Loading...
HomeMy WebLinkAboutEnergy Codeo} FORM R405-2017 y FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: WYNN THE GRAND CARLTON IMPACT Builder Name: WYNNE BUILDING COPR. Street: �_o C-A's-L Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE, FL, -Permit Number: Owner: WYNNE BUILDING CROP Jurisdiction: ST. LUCIE COUNTY Design Location: FL, Fort Pierce County: St. Lucie (Florida Climate Zone 2 ) 1. New construction.or existing New (From Plans) 9., Wall Types (1442.0 sqft.) Insulation Area 2. Single family or multiple family Single-famiiy a. Concrete Block - Int Insul, Exterior R=4.1 . 1250.00'ft2 b. Frame - Wood, Adjacent R=11.0 192.00 ft2 3.. Number of units, if multiple family 1 c. N/A R= 12 4. Number of. Bedrooms 2 d. N/A. R= ft2 5. Is this,a worst case? Yes 10. Ceiling Types (1476.0 sqft.) Insulation Area . a. Under Attic (Vented) R=30.0' 1446.00'ft2 6. Conditioned floor area above grade (ft2) 1446 b. Knee Wall (Vented) R=19.0 30.00 ft2 Conditioned floor area below grade (ft2) 0 c. N/A R= ft2 11. Ducts R ft2 7. Windows(141.3 sqft.) Description Area a. Sup: Attic, Ret: Attic, AH: Attic 6 175 a. U-Factor: Sgl, U=1.04 101.25 ft2 SHGC: SHGC=0.29 b. U-Factor: Sgl, U=1.11 40.00 ftz 12. Cooling systems kBtu/hr " Efficiency SHGC: SHGC=0.27 a. Central Unit 34.8 SEER:15.00 C. U-Factor: ' N/A ft2 SHGC: 13. Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a. Electric'Heat Pump 34.8 HSPF:8.50 SHGC: Area Weighted Average Overhang Depth: 3.832. ft., Area' Weighted Average. SHGC:. 0.284 14. Hot water systems 8. Floor Types (1445.5 sqft.) Insulation Area a. Electric Cap:50gallons a. Slab -On -Grade Edge Insulation R=0.0 1445:50 ft2 b. Conservation features EF: 0.970 b. N/A R= ft2 None c. N/A R= ft2 15. Credits Pstat Glass/Floor Area: 0.098 Total Proposed Modified Loads: 47.47 PASS Total Baseline Loads: 48.09 I hereby certify that the plans and specifications covered by Review of the plans and this calculation are in compliance with the Florida Energy specifications covered by this Code. calculation indicates compliance �,,�'► with the Florida Energy Code. PREPARED RY; Before construction is completed DATE: this building will be,inspected for compliance with Section 553.908 Lherebycertify .that this building, as designed, is in compliance Florida Statutes. with the. Florida Energy Code. OWNER/AGEN�T: BUILDING OFFICIAL: DATE:. NPR \ DATE: - Compliance requires certification by the air handier unit.manufacturer that the air -handier enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2). 4/21/202010:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - RaRes2017 FBC 6th Edition (2017) Compliant Software Pagel of 5 FORM R405-2017 INPUT SUMMARY CHECKLIST RFPnRT PROJECT Title: WYNNE THE GRAND CARL Bedrooms: 2 Address Type: Street Address Building Type: User Conditioned Area: 1446 Lot # Owner Name: WYNNE BUILDING CROP Total Stories: 1 Block/Subdivision: # of Units: 1 Worst.Case: Yes PlatBook: Builder Name: WYNNE BUILDING COPR. Rotate Angle: 180 Street: Permit Office: ST. LUCIE COUNTY Cross Ventilation: No County:. St. Lucie Jurisdiction: ST. LUCIE COUNTY Whole House Fan: No City, State, Zip: FT. PIERCE, Family Type: Single-family. FL, New/Existing: New (From Plans) Comment: CLIMATE / Design Temp Int Design Temp Heating Design Daily Temp V Design Location TMY Site 97.5 % 2.5 % Winter /Summer Degree Days Moisture Range FL, Fort Pierce FL VERO_BEACH_MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume 1 Entire House 1446 11568 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 BEDROOM 301 2408 No 0 1 1 Yes Yes Yes 2 WIC 63 504 No 0 1 No Yes. Yes 3 M.BATH 56 448 No 0 1 Yes Yes Yes 4 KITCHEN 192 1536 Yes 0 1 No Yes Yes 5 BATH 45 360 No 0 1 Yes Yes Yes 6 BEDROOM 2 204 1632 No 0 1 1 Yes Yes Yes 7 ENTRY. 