HomeMy WebLinkAboutCRUZ-PERMIT DOCUMENTSArneriGas is pleased to offer the following proposal for your consideration:
Anthony
Customer Name �.
8306 Salemo rd
Street
Fort Pierce
City, state, Tip Code
Brian Pearl
Sales Representative
Fort Pierce
District Locar-on
772465-7886
Telephone
rsescnpbon of work: Set 250 aboveground tank left side rear of house 10 ft from AC. Run gas line to exisbng house stub
Stove and 40 gallon WH
Any issues with currents stem will be extra if need to be brought up to code.
Tank must be 10 ft from source of ignition and 10 ft from house and pro lines.
ni rnntih
r]P4erinfinn
Unit Cost Total
100
Propane -_-_
2,29
S229.00
1
250 Gallon propane tank
1025
S1,025 00
10
112 Copper
8
$80 00
2
Regulators
75
S150 00
1
Service Dispatch
69.99
$69 99
1
shut off
20
S20 00
1
Set and anchor tank on blocks
525
S525 00
1
Gas hook ups
16999
$169 99
7 00%
$158 83
250 00
5
TAX
Permit
se i—,—.-i -to,mnai Wow ITOTAL COST
$2,677 81
Ail prices are exausrre uE ai'r aPl---
ALL WORK SHALL BE PERFORMED ACCORDING TO FEDERAL, STATE AND LOCAL REQUIREMENTS.
Ail prices are based on a standard installation unforeseen circumstances such as poor soil condmon, premature installation of concrete, landscapu+g.
sheetroo etc_ may result in increased costs Change orders must be approved prior to instaitation and are subject to approval by the authority having
1unsd C --n AmeriGas will not be responsible for damage to unmarked lines (sprinkler, water, electric etc.
Attachments:
Na, 11 /23/2020
Accepted by:
Date
Submitted by:
This proposal is valid for 30 days from the date submitted.
Bnan Pearl
Date I it2012020
A-n*woo
A,- Awa v COMPOY
# .W t
Corrugated stainless steel tubing (CSST) gas pipbg systems will be bonded
in accordance with Section G2411.1 (310) of theFlorida Building Code and
NFPA 54.
Underground gas piping will be installed at a miriinum- depth of 12 inches
below grade in accordance with Section G2415.12 (404.12) of the Florida
Building Code and NFPA 58.
a Polyethylene pipe will be installed in accordance with 6.11.4 of NFPA 58
and the Florida Building- Code.
■ Carbon monoxide monitors will be installed prior to inspection and will
meet all code and safety requirements of NFPA 54 and the Florida Building
Code.
ideal for use as a first stage regulator an any domestic size ASME or
DOT container in propane gas Installations requiring up to 1,500,000
BTU's per hour. The regulator is factory set to reduce container
pressure to an intermedlate pressure of approximataify 10 PSIG.
Compact design can be connected
to ailerv� valve using either
a POL adapter or a Reg() prn
• Large threaded % F NPT bonnet vent can easily be piped -away
underground installations without the need of glue flits or extra
adapters.
• Large flow orifice resists freeze ups due to water concentration In
LPG vapor.
• Design provides for good now regulation at both high and law
container pressures.
• Built In relief valve and travel stop comply with NFPA 58 over
pressure requirements.
• Incorporates %a" F.NPT downstream pressure tap for an easy
Inline check of the regulator's delivery pressure.
• Molded diaphragm provides an o-ring type seal between the body
and bonnet,
• Body and bonnet are assembled in the USA using the unique,
patented RegUlok seal system.
• Fully painted in brilliant red for complete corrosion protection.
Mounting bracket available as an accessory. part number 2302-3i.
ordering information
Body ........................ W-........ .......................................
....... Zinc
Bonnet.... .......... W................................................... I..... Steel
Spring.............................................................. ,Resilient Rubber
Seat Disc •.M ' "�_ integrated Fabric and Synthetic Rubber
1350.000
Y� r.rvr t
LV3403TRVg and derrvary Pressure 2{I9f, Waver than the regul�crserSngand dellvety pressure 20°h lower than the setlsng.
