HomeMy WebLinkAboutTermite Spray C St Lucie County Inspections
. 2300 Virginia Avenue
Ft Pierce, FL 34982
OR 1D (722) 462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT#@&2QLA JOB ADDRESS 5325 San Benedetto P1, Fort Pierce, FL 34951
BUILDER Adams Homes South
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc.
PEST CONTROL LICENSE # JF0001886
We,the undersigned, hereby certify that we have pretreated the above-described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: Chemicals used: Bora-Care
Percentage of solution: .23 Total gallons used: 4
Date of treatment: 10/09/20 Time of treatment: AM
® Footing FBC 104.2.6 Certificate of Protective Treatment for prevention of termites.
g A weather resistant jobsite posting board shall be provided to receive
® 1 st Treatment duplicate Treatment Certificates as each required protective treatment is
C Re-treat completed,providing a copy for the person the poermit is iisued to and
another copy for the building permit files. The Treatment Certftcate shall
rl Slab provide the product used, identity of the applicator, time and date of the
1 st Treatment treatment, site location, area treated, chemical used,percent concentration
and number ofgallons used, to establish a verifiable record of protective
f Re-treat treatment. If the soil chemical barrier method for termite prevention is used,
f1 Driveway final exterior treatment shall be completed prior to final building approval.
r- 1 st Treatment St Lucie County requires for the final inspection for CO,a Permanent
F-Re-treat Sticker to be placed on the electrical panel box cover,listing all the
Fl Pools treatments and dates of applications.
F- 1 st Treatment
C Re-treat
11 Other Signature of exterminator
F- 1 st Treatment
r Re-treat
® Perimeter for Final Inspection
NOTE:There must be a completed form for each required treatment or re-treatment and this form must be on
the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will