55 440 No 0 1 Yes Yes Yes 8 LAUNDRY 42 336 No 0 1 Yes Yes Yes 9 GREAT/DINING 488 3904 No 0 1 Yes Yes Yes . FLOORS # Floor Type Space. Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet' 1 Slab -On -Grade Edge Insulatio BEDROOM 52 ft 0 301 ft2 _-__ 0 1. 0 2SIab-On-Grade Edge Insulatio WIC 1 ft 0 63 ft2 _-_ 0 1 0 3 Slab -On -Grade Edge Insulatio M. BATH 8 ft 0 56 ft2 _--- 0 1 0 4 Slab -On -Grade Edge Insulatio KITCHEN 1 ft 0 192 ft2 -_-_ 0 1 0 5 Slab -On -Grade Edge Insulatio BATH 5 ft 0 45 ft2 __-_ 0 1 0 6SIab-On-Grade Edge Insulatio BEDROOM 2 32.2 ft 0 203.5 ft2 -_-_ .0_ 1 0 7Slab-On-Grade Edge Insulatio ENTRY 7 ft 0 55 ft2 ---- 0 1 0 4/21/202010:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5 FORM R405-2017 INPUT SUMMARY CHECKLIST REPnRT FLOORS # Floor. Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 8 Slab -On -Grade Edge Insulatio LAUNDRY 6 ft 0 42 ft2 ____ 0 1 0 9 Slab -On -Grade Edge Insulatio GREAT/DINING 46 ft 0 488 ft2 --__ 0 1 0 ROOF / Roof Gable Roof Rad Solar SA. Emitt Emitt Deck Pitch # Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 Gable or Shed Metal 1524 ft2 240 ft2 Light N 0.6 No 0.9 No 0 18.4 ATTIC V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 Full attic Vented . 150. 1446 ft2 N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac. Truss Type 1 Under Attic (Vented) BEDROOM 30 Blown 301 ft2 0.1 Wood 2 Under Attic (Vented) WIC 30 Blown 63 ft2 0.1 Wood 3 Under Attic (Vented) M. BATH 30 Blown 56 ft2 0.1 Wood 4 Under -Attic (Vented) KITCHEN 30 Blown 192 ft2 0.1 Wood 5 Under Attic (Vented) BATH 30 Blown, 45 ft2. 0.1 Wood 6 Under Attic (Vented) BEDROOM 2 30 Blown 204 ft2 0.1 Wood 7 Under Attic (Vented) ENTRY 30 Blown 55 ft2 0.1 Wood 8 Under Attic (Vented) LAUNDRY 30 Blown 42 ft2 0.1 Wood 9 Under Attic (Vented) GREAT/DINING 30 Blown 488 ft2 0.1 Wood 10 Knee,Wall (Vented) GREAT/DINING 19 Blown 30 ft2 0.11 Wood WALLS Adjacent Cavity Width MIA Type Spacen Height Et n Area Sheathing Framing Solar Below RAW, ia Fraction AbsAr �aeieo _ 1 NE=>SW Exterior Concrete Block - Int InsuBEDROOM 4.1 10 0 8 0 80.0 ft2 0 0 0.4 0 2 SW=>NE Exterior Concrete Block - Int InsuBEDROOM 4.1 28 0 8 0 224.0 ft2 0 0 0.4 0 _'3 NW=>SE Exterior Concrete Block- Int InsuBEDROOM 4.1 14 0 8 0 112.0 ft2 0 . 0 0.4 0 _-4 SW=>NE Exterior Concrete Block - Int Insul M. BATH 4.18 0 8 0 64.0 ft2 0 0 0.4 0 5 NE=>SW Exterior Concrete Block - Int Insul BATH 4.1 5 0 8 0 40.0 ft2 0 0 0.4 0 6 NE=>SW Exterior Concrete.Block - Int InsENEDROOM 2 4.1 16 0 8 0 128.0 ft2 0. 0 0.4 0 _ 7 SE=>NW Exterior Concrete Block = Int Ins91EDROOM 2 4.1 10 0 8 0 80.0 ft2 0 0 0.4 . 0 8 S=>N- Exterior Concrete Block- Int InsENEDROOM 2 4.1 4 3 8 0 34.0 ft2 0 0 0.4 0 _ 9 SW=>NE Exterior Concrete Block - Int InsENEDROOM 2 4.1 2 0 8 0 16.0 ft2 0 0 0:4 0 10 SE=>NW Exterior Concrete Block - Int Insul ENTRY 4.1 6 0 8 0 48.0 ft2 0 0 0.4 0 11 SW=>NE Exterior Concrete Block - Int Insul ENTRY 4.1 1 0 8 0 8.0 ft2 0 0 0.4 0 12 SW=>NE Exterior Concrete Block - Int InsuiLAUNDRY 4.1 6 0 8 0 48.0 ft2: 0 0 0.4 0 13 NE=>SW Exterior Concrete Block - Int lnsiU6.REAT/DINI 4.1 26 0 8 0 208.0 ft2 0 0 0.4 0 14 NW=>SE Exterior Concrete Block- Int InsLGREAT/DINI 4.1 20 0 8 0 160.0 ft2 0 0 0.4 - 0 4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5 FORM R405-2017 INPI IT Al IfkfiUARY C1-IGrV1. IST D=Df%DT