Loading...
HomeMy WebLinkAboutProject Information • RECEI'.';D FEB 2 3 7017 is pepart Florida Department of RickScott • A�as I� Governor Environmental Protection 4L Carlos Lopez-Cantera SOUTHEAST DISTRICT OFFICE Lt. Governor 3301 GUN CLUB ROAD, MSC 7210-1 WEST PALM BEACH, FL 33406 Ryan E. Matthews 'mental pte 561-681-6600 Interim Secretary a February 16,2017 `` {� { 1 J�`y Regina Hellberg p MIN SETBACK REM 2633 SW Tanforan Blvd., R Port St. Lucie,FL 34987-2086 FRONTZ Sent via a-mail to: Hammerheadmarine&att.net SIDES MR SI REA Re: File No.: 56-0350960-001-EE File Name: Thorson Lift ZNG. �t Dear Ms. Hellberg: TEC On February 2,2017,we received your application for an exemption to install a boat lift adjacent an existing dock. The project is located in the Tributary off of North Fork St. Lucie river, Class III Waters, adjacent to 318 Holly Ave.,Port St. Lucie,FL 34952-1338 (Section 22, Township 36 South, Range 40 East),in St. Lucie County(Latitude N 27° 19' 53.61",Longitude W 80' 19' 55.46"). Your request has been reviewed to determine whether it qualifies for(1)regulatory exemption, (2) proprietary authorization(related to state-owned submerged lands), and(3)federal approval that may be necessary for work in wetlands or waters of the United States. Your project qualifies for all three. However,this letter does not relieve you from the responsibility of obtaining other federal, state, or local authorizations that may be required for the activity. 1. Regulatory Review—VERIFIED Based on the information submitted,the Department has verified that the activity as proposed is exempt under Chapter 62-330.051(5)(b),Florida Administrative Code,from the need to obtain a regulatory permit under part IV of Chapter 373 of the Florida Statutes. This exemption verification is based on the information you provided the Department and the statutes and rules in effect when the information was submitted. This verification will expire after one year, and will not be valid at any other time if site conditions materially change,the project design is modified, or the statutes or rules governing the exempt activity are amended. However,the activity may still be conducted without fir ther notification to or verification from the Department after the one-year expiration of this verification,provided: 1)the project design does not change;2)site conditions do not materially change; and 3)there are no changes to the statutes or rules governing the exempt activity. In the event you need to re-verify the exempt status for the activity after the one year expiration of this verification, a new application and verification fee will be required. www.dep.state.fl.us File No.: 56-0350960-001-EE • • File Name:Thorson Lift Page 2 of 5 Any substantial modifications to the project design should be submitted to the Department for review, as changes may result in a permit being required. Conditions of compliance with the regulatory exemption are contained in Attachment A. 2. Proprietary Review— NOT REQUIRED The activity does not appear to be located on sovereign submerged lands,and does not require further authorization under chapter 253 of the Florida Statutes,or chapters 18-20 or 18-21 of the Florida Administrative Code. 3. Federal Review—SPGP APPROVED Your proposed activity as outlined on your application and attached drawings qualifies for Federal authorization pursuant to the State Programmatic General Permit V,and a separate permit or authorization will not be required from the Corps.Please note that the Federal authorization expires on July 26,2021. You,as permittee, are required to adhere to all General Conditions and Special conditions that may apply to your project." A copy of the SPGP V with all terms and conditions and the General Conditions may be found at htip://www.saj.usace.gM.mil/Portals/44/docs/regulatory/sourcebook/perTnitting/ e� pennits/SP GP/SPGPV-Permit%201nstrument-Complete.pdDver=2016-07-27-071925-250. Authority for review-an agreement with the USACOE entitled"Coordination Agreement Between the U. S. Army Corps of Engineers(Jacksonville District)and the Florida Department of Environmental Protection,or Duly Authorized Designee, State Programmatic General Permit", Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act. Additional Information Please retain this letter. The activities may be inspected by authorized state personnel in the future to insure compliance with appropriate statutes and administrative codes. If the activities are not in compliance,you may be subject to penalties under Chapter 373,F.S.,and Chapter 18-14,F.A.C. NOTICE OF RIGHTS This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57,F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition,this action will not be final and effective until finther order of the Department. Because the administrative hearing process is designed to formulate final agency action,the filing of a petition means that the Department's final action may be different from the position taken by it in this notice. Petition for Administrative Hearing A person whose substantial interests are affected by the Department's action may petition for an administrative proceeding(hearing)under Sections 120.569 and 120.57,F.S. Pursuant to Rule 