HomeMy WebLinkAboutTermite Treatment Mw�2,6)
St Lucie Countylnspections
2300 Virginia Avenue
Ft Pierce, FL 34982
Q (722) 462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT# J �Z- ' dZ � 4- JOB ADDRESS 3400 Bent Pine Dr, Fort Pierce,FL 34951-2968
BUILDER GHO Homes
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc.
PEST CONTROL LICENSE# JF0001886
We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean
termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 410 Chemicals used: Cypermethrin
Percentage of solution: .50% Total gallons used:
Date of treatment: 10/17/17 Time of treatment: AM
❑ Footing FBc er i 104.2.E C tficate .f o prevention or of Protective Treatment}� P termites.
❑ 1 st Treatment A weather resistant jobsite posting board shall be provided to receive
❑Re-treat duplicate Treatment Certificates as each required protective treatment is
❑ Slab completed,providing a copy for the person the poermit is iisued to and
another copy far the building permit files. The Treatment Cerificate shall
❑ 1 st Treatment provide the product used, identity of the applicator, time and date of the
❑Re-treat treatment,site location, area treated, chemical used,percent concentration
and number of gallons used, to establish a verifiable record of protective
❑ Driveway treatment. If the soil chemical barrier method for termite prevention is used,
❑ 1 st Treatment final exterior treatment shall be completed prior to final building approval.
❑Re-treat St Lucie County requires for the final inspection for CO,a Permanent
❑ Pools Sticker to be placed on the electrical panel box cover,listing all the
❑ 1st Treatment treatments and dates of applications.
❑Re-treat !
❑Other
111 st Treatment
❑Re-treat Signature of exterminator
® Perimeter for Final Inspection
NOTE. There must be a completed form for each required treatment or re-treatment and this farm must be on the
job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a
re-inspection fee charged.