HomeMy WebLinkAboutPower Release 260- 11-16-2020 PassedGfp I Universal
Engineering
s
Sciences
Company
INSPECTION RESULTS
Inspection Date 11/16/2020 Permit No. 1910-0387
Project Century Complete
Address: 6504 Santa Clara Blvd.
Check one:
® Regular Inspection:
❑ Reinspection Date of Initial Inspection
Inspection Type Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rou h-In
Slab 127
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Pi in & Test
HW Piping & Test
Wall/ Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/ Feeder
X
Gas Piping & Test
Cond. Piping & Test
Structural
Service/ Ground
X
Storm Piping & Test
Insulation
Sheet Rock
Appliance/ Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
ui ment
Equipment
Re -inspection
Re -inspection
Reins ection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type Overhead Service
Area Inspected/Code: Power Release (260)
Inspection Results: AP -Approved AE — Approved DA- DP - Not Ready ❑
® with Exceptions Disallowed Disapproved
❑ ❑ ❑
Conditions/ Comments
1.
2.
3.
4.
5.
6.
7.
Inspector's Name klhd "AG — Lic. #: BN-4688
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924.3580 (fax)
www.teamgfa.com