HomeMy WebLinkAboutduct leak)redviously RunBrook Duct Leakage Test Report
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction, Permit
job Information
Builder: - Community: Lot.
QA
Address: *Aft)
r
City,: State: Zip: 9C 11
Duct Leakage Test Results
System 1 0 Prescriptive Method cfm25 (Total)
1 cfm25
To qualify as "substantially leak free" Qn must be Less than or equal to
System 2 cfm25 0.04 if air handler unit is installed. If air handler unit is not installed,
Qn Total must be less than or equal to 0.03. This testing method
System 3 cfm25 meets the requirements in accordance with Section R403.3.3.
Sum of any
additional systems cfm25
- MEN a Performance / ERI Method cfm25 (out or Total)
Total of all To qualify using this method, Qn must not be greater than the
systems cfm25 Iproposed duct leakage Qn specified on Form R405-2017 or R406=2017..
146 - swum r n
Total of all Total Conditioned
Q Leakage Type selected on Form Qn specified on Form R405-2014
systems Square Footage R4052017 (Energy Caic) or R406-2017 (Energy Calc) or 406-2017
KPAASS FAI L
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either individuals as defined in Section
553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes,
Testing Company
Company Name: Sustainabase Phone: 561-510-5715
I hereby verify that the above duct leakage testing results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test.
Printed Name of Tester: Frank Costagliola
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Builder: �� �y ��� Community: -�,.,,,�� � �c� Lot:
Address: '1k,Li3; �+•� ; �� Unit:
....,,
City: �J r� �� Lr` � State: � Zip: � �,+
__
A� r Lea kale Test Results Passing results must meet eli�her the Performance, Frescr/ptwe, or ��I M'ethnd
PRESCRIPTIVE METHC1n-The building or dwelling unit shall be tested and verified as hawing an air leakage rate ofnot exceeding 7 afr
changes per hour at a pressure of Q.2 inch wg. (50 pascals) fn Clirr�ate �nnes;1 and, 2,
� � PER�t?RMANCE or ERI METHOD'» The building ar dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50} values as shown qn FORM R445-2017' (Performance) or �406-2047 (E�1)r section labeled as Irrfiltrationl sub -section ACH.
ACW(5ll) specified nn Fnrm R405'-20�7-Energy Calc {P�rfarmanc�e) ar 17405-209i {E171)
CFM(50)
x 60 � � -� _
Building Volume
❑FAIL
W
yk'
ACH(50)
❑When ACH(50) is less than 3, Mechanical Ventilation
installation must be verified by building department.
ethod for calculating biai{ding volume:
(� Retrieved from architectural plans
��
Code software calculated
OField measured and calculated
Testing. Testing shall be conducted ih accordance with ANSI/RESNET/ICC 38Q and reported at a pressure or 0.2 inche w.g. (SO Pascals}. Testing
shall be conducted by either individuals a5 defined. in section 553,993(5} or (7}, Florida Statues, or individuals licensed as set forth in section
4��.1 q�(�)(f}, (g}, qr (i) nr an approved third party, A written report of the results of the tiest shall be signed by the partyconducting the test and
provided to the code offirlal, Testing shall be performed at any time after creation of all penetrations of the building thermal envelr�pe.
During testing:
1.Exterior windows and. doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping orother infiltration
tontral measures.
2C7ampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but nair sealed beyond Intended infiltration central
'measures,
3,Interior doors, if installed at the time of the test, shop be open:
4.�xterlar doors far continuous ventilation systems and heat recgvery ventilators shall be closed and sealed.
S:Heating and'coaiing systems, if installed at the time ofthe test, shell be turned off.
b:Supply and return registers, if installed at the time of the test, shall be fully open:
Company Name:
I hereby verify that the above Air Lea
Conservation requirements accordin
Signature of Tester:
Printed Name of Tester:
hone: � �l� 1 � ��Ml � �
results are in accordance with the 2017 6th Edition Florida Building Code Energy
the compliance method selected above.
Date of Test: �' �
License/Certification #:
�`� u Issuing Authority: