fax a 3/16"molly screw and plastic sleeve.(Nail and
just below i>otto>sx edge of the Home.This location must offer solid screw materials are available at most Jaatdware stores.)
support for attaching and wind load pressure for parcels and Ails. To install around comer,refer to Step E.
2. Keep the back rail straight and level.Snap a chalk luxe around the
home to guide the top edge of the back rail,
3. Correct ec rewing or nailing method for back rail:Start on the back
side of the home,Position screws oar trails in the center of the slot.
Screw/nail to allow£ar 4 clearance of 1116" from the back rail
surface.Now.avoid tightly scrtawing or nailing back rail.A 1/16" '
clearance allows for normal expansion and contraction with
temperature change.Place a mew or nail in every other slot.
4. Provide a 1f2" gap between each back rail section for normal
thermal egansion.
To install around comer,refer to Step E.
PASO A:
INEUME EL RIEL DE APOYO
1. betermiae un lugar pars el montaie.Coloque el borde inferior del
rrel'de apoyo justo abajo del horde inferior do la casa. Esta .
ubicaci6n debe o£recer un apoyo fume que permit clavar los Asks
y soportae la preside por cargos de viento on los paneles.
a. lldatatenga deXecho el tier do soporte y a rival.Marque una lines �� � Be
con el cordel catizado airededor de la casa pars guiar eJ borde
superior del err de rs apoyo. MQNTAX DEL IIEL INFERIOR
3. M6todo coxxecaa pa cravat rl tier de apoyo:Cotnience en la parse Ftepare el piso de man
l Preparaci6n del piss de sierra. manna quo est€
posterior de la casa.Coloque los clavos en el Centro de Is ranuxa
pars clavos.Introduzcalos tlavos ydeje una halgara tie 1116"desde uniforme,sin rocas sueltas,terrones ni obstaculos que sobremigan
la superFtcie del riel do apoyo.Nota:No clave muy ajustadamente del per'•Pwre a la instalacibn contra el asentamiento no uniforme
of riel de apoyo. Una h4gura de 1116"con la cabem del clavo eaxpisos recien excavados,montando e1 fiel inferior an unapim de
permidii el espacio sulisiente pars absorber la expansion y madera tratada(2"x 2").
Corrtracci&nonnales resultantes de Jos cambios de temperature. 2• Marque la ubicad6n en el piso directamente aba o del borde
Colotlue los clavos en ranuras altemn. .inferior extern de la casa. Use un nivel o una plonada para
determinar esta ubicacidn era cada es ulna.
4. Ikje un espacio de 1/2"antra coda secci6n de tier de apoyo Para q
tenet en cuenta la expansion termica normal. 3. Marque una Ifnea con eJ corder enti'zado o coloque una cuerds de
Fora instalar el producto almdedor de las esquines,consulte el paso E. nal6n entre calla esquka pare gout el xtel de apoyo.
4. Coloque d riel de apoyo con lapats de respaldohacia el interior del
perirnetro mucado por la Linea de tiza.
S. Introduzca los clavos gruesos en e1 piso a coda 19 pulgadas.En el
O1R01—.? fii01A1�1lLOIlA01�T J.RT,—.i. fPII.F—F��—fMplR—T. a[ur.z,d/�r�.u>sT�.�—W�Nd ?�;fiPl �T..-1.01—T.0
rA inferior se proporcionan dos conjuntos de agujeros.I stos se
encuentran dentto del canal, era la pate de soporte. Los clavos
gruesas para el piso se pueden clavor a traves de cudRuiera de los
agujeros a una distancia de 19 pu%adas entte si.
6. Instala&n en pkos de cone to. Use un clavo de 3/4" pars
mamposteda. Aef mismo se puede taladzar an aplero Para un
tomillo do 3116"tipo Molly can onda.plastica.(Los matcriales de
davos y los tomillos estan disponibles en la mayo& de las
ferreter(as).
Para instdar el producto*ededor de In esqui n s,consulte el gasp E.
STEP Q
PIANAL INSTALLATION
1. D%inning 24"away fronts the lowest corner of the home,measure
£mm the Swund up to MAX'above the bottom edge of the back
rail,of the temperature is below 40%with frozen ground,measure •..
to T above the back rA edge.) .
2. Measurements on sloping ground should be taken every 16"(width
of panel).
3. Cut the bottom of each panel to angle with the ground.Each cut
panel section should aliga90°to the bottom edge of the home.Use
aviation snips or a power saw(with a fine toothed saw blade turned
backwards)for cutting.
4. Punch lock tabs every 4"along the top and bottom edge of cut
panel sections (or outside portion of each panel face for 13"
VariBest). A, Malco (SL-8) Snap Lock flinch tool is
recommended. Consult your sklrfing supplier for obtaining this
tool.Tabs are to be positioned outward to catch on the hooked
edge of the rods.
5. Interlock panels and insert into the bottoms rail.Begin with,the
fast panel inserted into the bottom rail.Lock tabs should snap past
the hooked edge of the bottom rail.Insert next panel section into
the interlock hooks along the vertical edge of the panels.Seat each �S
panel securely into the boom rail. Repeat interlocking panels,
forming about a 12-foot section.Resume panel cut and interlock
method.
