HomeMy WebLinkAboutAPPROVED, Bahto 921 Jackson Way_signed contractCode Red Roofers, Inc. Main Office: 1 (844) 4 - CODERED
License #CCC1326574 1 (844) 426 - 3373
License #CRC1326582 Fax: (772) 287-7763
info@coderedroofers.com • _01 www.coderedroofers.com
04
-••
Submitted To: o M ' ICe 13 A V\ 0 Date: August 24, 2020
Address: 921 Jackson Way Phone: (772) 577-0683
City: Ft Pierce State: FL Email:
Metal Roof Proposal 1?o2 3
3
We hereby submit specifications and estimates for:
1) Complete removal of existing roofing materials down to deck.
2) Remove and discard existing non-structural gutters — not to be replaced.
3) Inspect plywood decking for damage; replace up to five (5) sheets.
Please see Wood and Labor Addendum.
4) Re -nail plywood to meet current code.
5) Installation of self -adhered underlayment (qualifies as secondary water barrier).
6) Installations of accessory metals, drip edge, valley metal, and pipe stacks.
7) Installation of .032 gauge 1" standing seam aluminum roof in standard Kynar color.
8) Includes taxes, permit fee, trash removal, clean up, dump fees, labor, and materials.
Roofing Contractor will supply a five (5) year Limited Warranty upon completion of the project.
We propose hereby to furnish material and labor — complete in accordance with the above specifications for the sum of
23 200 0 Twenly-lbree Thousand Two Hundred and xx/ 100 ----------------------------------------------------------------------
Dgllars
01P4:or ! Acid 0.44iOwti w
i+ rNkt r\ailS +0 S+ cLpJ :tand rrliti9c�fiion /, oa
Total contract price with all selected options• ----------------------------------------------- a CI 70 0
j4A�
• A Project Manager will be assigned to your job to ensure high quality work
Quoted price is a cash price includes all rebates and discounts. An additional 3.5% convenience fee will be added to payments made by
credit card. Payment draws to be made as follows: 113 on contract acceptance, 113 prior to commencement, 113 within 15 calendar days
of completion. Completion is determined as the scope of work being substantially complete and ready for final inspection. Owner
may withhold an amount up to 10% of completion draw invoice, pending resolution of Corrective Work Request Form. Owner
understands and agrees by signature below that such withholding of payment may jeopardize application of workmanship warranty,
and that inspection scheduling is not within CRR's control. Outstanding balances may accrue finance charges at the statutory rate
(currently 18% per annum).
Note: This proposal may be withdrawn by us if not accepted within thirty (30) days.
Any alteration or deviation from above specifications involving extra costs will be executed only upon written order and will become
an extra charge over above estimate. All agreements are contingent upon strikes, accidents, or delays beyond our control.
Respectfully Submitted by: Sean Perez at Code Red Roofers
Acceptance of Proposal
By signature below, owner indicates they are aware that current project scheduling is subjected to additional delays outside of Code
Red Roofers' control, including but not limited to material and labor shortages, and inclement weather. Time is of the essence in any
major project such as roofing, and Code Red Roofers will make best efforts to advance schedule dates whenever possible. The stated
prices, specifications and conditions are satisfactory and are hereby accepted. The Wood and Labor Addendum is also satisfactory
and herby accepted. Your authorjl000 do the work as specified. Payments will be made as outlined above.
(honer Signatu> d�-V Date:/ d O 7, o"
Page 1 of 1
Southeast Florida Treasure Coast Central Florida Panhandle
3341 SE Slater St 1166 Angle Rd. 700 Avenue C SE 942 Industrial Drive
Stuart, FL 34997 Fort Pierce, FL 34947 Winter Haven, FL 33880 Chipley, FL 32428
(561) 622 - 6343 (772) 287 - 2829 (863) 845 - 3120 (850) 225 - 5451