Loading...
HomeMy WebLinkAboutLetter; First Floor Concrete SlabsJam-w. Consulting Enginee... September 3, 2020 Mario Arbucci Coastal Construction and Design, Inc. 850 NW Federal Highway Stuart, Fl. 34994 Re: Lot 31 Watersong, located at 4800 Watersong Way, Fort Pierce, Fl. Dear Mario, Per our conversation, the first floor concrete slabs on the above project do not require a 95% compaction and tests on the sub -grade. They are reinforced structural slabs supported on a pile and grade beam foundation, which is not depend on the soil for support. You will still need.to provide a vapor barrier and termite treatment under the slab. If you have any questions, please contact me at the below address. Sincerely, Jam _ D. Bushouse, P.E. Professional Engineer #20311 State of Florida 3300 NE 10th Terrace #24, Pompano Beach, Florida 33064 Ph®ne:(954) 956-2203 Fax: (954) 956-2204 P.O. Box 1237, Arcadia, FI®rada 34265 ILE COPY Phone: (863) 491-8242 Fax: (863) 491-824F jom@jamesbushouseinc.com