28- 106.201,F.A.C.,a petition for an administrative hearing must contain the following information: (a) The name and address of each agency affected and each agency's file or identification number,if known; (b) The name, address, any email address,any facsimile number, and telephone number of the petitioner;the name, address,and telephone number of the petitioner's representative, if any,which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner's substantial interests are or will be affected by the agency determination; FileNo.: 56-0350960-001-EE • • File Name:Thorson Lift Page 3 of 5 (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all disputed issues of material fact. If there are none,the petition must so indicate; (e) A concise statement of the ultimate facts alleged,including the specific facts that the petitioner contends warrant reversal or modification of the agency's proposed action; (f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency's proposed action,including an explanation of how the alleged facts relate to the specific rules or statutes;and (g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency's proposed action. The petition must be filed(received by the Clerk)in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard,Mail Station 35,Tallahassee,Florida 32399-3000. Also,a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing. Time Period for Filing a Petition In accordance with Rule 62-110.106(3),F.A.C.,petitions for an administrative hearing by the applicant must be filed within 21 days of receipt of this written notice. Petitions filed by any persons other than the applicant,and other than those entitled to written notice under Section 120.60(3),F.S. must be filed within 21 days of publication of the notice or within 21 days of receipt of the written notice,whichever occurs first. Under Section 120.60(3),F.S.,however,any person who has asked the Department for notice of agency action may file a petition within 21 days of receipt of such notice,regardless of the date of publication. The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing)under Sections 120.569 and 120.57,F.S.,or to intervene in this proceeding and participate as a.party to it. Any subsequent intervention(in a proceeding initiated by another party)will be only at the discretion of the presiding officer upon the filing of a motion in compliance with Rule 28- 106.205,F.A.C. Extension of Time Under Rule 62-110.106(4),F.A.C., a person whose substantial interests are affected by the Department's action may also request an extension of time to file a petition for an administrative hearing. The Department may,for good cause shown,grant the.request for an extension of time. Requests for extension of time must be filed with the Office of'General Counsel of the Department at 3900 Commonwealth Boulevard,Mail Station 35,Tallahassee,Florida 32399-3000,before the applicable deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon. Mediation Mediation is not available in this proceeding. FLAWAC Review The applicant,or any party within the meaning of Section 373.114(1)(a)or 373.4275,F.S.,may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1)or 373.4275,F.S. Requests for review before the Land and Water Adjudicatory Commission must be filed with the Secretary of the Commission and served on the Department within 20 days from the date when the order is filed with the Clerk of the Department. File No.: 5 6-03 50960-001-EEO File Name:Thorson Lift Page 4 of 5 Judicial Review Any party to this action has the right to seek judicial review pursuant to Section 120.68,F.S.,by filing a Notice of Appeal pursuant to Rules 9.110 and 9.190,Florida Rules of Appellate Procedure, with the Clerk of the Department in the Office of General Counsel,3900 Commonwealth Boulevard, M.S. 35,Tallahassee,Florida 32399-3000;and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate District Court of Appeal. The Notice of Appeal must be filed within 30 days from the date this action is filed with the Clerk of the Department. Thank you for applying to the Submerged Lands and Environmental Resource Permit Program. If you have any questions regarding this matter,please contact Bruce Kay at the letterhead address or at (561)681-6695 or by email at Bruce.Kay@dep.state.fl.us Executed in Palm Beach County,Florida. STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Monica Sovacool Environmental Manager Southeast District Enclosures: Attachment A- Specific Exemption Rule Attachment B-Newspaper Publication General Conditions for use of the Federal SPGP V Project Drawings,4 pages CERTIFICATE OF SERVICE The undersigned duly designated deputy clerk hereby certifies that this permit and all copies were sent on the filing date below to the following listed persons: FDEP—Monica Sovacool,Bruce Kay FILING AND ACKNOWLEDGMENT FILED,on this date,pursuant to 120.52,F. S.,with the designated Department Clerk,receipt of which is hereby acknowledged. February 16,2017 Clerk Date Attachment A Chapter 62-330.051 Exempt Activities. The activities meeting the limitations and restrictions below are exempt from permitting. However, if located in, on,or over state-owned submerged lands,they are subject to a separate