HomeMy WebLinkAbout2020-053 - 6505 Lakeland blvd1 1A05A (1) with JC signatureThis Item baa been electronically
Javier Cisneros, P. E
;�";"°"���
`�O` Eis..FRo :
:igneeandsealedbviamerc:neres,
a •`.�
P.E. using a Digital Signature and
^/ ^/
2020.1 2.07
* _
date. Printed copies of this
8TgTEOF !ty`
AO
document are not consideredsigned
' 00' 0 5 2 2
: u C
a
and sealed and the signature must
be
- :45 :17
verifed on any electronic copies
-50'
Flectrical
panel Schedule
NO
be5crioion
roles
Trip
Volts
W NN
Conduit
Load
Peceptacle5 @ OU kW Fach
I
15
120
# 14
1 / 4''
0.48
2,
General L ightinq @ 0.12 kW Fach
I
15
120
# 14
1 / 4''
0.24
3,
GFCI @ OJ kW Each
I
15
120
# 14
1 / 4''
015
4,
FXterlor Lighting @ @12 kW Fach
I
15
120
#14
1/ 4''
036
4,
Compressor Tool
1
1 201
240
#6
3/ 4"
5 4
A
50 AMP (3reaker From Main House Panel Total 6.0
Proposed Flectrical Load Fvaluated To The Fxistirq Circuit, Panel and Service
Loads. No Upgrade is keciuired,
FI
Metal Building Wall
I 13q Others
New
50 Amp
Panel
25connect
142 FT of #6 CU Triplex
From Main Nou5e Panel
One C ) # 6 Ground In ill
Conduit To Copper Water Ripe
Or # 5 rebar To rooter
�Ocjonj
= Lighting Switch
$3 = Lighting 5witch - 3-walk
� ightinq - Wall Mount
L ightinq - Wet Dated
- J - L ightinq - Junction
GFib - i?eceptacl e - 120 V Ground Fault
b - peceptacl e -120 V
TOP Or PrOP05Fn 5LV
0 - peceptacl e - 240 V
® = receptacle - Exhaust Fab with Light
Electric Vi5er Petai
2 5ch 40 PVC Gray{
Conduit And 21Long
Sweep Flbow To riser Pole
From Fxi5ting Main Nou5e Panel
ke5idential kemodel For;
Pobert Matthews
6505 Lakeland Blvd
Fort Pierce, Florida 34951
Contractor;
Owner
4C Fngineerinq, L�C
5903 Spruce i2rive
Ft. pierce, FI 3 982
JC@4CFNGLLC'COM
c772-5192679
Javier Ci5nero5. P.F. #10844
iWo--,5
TH15 POCUMFNT 15 PpOPFIFTAVY. FOp
U5F 13Y CLIENT ANP 17F516NATF19
1;FCIPIFNT5 ONLY, OFFICIAL PLAN513Y
JAVIFP, C15NFPO5, P F MU5T HAVF 5FAL
WITH 006INAL 56NAT Pp IF 56NF17
1716ITALLY A�OVF, PpINtP COPIF5 OF
TH15 POCUMFNT APF NOT CON5MP\F17
51GNFn ANP 5FALFb ANP THE
5I6NATUP\F MU5T �F M\IFI P ON ANY
FLFCTpONIC COPIF5
pe5ign Pq: KCC
Approved 13q: JC
PZevision bate, 12/ 1/ 20
P,evision #I; Pevised Flectric Piser diagram
and added no plumbing note
C;evision bate,
P,evision #2;
C;evision bate
P'evision #3;
Pat-: 09116120
Project #: 2020-05
Flectrical
NOTE; n0 NOT 5Cq WAWIN65, USE VWITTEN PIMFN510N, ANY n15CrFPANCIF5 5HOW2 �F PrOUGNT TO THE ATTENTION OF THE PF516NFr,
A,05 / A,05