Loading...
HomeMy WebLinkAboutCRUZ-PERMIT DOCUMENTSArneriGas is pleased to offer the following proposal for your consideration: Anthony Customer Name �. 8306 Salemo rd Street Fort Pierce City, state, Tip Code Brian Pearl Sales Representative Fort Pierce District Locar-on 772465-7886 Telephone rsescnpbon of work: Set 250 aboveground tank left side rear of house 10 ft from AC. Run gas line to exisbng house stub Stove and 40 gallon WH Any issues with currents stem will be extra if need to be brought up to code. Tank must be 10 ft from source of ignition and 10 ft from house and pro lines. ni rnntih r]P4erinfinn Unit Cost Total 100 Propane -_-_ 2,29 S229.00 1 250 Gallon propane tank 1025 S1,025 00 10 112 Copper 8 $80 00 2 Regulators 75 S150 00 1 Service Dispatch 69.99 $69 99 1 shut off 20 S20 00 1 Set and anchor tank on blocks 525 S525 00 1 Gas hook ups 16999 $169 99 7 00% $158 83 250 00 5 TAX Permit se i—,—.-i -to,mnai Wow ITOTAL COST $2,677 81 Ail prices are exausrre uE ai'r aPl--- ALL WORK SHALL BE PERFORMED ACCORDING TO FEDERAL, STATE AND LOCAL REQUIREMENTS. Ail prices are based on a standard installation unforeseen circumstances such as poor soil condmon, premature installation of concrete, landscapu+g. sheetroo etc_ may result in increased costs Change orders must be approved prior to instaitation and are subject to approval by the authority having 1unsd C --n AmeriGas will not be responsible for damage to unmarked lines (sprinkler, water, electric etc. Attachments: Na, 11 /23/2020 Accepted by: Date Submitted by: This proposal is valid for 30 days from the date submitted. Bnan Pearl Date I it2012020 A-n*woo A,- Awa v COMPOY # .W t Corrugated stainless steel tubing (CSST) gas pipbg systems will be bonded in accordance with Section G2411.1 (310) of theFlorida Building Code and NFPA 54. Underground gas piping will be installed at a miriinum- depth of 12 inches below grade in accordance with Section G2415.12 (404.12) of the Florida Building Code and NFPA 58. a Polyethylene pipe will be installed in accordance with 6.11.4 of NFPA 58 and the Florida Building- Code. ■ Carbon monoxide monitors will be installed prior to inspection and will meet all code and safety requirements of NFPA 54 and the Florida Building Code. ideal for use as a first stage regulator an any domestic size ASME or DOT container in propane gas Installations requiring up to 1,500,000 BTU's per hour. The regulator is factory set to reduce container pressure to an intermedlate pressure of approximataify 10 PSIG. Compact design can be connected to ailerv� valve using either a POL adapter or a Reg() prn • Large threaded % F NPT bonnet vent can easily be piped -away underground installations without the need of glue flits or extra adapters. • Large flow orifice resists freeze ups due to water concentration In LPG vapor. • Design provides for good now regulation at both high and law container pressures. • Built In relief valve and travel stop comply with NFPA 58 over pressure requirements. • Incorporates %a" F.NPT downstream pressure tap for an easy Inline check of the regulator's delivery pressure. • Molded diaphragm provides an o-ring type seal between the body and bonnet, • Body and bonnet are assembled in the USA using the unique, patented RegUlok seal system. • Fully painted in brilliant red for complete corrosion protection. Mounting bracket available as an accessory. part number 2302-3i. ordering information Body ........................ W-........ ....................................... ....... Zinc Bonnet.... .......... W................................................... I..... Steel Spring.............................................................. ,Resilient Rubber Seat Disc •.M ' "�_ integrated Fabric and Synthetic Rubber 1350.000 Y� r.rvr t LV3403TRVg and derrvary Pressure 2{I9f, Waver than the regul�crserSngand dellvety pressure 20°h lower than the setlsng. Mein um 4cv based an inlet pressure 20 PSIO higher than the regulalorsetllag 3egeProducta.cem Phw, 036) 449 T7e7 Fax r338) 448-6594 JW U 100 Rego or. P.O. enx 247 FJon, h(C 27244 USA ,,VYY1y b Designed to reduce first stage pressure of 5 to 20 PSIG down to burner pressure, normally 11" w.c. heal for medium commercial Installations. multiple cylinder Instaliallons and normal domestic loads, Fealwas • Large vent helps prevent blockage and has %" F.NPT for vent piping • With 15 PSIG inlet pressure, regulator to designed to not pass more than 2 PSIG with the seat disc removed. • incorporates integral relief valves. • Replaceable valve orl"ce and valve seat disc. • Straight line valve closure reduces wear on sent disc. • Unique bonnet vent profile minimizes vent freeze over when properly installed. • Large molded diaphragm Is extra sensitive to pressure changes. • Suitt in pressure tap has plugged iit3° F.NP7 outlet. Plug can be removed with a �18" hex alien wrench. • Select brawn finish. Mounla directly to house line piping. Eliminates need for union Joints, elbows, and mounting brackets. [Quick and easy to install. • Sac�rq,unldaign '• MaU9cnaafluw bases on 10 PSIG Wet and 9' w.c. d0vary pmmw. Bbih • yel" Body ....................... -..........ux ...........u.....axn. • Die CastXino Bonnet. ...... ....