WALLS Adjacent Wall Space Cavity Width Height Ivper=t In Sheathing Framing Solar Below 15 N=>S Garage Frame - Wood KITCHEN 11 24 8 192.0 ft2 0.23 0.4 0 DOORS # Ornt Door Type Space Storms U-Value Ft Width Height In Ft In Area 1 SE=>NW Insulated ENTRY None .39 3 1 6 8 20.6 ft2 WINDOWS Orientation shown,is the entered orientation. => chan ed to Worst Case.. / Wall # Ornt ID Frame Panes NFRC Overhang U-Factor SHGC Imp Area Depth Separation Int'Shade Screening 1 NW=>SE 3 Metal 2 SW=>NE 4 Metal 3 SE=>NW 7 Metal 4 NE=>SW 13 Metal 5 NW=>SE 14 Metal Low-E Single Yes Low-E Single Yes Low-E Single Yes Low-E Single Yes Low-E Single Yes 1.04 0.29 Y 32.9 ft2. 1 ft 0 in 1.04 0.29 Y 6.9 ft2 1 ft 0 in 1.04 0.29 Y 24.0 ft2 6 ft 0 in 1.04 0.29 Y 37.5 ft2 1 ft 0 in 1.11 0.27 Y 40.0 ft2 8 ft 0 in 1 ft 5 in Drapes/blinds 1 ft 5 in None 1 ft 5 in None 1 ft 5 in None 1 ft 5 in Drapes/blinds Exterior 5 None None None Exterior 5 GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wali'Height Exposed Wall Insulation 1 315ft2 315ft2 24ft 8ft 11 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse Proposed ACH(50) .000356 1349.6 74.09 139.34 .1233 7 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ Split Singl HSPF:8.5 ' 34.8 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit/ Split Singl SEER: 15 34.8 kBtu/hr cfm 0.8 1 sys#1 HOT WATER SYSTEM #. System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.97 50 gal 60.9 gal 120 deg None 4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev, 1) - FlaRes2017 FSC 6th Edition (2017) Compliant Software Page 4 of 5 a FORM R405-2017 ANPUT SUMMARY: CHECKLIST REPORT SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # Company Name System Model # Collector Model # Area Volume FEF None None ft2 'DUCTS / . ---- Supply -- --- Return -- Air CFM 25 CFM25 HVAC # 1/ # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 Attic 6 175 ft2 Attic 65 ft2 Default Leakage Attic (Default) (Default) 1 1 - TEMPERATURES Programable Thermostat: Y Ceiling Fans: Cooling ] Jan Feb Heating f X] Jan f X� Feb,. Venting Mar Mar Apr f Apr f May. May Jun Jul f Jun f Jul Auge 4 Aug 4 Oct ' Sep E Oct NNov Nov. Dec f X� Dec [ ] Jan [ ] Feb Mar [X] Apr [ May [ Jun ( Jul [ Aug[ Se [X] Oct . Nov [ j Dec Thermostat Schedule: HERS 2066 Reference Hours Schedule Type 1 2 3 4 5 6 . 7 8 9 10 11 12 Cooling-(WD) AM PM 78 80 78 80 78 78 78 78 78 78 78 80 80 80 80 78 78 78 78 78 78 .78 78 78 Cooling (WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating (WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating (WEH) AM PM 66 68 66 68 66 68 66 66 68 68 68 68 68 68 68 68 .68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(8 Ibs/sq.ft. 0 ft2 0 ft 0.3 MASTER BEDROO Default(8 lbs/sq.% ft2 A. 0.3 WIC DeMult(8 Ibs/sq.ft. ft2 ft 0.3 MASTER BATH Default(8 Ibs/sq.ft. ft2 ft 0.3 M. BATH Default(8 lbs/sq.ft. ft2 ft 0.3 LAUDRY Default(8 Ibs/sq.ft. ftZ. ft 0.3 BEDROOM 2 Default(8.lbs%sq.ft. ft2 ft 0.3 DINING/GREAT R Default(8 lbs/sq.ft. ft2 ft 0.3 KITCHEN Default(8 lbs/sq.ft. ft2 ft 0.3 BATH Default(8 lbs/sq.ft. ft2 ft 0.3 HALL Default(8 Ibs/sq.ft.., ft2 ft 0.3 FOYER Default(8 lbs/s .ft. ft2 ft 0.3 BEDROOM-8 4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5 J' 2017,-AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATIOWINSPECTION COMPONENT CRITERIA Project Name: WYNNE THE GRAND CARLTON IMPACT Builder Name: WYNNE BUILDING COPR. Street: Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE ; FL, Permit Number: Owner: WYNNE BUILDING CROP Jurisdiction: ST. LUCIE COUNTY UJ Design Location: FL, Fort Pierce CU COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealingmaterial. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall.be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air.barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs -or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space.between window/door jambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation, maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floor's) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space -shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that.on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spa s. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall extend behind p'pung and wiring. Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. I Caulking or other adhesive sealants shall not be used to fill voids between fire gopkl#r cover Plates ;and Walls or ceilings - a. In addition, Inspection of log walls shall be' in accordance with the provisions of ICC-400. -4/21/202010:32 AM EnergyGauge® USA 6.0.02 (Rev.. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 99 The lower the Energy Performance Index, the more efficient the home. 1. New home or, addition 1. New (From Plans) 12. Ducts, location & insulation level a) Supply ducts R 6.0 2. Single-family or multiple -family 2. Single-family b) Return ducts R 6.0 3. No. of units (if multiple -family) 3. 1 c) AHU location Attic 4. Number of bedrooms 4. 2 5. Is this a worst case? (yes/no) 5. Yes 6. Conditioned floor area (sq. ft.) 6.. 1446 7. Windows, type and area a) U-factor:(weighted average) 7a. 1.060 b) Solar Heat Gain Coefficient (SHGC) 7b. 0.284. c) Area 7c. 141.3 8. Skylights a) U-factor:(weighted average) 8a. NA b) Solar Heat Gain Coefficient (SHGC) 8b. NA 9. Floor type, insulation level: a) Slab-on-grade'(R-value) 9a. 0.0 b) Wood, raised (R-value) 9b. c) Concrete, raised (R-value) 9c. 10. Wall type and insulation: A. Exterior: 1. Wood frame (Insulation R-value) 2. Masonry:(Insulation R-value) B. Adjacent: 1. Wood frame (Insulation R-value) 2. Masonry (Insulation R-value) 11. Ceiling type. and insulation level a) Under attic b) Single assembly c) Knee walls/skylight walls d) Radiant barrier installed 10A1. 10A2. 4.1 13. Cooling system: Capacity 34.8 a) Split system SEER 15.0 b) Single.package SEER c) Ground/water source SEER/COP d) Room unit/PTAC EER e) Other . 14. Heating system: Capacity 34.8 a) Split system heat pump HSPF . 8.5. .b) Single package heat pump HSPF c) Electric resistance COP d) Gas furnace, natural gas AFUE e) Gas furnace, LPG AFUE f) Other 15. Water heating system a) Electric resistance EF 0.97 b) Gas fired, natural gas EF c) Gas fired, LPG EF d) Solar system with tank EF e) Dedicated heat pump with tank EF f) Heat recovery unit HeatRec% g) Other 10131. 11.0 10132. 16. HVAC credits claimed (Performance. Method) a) Ceiling fans 11a. 30.0 b) Cross ventilation No 11 b. c) Whole house fan No 11c. 19.0 d) Multizone cooling credit 11d. No e) Multizone heating credit f) Programmable thermostat Yes *Label required by Section R303.1.3 of the Florida Buil.dirig Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy saving -features which will be installed (or exceeded):in this home before final inspection. Otherwise, a new EPL display card will be completed based on installed code compliant features. Builder Signature: Date: �1 Address of New Home: V P� I^ �� _ Ci /FL Zi : FT. PIERCE FL � �5'S ry � 4/21/202010:32:17 AM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1