authorization under Chapters 253 and 258,F.S.,and Chapters 18-18, 18-20, and 18-21,F.A.C., as applicable. (5)Dock,Pier,Boat Ramp and Other Boating-related Work— (b)Installation of private docks,piers, and recreational docking facilities, and installation of local governmental piers and recreational docking facilities,in accordance with Section 403.813(1)(b),F.S. This includes associated structures such as boat shelters,boat lifts, and roofs, provided: 1. The cumulative square footage of all structures located over wetlands and other surface waters does not exceed the limitations in Section 403.813(1)(b),F.S.; 2. No structure is enclosed on more than three sides with walls and doors; 3. Structures are not used for residential habitation or commercial purposes, or storage of materials other than those associated with water dependent recreational use; and 4. Any dock and associated structure shall be the sole dock as measured along the shoreline for a minimum distance of 65 feet,unless the parcel of land or individual lot as platted is less than 65 feet in length along the shoreline,in which case there may be one exempt dock allowed per parcel or lot. Attachment B File No.: 56-0350960-001-EE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION NOTICE OF DETERMINATION OF EXEMPTION The Department of Environmental Protection gives notice that the project to install a boat lift adjacent an existing dock has been determined to be exempt from requirements to obtain an Environmental Resource Permit. The project is located in the Tributary off the North Fork St.Lucie river,Class III Waters,adjacent to 318 Holly Ave.,Port St.Lucie,FL 349(Section 22, Township 36 South,Range 40 East),in St.Lucie County(Latitude N 270 19'53.61",Longitude W 80'19'55.467). A person whose substantial interests are affected by the Department's action may petition for an administrative proceeding (hearing)under sections 120.569 and 120.57 of the Florida Statutes. The petition must contain the information set forth below and must be filed(received by the clerk)in the Office of General Counsel of the Department at 3900 Commonwealth Boulevard,Mail Station 35,Tallahassee,Florida 32399-3000. Mediation is not available. If a timely and sufficient petition for an administrative hearing is filed,other persons whose substantial interests will be affected by the outcome of the administrative process have the right to petition to intervene in the proceeding. Intervention will be permitted only at the discretion of the presiding officer upon the filing of a motion in compliance with rule 28-106.205 of the Florida Administrative Code. In accordance with rule 62-110.106(3),F.A.C.,petitions for an administrative hearing must be filed within 21 days of publication of the notice or receipt of written notice,whichever occurs first. Under rule 62-110.106(4)of the Florida Administrative Code,a person whose substantial interests are affected by the Department's action may also request an extension of time to file a petition for an administrative hearing.The Department may,for good cause shown,grant the request for an extension of time. Requests for extension of time must be filed with the Office of General Counsel of the Department at 3900 Commonwealth Boulevard,Mail Station 35,Tallahassee,Florida 32399-3000 prior to the applicable deadline. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon. Upon motion by the requesting party showing that the failure to file a request for an extension of time before the deadline was the result of excusable neglect,the Department may also grant the requested extension of time. The petitioner shall mail a copy of the petition to the applicant at the address indicated above at the time of filing. The failure of any person to file a petition for an administrative hearing within the appropriate time period shall constitute a waiver of that right. A petition that disputes the material facts on which the Department's action is based must contain the following information: (a) The name and address of each agency affected and each agency's file or identification number,if known; (b) The name,address,and telephone number of the petitioner;the name,address,and telephone number of the petitioner's representative,if any,which shall be the address for service purposes during the course of the proceeding;and an explanation of how the petitioner's substantial interests are or will be affected by the agency determination; (c) A statement of when and how the petitioner received notice of the agency decision; (d) A statement of all disputed issues of material fact. If there are none,the petition must so indicate; (e) A concise statement of the ultimate facts alleged,including the specific facts the petitioner contends warrant reversal or modification of the agency's proposed action; (f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency's proposed action;and (g) A statement of the relief sought by the petitioner,stating precisely the action that the petitioner wishes the agency to take with respect to the agency's proposed action. A petition that does not dispute the material facts on which the Department's action is based shall state that no such facts are in dispute and otherwise shall contain the same information as set forth above,as required by rule 28-106.301. Under sections 120.569(2)(c)and(d)of the Florida Statutes,a petition for administrative hearing shall be dismissed by the agency if the petition does not substantially comply with the above requirements or is untimely filed. Complete copies of all documents relating to this determination of exemption are available for public inspection during normal business hours,8:00 am.to 5:00 p.m.,Monday through Friday,at the Southeast District office,3301'Gun Club Road,MSC 7210-1,West Palm Beach,Florida 33406. General Conditions for Federal Authorization for SPGP V 1. The time limit for completing the work authorized ends on July 26,2021. 