•........ ............................... Die Gast Zlnc Nozzle Orifice .................................................................. Brass Spring ......................,,W.............a...................... ....a.........., Steel Valve Sent Disc ............................... . �..........— Resilient Rubber Diaphragm ...............•-• Integrated Fabric and Synthelic Rubber LISTED W44035dries Ilr'�au'''�'ll♦����i�� II_--III�I_III-III---IIIIII. 1A f 111 '11 Ill N 4'4! MIS IN Rg96 Or. P.O. Box 297 Sort. N4 27244 USA ww-gop?ud-bumm Phone C3S 14404"7 Fax t33al 44muO4 MK"•`�,e�R. opyrigrd 2017 Nedonel Firs Pmtedan Asaadedan (NFPAe), Ucensed, by agreement, for tndMduer use and download on 121412017 fo ArriedGes for deslgneted user Brian Pearl. No other reprodudtion or trmnemisslon In any farm penWtted without wdttan porm4aelon of NFPAO. For ingt9des or to report unsudwrtzed use, contaot licensing®nfpa org. TABLE 16.10) �.mrrF } t�i , ' " Section 16.1 • Sizing Pfpe and Tubing Gas: I Undiluted Propane Inlet Pressure: 10.0 psi Pressure Drop: 1.0 psa Specific Gravity: 1.50 ii < ;, lie tzfn� F�cttt eelz, , �StiSfage ghlPreSsi�r�j egt;Iatnr u?Fci Secpr{ Stage w ressurc)_i:r� uIrruur, 7% A. a"... 11- 1 Nomtnal: IC c& L: 114 1h 'A s/rs 314 1 1'/4 !�/r 2 ACR: % 'rh s/a J14 V, 1 % Vh - Outside. 0.375 0.500 0.625 a750 0.875 1.125 1.375 1.62S 2.125 Inside.-* 0.305 0.402 0.527 0.652 0.745 0.993 1.245 1.481 1.959 Length (fi) Capacity to Thousands of Btu per Hour 10 513 1,060 2,150 3,760 5,330 11,400 20,500 32,300 67,400 20 352 727 1,480 21580 3,670 7,830 14,100 22,200 46,300 30 283 584 11190 2,080 2,940 6,290 I1,300 17,900 37,200 40 242 500 11020 I,780 2,520 5,380 9,690 15,300 31,900 50 215 443 901 1,570 2,230 4,770 8,590 13,500 28,200 60 194 401 816 1,430 2,020 4,320 7,780 12,300 25,600 70 179 369 751 1,310 1,860 3,980 7,160 11,300 23,500 80 166 343 699 1,220 1,730 3,700 6,660 10,500 21,900 90 156 322 655 1,150 1,630 3,470 6,250 91850 20,500 100 147 304 619 1,080 1,540 3,280 5,900 9,310 19,400 123 131 270 549 959 1,360 2,910 5,230 81250 17,200 150 118 244 497 869 1,230 2,630 4,740 7,470 15,600 175 109 225 457 799 11130 2,420 4,360 6,880 14,300 200 101 209 426 744 1,060 2=0 4,060 6,400 13,300 250 90 185 1 377 659 1 935 2.000 1 3,600 5,670 11,800 300 81 168 342 597 847 1,810 3,260 5,140 10,700 350 75 155 314 549 779 1,660 3,000 4,730 9,840 400 70 144 292 511 725 11550 2,790 4,400 9,160 450 65 135 274 480 680 1,450 Z620 4,130 8,590 500 62 127 259 453 643 1,370 2,470 3,900 9,120 550 59 121 246 430 610 1,300 2,350 3,700 7,710 600 56 115 235 410 592 1.240 2.240 3,530 7,350 650 54 ill 225 393 558 1,190 2,140 3,380 7,040 700 51 106 216 378 536 1,140 2,060 3,250 6,770 750 50 1 102 208 364 $16 1,100 1,980 3,130 6,520 800 48 99 201 351 498 1,060 1,920 3,020 6,290 850 46 96 195 340 482 1,030 1,850 2,920 6,090 900 45 93• 189 330 468 1,000 1,800 2,840 5,910 950 44 90 183 320 454 970 1,750 2,750 5,730 1,000 42 BB 176 311 442 944 1 1,700 21650 51550 (Continues) LP -Gas Code Handbook 2017 kLV. CABLE W/ CLAMPS TO (PULLED 4" SINGLE 1/8 GALV. CABLE ANHDG CLAMPS CHOR l R (PULLED C N TIGHT) ABOVEGROUND HORIZONTAL TANK HDLD DOWN DETAIL GENERAL NOTES: 1. HELICAL ANCHORS SHALL HAVE: AN ALLOWABLE PULL—OUT CAPACITY AS SHOWN BELOW, ANCHORS SHALL BE INSTALLED PER ANCH- aitk�W04 RER TO ACHIEVE STATED LOAD CAPACITY. CAPACITY VARIES WITH SOIL -TYPE. VERIFY ANCHOR CAPACITY WITH SOI 0*1 u tl3PL,mTa[dK +'yo1350 1?6 GAL TANK d ig'i CwK`�RiUNDEVROtbo UTILITIES PRIOR TO STRUCTURES INSTALLATION FEAi111N LOCATION OF TANK TIVE TO ADJACENT STi�UCTURES AND FEATURES ARE DEPENDENT UPON LOCAL CQDES ANa IS THE PESPONSIBILAY OF OTHEIS. 4. THE TANK AS sHo4 .,H, b BEEN DESIGNED T4 PREVENT FL�ATION. COLLAPSE. OR LATERAL M VEMENT DUfR1NG THE BASE FLOon E EhJT 5. WIND L-,,i.D _1GT�;,RITERIA iED IaPy; E' URE "D"; GCpi N/A; Cf = Orb 0 COPYRIGHT 2016 —PARLEY ENGINEERIISC, LLC AMERIGAS A N PAGE DAT; Consulting Engineer #40111 — CA28108 0$.1' 016 ESDO N. U.S. Suite, Suite #2 Sebastian. Florido 32958 (772) 58s.sxsr: W