Mein um 4cv based an inlet pressure 20 PSIO higher than the regulalorsetllag
3egeProducta.cem Phw, 036) 449 T7e7 Fax r338) 448-6594 JW U
100 Rego or. P.O. enx 247 FJon, h(C 27244 USA ,,VYY1y
b
Designed to reduce first stage pressure of 5 to 20 PSIG down to
burner pressure, normally 11" w.c. heal for medium commercial
Installations. multiple cylinder Instaliallons and normal domestic
loads,
Fealwas
• Large vent helps prevent blockage and has %" F.NPT for vent
piping
• With 15 PSIG inlet pressure, regulator to designed to not pass
more than 2 PSIG with the seat disc removed.
• incorporates integral relief valves.
• Replaceable valve orl"ce and valve seat disc.
• Straight line valve closure reduces wear on sent disc.
• Unique bonnet vent profile minimizes vent freeze over when
properly installed.
• Large molded diaphragm Is extra sensitive to pressure changes.
• Suitt in pressure tap has plugged iit3° F.NP7 outlet. Plug can be
removed with a �18" hex alien wrench.
• Select brawn finish.
Mounla directly to house line piping. Eliminates need for union Joints,
elbows, and mounting brackets. [Quick and easy to install.
• Sac�rq,unldaign
'• MaU9cnaafluw bases on 10 PSIG Wet and 9' w.c. d0vary pmmw.
Bbih • yel"
Body ....................... -..........ux ...........u.....axn. • Die CastXino
Bonnet. ...... ....•........ ............................... Die Gast Zlnc
Nozzle Orifice .................................................................. Brass
Spring ......................,,W.............a...................... ....a.........., Steel
Valve Sent Disc ............................... . �..........— Resilient Rubber
Diaphragm ...............•-• Integrated Fabric and Synthelic Rubber
LISTED
W44035dries
Ilr'�au'''�'ll♦����i��
II_--III�I_III-III---IIIIII.
1A
f
111
'11 Ill
N
4'4!
MIS
IN Rg96 Or. P.O. Box 297 Sort. N4 27244 USA ww-gop?ud-bumm Phone C3S 14404"7 Fax t33al 44muO4 MK"•`�,e�R.
opyrigrd 2017 Nedonel Firs Pmtedan Asaadedan (NFPAe), Ucensed, by agreement, for tndMduer use and download on 121412017 fo ArriedGes for deslgneted user Brian Pearl. No other reprodudtion or trmnemisslon In any
farm penWtted without wdttan porm4aelon of NFPAO. For ingt9des or to report unsudwrtzed use, contaot licensing®nfpa org.
TABLE 16.10) �.mrrF } t�i , ' "
Section 16.1 • Sizing Pfpe and Tubing
Gas: I Undiluted Propane
Inlet Pressure: 10.0 psi
Pressure Drop: 1.0 psa
Specific Gravity: 1.50
ii < ;, lie tzfn� F�cttt eelz, , �StiSfage ghlPreSsi�r�j egt;Iatnr u?Fci Secpr{ Stage w ressurc)_i:r� uIrruur,
7% A. a"... 11- 1
Nomtnal:
IC c& L:
114
1h
'A
s/rs
314
1
1'/4
!�/r 2
ACR:
%
'rh
s/a
J14
V,
1 %
Vh
-
Outside.