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third parry in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer,you must obtain a modification of this permit from this office,which may require restoration of the area. 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit,you must immediately notify this office of what you have found.We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 4. If you sell the property associated with this permit,you must obtain the signature of the new owner on the enclosed form and forward a copy of the permit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issued for your project,you must comply with the conditions specified in the certification as special conditions to this permit. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit. Further Information: 1. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal projects. 2. Limits of Federal Liability. In issuing this permit,the Federal Government does not assume any liability for the following: a.Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b.Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c.Damages to persons,property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d.Design or Construction deficiencies associated with the permitted work. e.Damage claims associated with any future modification, suspension, or revocation of this permit. 3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided. 4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include,but are not limited to,the following: a.You fail to comply with the terms and conditions of this permit. b.The information provided by you in support of your permit application proves to have been false,incomplete, or inaccurate(see 3 above). c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. 5. Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office,and if you fail to comply with such directive,this office may in certain situations(such as those specified in 33 CER 209.170)accomplish the corrective measures by contract or otherwise and bill you for the cost. 6. When the structures or work authorized by this permit are still in existence at the time the property is transferred,the terms and conditions of this permit will continue to be binding on the new owner(s)of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions,have the transferee sign and date the enclosed form. 7. The Permittee understands and agrees that,if future operations by the United States require the removal,relocation, or other alteration, of the structures or work herein authorized,or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters,the Permittee will be required,upon due notice from the U.S. Army Corps of Engineers,to remove,relocate,or alter the structural work or obstructions caused thereby,without expense to the United States. No claim shall be made against the United States on account of any such removal,relocation or alteration. STANDARD MANATEE CONDITIONS FOR IN-WATER WORK 2011 The permittee shall comply with the following conditions intended to protect manatees from direct project effects: a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act,the Endangered Species Act,and the Florida Manatee Sanctuary Act. b. All vessels associated with the construction project shall operate at"Idle Speed/No Wake" at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede-manatee movement. d. All on-site project personnel are responsible for observing water-related activities for the presence of manatee(s). All in-water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving. e. Any collision with or injury.to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336)for north Florida or Vero Beach (1-772- 562-3909)for south Florida, and to FWC at ImgeriledSpecies(w-mvFWC.com f. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission(FWC)must be used (see MyFWC.com/manatee). One sign which reads Caution:Boaters must be posted.A second sign measuring at least 81/2" by 11" explaining the requirements for"Idle Speed/No Wake" and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. Questions concerning these signs can be sent to the email address listed above. UNITED STATES DEPARTMENT OF COMMERCE T of National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE Southeast Regional Office 263 13th Avenue South St.Petersburg,FL 33701 �+res nab` SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS The permittee shall comply with the following protected species construction conditions: a. The permittee shall instruct all personnel associated with the project of the potential presence of these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction personnel are responsible for observing water-related activities for the presence of these species. b. