Loading...
HomeMy WebLinkAboutInspection Docs, req 30 day temp power release form 12-10-'20 15:39 FROM- 7728787656 T-621 P0002/0010 F-048 m ' • • BOW o i ', Dii pan 2 a 11Y AvO 65 FaX 772 2-6 R-eqU *f►r°3a-0ay`Tahi y PdWer ReWase Datm '\�o�' -�J Permit ftMbem Pyoled Addrem THE UNOERSIGNEQ HEREBY REQUEST RELEASE OF Ei ECMICAL POWER TO THE ABOVE DF.Sc L"D PROPERTY,FOR A P IOF)NOT TO QXCEFP THIRTY(M) GAYS,FOR THE PURPOSE OF'TESTING SYSTEMS AND EQUFPMENT IN PREPAtRA710lq FOR A.FML iPi PE . -IN G4NSi:D�RA"]10N OF APPROVAL OF THE mugsT we•mmsv ACWOW b.tiE Am Aom A5 OoumS: I. This tanprary power release is t�$uesteed for the a sad p ose only,and fitters will boa n0 00tupaney of any type,pater than that permitted by coi4buction during this lame period. 2. AS'vvi hm by our§igrmt urgs,Wt herEby.agree th abide by-all tenons and c ondfflons of this agmemerf, •inc Uolt�g Building Division•Policy;which is incorpora ed hmin hy`refemm. 3. Ali conditions:and reluitwents lisb-hd In the altkhed document entitled 9Requirements for 30 Day Power for Teftg"Have beers fulfilled and the premiW is ready for compran6a,inspection. 4. All ee'quests loran extension beyond 30 days.mu t.be:m We in malting to the Building�Of ial stating tote reason,far the request kfty may be n4meved ftm'the site ardfor a Stop Work Order Issued.if the Finaf•InspeWon has not seen approved within 30•days. A fee of$100.Efo-will be requlred fo ift the Stop Work Order. VILE HERESY RELEASE-AND AGREE TO HOLD HARMLES ,S. LU,CIE COUNTY,AND THEIR EMPLOYEES FROM ALL.LMII.IT ES AND.CLAIMS OF ANY TYPE OF NATURE Mai KAY AME NOW OR IN THE FaJ RE OUT OF TrffTl�A 1 1CFi.Nl ifVCLt<JDil�iC Ai1il'"t A,9A-C�Vfi CH-:MAYBE INCUk Fall=TO'HE DISCONNECTION OF EL P6 R woof;w L,i'[am or- AGREEmw. OV OWNER SI1 DATE •�flNTl��f?>t it DATE i7 �, . El.t_CMCAL COKM' C7M SIGMA" PE DATE'