0.375
0.500
0.625
a750
0.875
1.125
1.375
1.62S
2.125
Inside.-*
0.305
0.402
0.527
0.652
0.745
0.993
1.245
1.481
1.959
Length (fi)
Capacity to Thousands of Btu per Hour
10
513
1,060
2,150
3,760
5,330
11,400
20,500
32,300
67,400
20
352
727
1,480
21580
3,670
7,830
14,100
22,200
46,300
30
283
584
11190
2,080
2,940
6,290
I1,300
17,900
37,200
40
242
500
11020
I,780
2,520
5,380
9,690
15,300
31,900
50
215
443
901
1,570
2,230
4,770
8,590
13,500
28,200
60
194
401
816
1,430
2,020
4,320
7,780
12,300
25,600
70
179
369
751
1,310
1,860
3,980
7,160
11,300
23,500
80
166
343
699
1,220
1,730
3,700
6,660
10,500
21,900
90
156
322
655
1,150
1,630
3,470
6,250
91850
20,500
100
147
304
619
1,080
1,540
3,280
5,900
9,310
19,400
123
131
270
549
959
1,360
2,910
5,230
81250
17,200
150
118
244
497
869
1,230
2,630
4,740
7,470
15,600
175
109
225
457
799
11130
2,420
4,360
6,880
14,300
200
101
209
426
744
1,060
2=0
4,060
6,400
13,300
250
90
185 1
377
659 1
935
2.000 1
3,600
5,670
11,800
300
81
168
342
597
847
1,810
3,260
5,140
10,700
350
75
155
314
549
779
1,660
3,000
4,730
9,840
400
70
144
292
511
725
11550
2,790
4,400
9,160
450
65
135
274
480
680
1,450
Z620
4,130
8,590
500
62
127
259
453
643
1,370
2,470
3,900
9,120
550
59
121
246
430
610
1,300
2,350
3,700
7,710
600
56
115
235
410
592
1.240
2.240
3,530
7,350
650
54
ill
225
393
558
1,190
2,140
3,380
7,040
700
51
106
216
378
536
1,140
2,060
3,250
6,770
750
50 1
102
208
364
$16
1,100
1,980
3,130
6,520
800
48
99
201
351
498
1,060
1,920
3,020
6,290
850
46
96
195
340
482
1,030
1,850
2,920
6,090
900
45
93•
189
330
468
1,000
1,800
2,840
5,910
950
44
90
183
320
454
970
1,750
2,750
5,730
1,000
42
BB
176
311
442
944 1
1,700
21650
51550
(Continues)
LP -Gas Code Handbook 2017
kLV. CABLE W/
CLAMPS TO
(PULLED
4" SINGLE
1/8 GALV. CABLE
ANHDG CLAMPS CHOR l R (PULLED C
N
TIGHT)
ABOVEGROUND HORIZONTAL TANK HDLD DOWN DETAIL
GENERAL NOTES:
1. HELICAL ANCHORS SHALL HAVE: AN ALLOWABLE PULL—OUT CAPACITY AS SHOWN BELOW, ANCHORS SHALL BE INSTALLED PER
ANCH- aitk�W04 RER TO ACHIEVE STATED LOAD CAPACITY. CAPACITY VARIES WITH SOIL -TYPE. VERIFY ANCHOR CAPACITY WITH
SOI 0*1 u
tl3PL,mTa[dK +'yo1350
1?6 GAL TANK d
ig'i CwK`�RiUNDEVROtbo UTILITIES PRIOR TO STRUCTURES
INSTALLATION
FEAi111N
LOCATION OF TANK TIVE TO ADJACENT STi�UCTURES AND FEATURES ARE DEPENDENT UPON LOCAL CQDES ANa IS THE
PESPONSIBILAY OF OTHEIS.
4. THE TANK AS sHo4 .,H, b BEEN DESIGNED T4 PREVENT FL�ATION. COLLAPSE. OR LATERAL M VEMENT DUfR1NG THE BASE
FLOon E EhJT
5. WIND L-,,i.D _1GT�;,RITERIA
iED IaPy; E' URE "D"; GCpi N/A; Cf = Orb
0 COPYRIGHT 2016 —PARLEY ENGINEERIISC, LLC
AMERIGAS A N
PAGE DAT; Consulting Engineer #40111 — CA28108
0$.1' 016 ESDO N. U.S. Suite, Suite #2 Sebastian. Florido 32958
(772) 58s.sxsr: W