Loading...
HomeMy WebLinkAboutPower Release 260- 11-16-2020 PassedGfp I Universal Engineering s Sciences Company INSPECTION RESULTS Inspection Date 11/16/2020 Permit No. 1910-0387 Project Century Complete Address: 6504 Santa Clara Blvd. Check one: ® Regular Inspection: ❑ Reinspection Date of Initial Inspection Inspection Type Requested (check): BUILDING/ STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rou h-In Slab 127 Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Pi in & Test HW Piping & Test Wall/ Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/ Feeder X Gas Piping & Test Cond. Piping & Test Structural Service/ Ground X Storm Piping & Test Insulation Sheet Rock Appliance/ Equipment Fixtures Wall & Ceiling Roofing Lighting Protection ui ment Equipment Re -inspection Re -inspection Reins ection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Overhead Service Area Inspected/Code: Power Release (260) Inspection Results: AP -Approved AE — Approved DA- DP - Not Ready ❑ ® with Exceptions Disallowed Disapproved ❑ ❑ ❑ Conditions/ Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name klhd "AG — Lic. #: BN-4688 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924.3580 (fax) www.teamgfa.com