To install.around corner,refer to Step E. PASO Q
iNSTALAWN DE LOS MILES
1. Com=wdo a 24"de la esquina inferior mas b*do la can,mida
desde la superficie del piso haste 11/2"arriba del borde in for del
rw de opoyo.(Si la temperatura ambience durance la instdad6n es
inferior a los 40T y el piso est4- congclado,mida hasta 3"arriba del
borde del riel de apo),o).
2. Las medicion a en pisos con desnivel deben hacerse a cads 16"
(ancho del panel).
3. Corte Is parse inferior de cads panel en&%do aegn el dcsnivel del
piso.Cad&w46n de panel cortado debe estar a escus*&(9(r)con
el borde inferior de Is ana.Use gems de hojalatero o una sierra
eldctrica(con una h*de come de diente Emo eolocada al revel)
par&cornr los paneles.
4. Perfore las lengaetas de rierre cads 4"a to largo del borde superior
e inferiorde las seeciones depmdo cortadw.Semcomia da el use
de una punzonadora de mano Mateo(SL-S)Snap Lock Punch.
Consulte con su proveedor de cencfas sabre c6mo obtener esta
her miens.Las Ienetas deben colocerse ha&afuem a fin de
power eng=har el horde de gvcbo de Ins rieles.
oniT.tJ1e1T9trP..T 1W-1.111W 77.:0 Q 1.AM-TO
5. .Enganche los panelcs c inbvddacalos eat el riel inferior.
Comienoe con el p6mer panel introducido en el riel ��
inferior.Ln leng,etas de derre&ben enganchwe Rasta
mis ally del borde con gancho del rief de apoyo.Intraduzea cDRNER INSTAL.LAmON
la siguiente saccibn de panel en Ios ganchoo de I. 'Top hack rail—Make a r'vertical slit from the top.Top
enclavarniento a to Iargo del borde vertical de los panels. interlock hook should be completely Cut tbaaugh-Notch
Asiente cads panel firrnemente an el riel in£eriax RaP1 a al 45'on bottom curved leg.
errclavamiento de los panels hasta forma%una section ire 2. Bottom rail — hlot& the back portion with snips, as
apmtudmadanaente 12 pies.Reanude d come do Ios panics y illustrated.Bend around a corner and ameh to the ground.
et atmetodo de enclav"Wento. I panels—C>it panel to proper height.DewrixOne point of
Para ittstatar el producto en Ise esquinas,consulte el pw E. corner bend;bend over a table edge, fcximing a uniform
angle.
4. Top fmmntrail—iNwh at both the top and bottom books of
the front rail,as allustra 4Bend around the corner and.fit
into the intexlods vurtla the top back rail.Refer to Step D.
FOUR PRE MMHED 'SDP FMff
~-� RAILS ARE INCLUD90 IN TRIM PAK
D PASO � OR pRODUC�
II�SYALA
1. p%superior de apoyo—Haga un corte vertical de V de&
SMP Di laparte superior.El gancho superior de enclavanriento debe
WMRLOCK FROM RAIL cottarse wmpletarueote,Haga una mumm a V en la pata
WM4 BACK RAIL Cutvada inferior.
I. Start.snapping one end of the lxont top rail into the back 2. Riel inferior— Corte la pordi m posterior con tijeras de
top rail, crew* the interlock. Push the front top rail hojalatero segdn Be mUeM en la ilustraci3n. Mblelo
upward, its entire length until the front top rail is alrededor de una esgtuaa y clavelo al pim
coapletely lttterlod ed with the back rail. 3, paneles—Corte e1 pent a la apron.spropiada.Determine el
2. Overlap V each top rail section, potato de dobla doblec1 panel sobrc elborde de una mesa,
To install around corner,rek r to Step E, Para format un fingdo recto.
4. Riel frontal superior—Corte los Panrhos superior a inferior
���� �i del riel frontal,�0ilust[a eta�ftgttra;We la pieta
alrededor de la esquina y ettOrtchela en d enJavamiento
ENCLAYAMIEM DEL RIEL con d rid superior de apoya.
FRowrAL Cow EL RIEL DE APOYO Conndteel Paso D.
1. Comience engaachando un ooemo dd riot frontal superior IN EL CONJUWO TRIM PAID SE
on el rid superior de spoyo,pa%a formar el mecanismo de .I,R� �
encfavamiento. Empule el rief superior de apayo Dacia INCLUM
arriba en rode su longitud beta que el riel fmnW superior SUPERIORES FRONTALES YA
este completarnente enganchado an el riel de apoyo. CO OS.
2. Tiraslaps T'cada secci6rt del riel supeei=
Para insralar eI pmducto en,las esquiaas,consuke el Faso E.
. .o%nn ?mnek a r j nr r cm��_�C52—IAA�d—T auar z,���r�u�z��WOf33 EE�6l� 5L L0—.G