Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMIT ETREATMENTPlanning & Development Services 1 j Building & Code Regulation Division 2300 Virginia Ave 4 Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: 00 1- 0096 JOB ADDRESS: ,61'` BUILDER/CONTRACTOR: L L1 r- f d Ic PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMIT & PEST CONTROL INC. PES-r CONTROL LICENSE #: J8115775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 4 `7 Percentage of solution:.05% Date of Treatment: q o -0j"D - Footing 11t Treatment Re -Treat Dy rivewV1"' Treatment Re -Treat Other 1st Treatment Re -Treat Chemicals used: DOMINION2L Total gallons used: 'j c,, -. Time of Treatment: 10 - 3 �z Slab 15t Treatment Re -Treat Pools 1s� Treatment for � ��..;. Date Note: There must be a completed form for each required treatmek or re-beatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC 104.2.6 Cerb'ficate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to rive duplicate Treatment Certficates as each required protective treatment is completed, providing a copy for the person the penmlt is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014