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the Endangered Species Act of 1973. c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot become entangled, be properly secured, and be regularly monitored to avoid protected species entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical habitat without prior agreement from the National Marine Fisheries Service's Protected Resources Division, St. Petersburg,Florida. d. All vessels associated with the construction project shall operate at "no wake/idle" speeds at all times while in the construction area and while in water depths where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will preferentially follow deep-water routes(e.g.,marked channels)whenever possible. e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily construction/dredging operation or vessel movement, all appropriate precautions shall be implemented to ensure its protection. These precautions shall include cessation of operation of any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of the equipment. Activities may not resume until the protected species has departed the project area of its own volition. f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported immediately to the National Marine Fisheries Service's Protected Resources Division(727-824-5312) and the local authorized sea turtle stranding/rescue organization. g. Any special construction conditions, required of your specific project, outside these general conditions,if applicable,will be addressed in the primary consultation. h. Any collision(s)with and/or injuries to any whale,or sturgeon occurring during the construction of a project, shall be reported immediately to NMFS's Protected Resources Division(PRD) at(727- 824-5312). i. Reports to NMFS's Protected Resources Division (PRD) may be made by email to takere ort.nmfsser oaa. ov. j. Sea turtle and marine stranding/rescue organizations' contact information is available by region at hLtp://www.mnfs.noaa.ggK/pr/health/networks.htin. k. Smalltooth sawfish encounters shall be reported to htW://www.flmnh.ufl.edu/fish/sharks/sawfisb/sawfishencounters.html. 1. All work must occur during daylight hours. Nd" ❑ x vhttps:in•.xv,.google.com`mapsrplacer3lE-Holly--'ve,p- C,i DEPQuickLinhjDepnet —People First T'Map Direct Gateway _ Map Direct Standard Map? 7318HollyAve-Goog...x Lr File Edit View Favorites Tools Help _ tC N T 1 0 A, 1r L7 q I?ermit`N"timber G � 56 0350960-001-EE q Southeast 4)ts,O-ict Z . ANKOFlA a 's' T318 Holly Avenue n 1Sc tJ T 0 r, ami, "` ''arc•cta Sr r Mti A., u ,f r.;v M—n A,e Y - n 1'1K ^, fie. Sw Prima Viat:r 6i•:, 'nft:, ,W v o'C AIR y I� $:'t Lur_.m+ar yg C Fl lvnr Park &VJLakehhr�tOr a 5 = } 1 cs ti,acam a¢e w Du-1 A- SW[1::.a1 A, �^ _ Spanish Lakes ^2 µ StCtltictf-;v %y it C` Golf Vdloyo e Port St Lucie s�`.l�a Ses ,•.. High School c GQ-=gl,e of t`,y dF 'C'r Mapdatal=i7l3w4e Terms Sendfeedback 2000ftr - ❑ x v https:lfwwiagooglecom+maps!placerot3.Holly-Ave;}Q- d „y DEPQwckLmks 0e net People 7Ma Q" I__.. P P P Direct �MapOired Standard Map v 318HollyAve-Goog...k {ru t File Edit View Favorites Tools Help _.� Y a: a, ham' �L t' s— qt Lot 19, Block 19 z S30'20D00"6 fS.' S3082a'00"E i 55:05'(By Cal Fence: 5troddhng Lot Lire S30`47'26"E 155.t W M - � M► N 6 .7' W o ° N v 0 250. 00 Steps B r r• O� tn Oo :-Pock Deck 4. Lot 20 Block 79 O. y. Pool M Shed }}�!+ 'k No Slab In e g'(M) R. W �D CA Ln v i R o N 0.4 51RC N � 162.471P) j?e1 ZLa ti 3 3 W u �.-Edge of Water ck 19 0 .a 4y 21, gio x o. O u E C 4 Lot. f m o az r c�0 W b • I E M C y 3 Q OA • • ACE ENGINEERED 4 POST, 2 MOTOR BOAT LIFTS 4� gvT 0 16 Q PILE SPACING CHART q The boat center of gravity Permit Number G needs be set the center off the top beam 56-0350960-001-EE lUft Capacity '1'Dimension�r Dimension�je Q Diameters Z Lb. Kg. FL M Ft M in. Mm O G 10 3 Southeast District Z H i,oDD 30 1 .35 1z 3a B 203.2 ~ 10 000 4540 12.5 3.81 12 3.66 14 000' 0 10 254 �f 16.000 7257 14 4.27 UI- 1 2 4 OD0 t 0 0 4.88 1627 16 4.88 12 304.8 D G H STRUCTURAL ENGINEERING REWEW E THIS CONSfAUCTION HAS M--94 DESIGNED ASA MAIN WIND FORCE RESISTING SYSTEM.WITH CALCULATED GRAVTIYAND WIND LOADS IN COMPUANCE WITH THE FLORIDA BUILDING CODE 2014.CHAPTERS 18&20,ADM 2010.ASCEISEI 7-10, • AND'MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES'TO • WITHSTAND THE WIND LOADS ASSOCIATED WITH AN ULTIMATC WIND SPEED OF C i 180 MPH,EXPOSURE'D',RISK CATEGORY•I'.ARNOLDISANDERS CONSULTING ENGINEERS HAS NO CONTROL OF THE MANUFACTURIN-J,PERFORMANCE,OR INSTALLATION OF THIS PRODUCT.THESE GENERIC PLANS WERE£NGNEERED IN J ACCORDANCE Wn H ACCEP IEU H4GINEEHING 0N01ICES AND DATA P.90MEU BY THE MANUFACTURER, 13 • • AMCWS&M.Cana aim Cnalnews.Ira J L:h'A£Ttr',� i C I Cad&w..1A.1twlsalbn0451 Rog.nadda No W61 12MI Ak&oW 814 SMIa 1(a R,Myem,FL33919 237.W7-M Doi-. E' SIGNATURE NOT VALID WITHOUT RAISED SEAL COOT 1 �NC2 CO STAINLESS STEEL PILING E$PPC STAINLESS STEFi uc s REWS 0 Pik USED TO CONNECT THE fo BRACKETS TO THE PILING AND A 2-36" CARRIAGE BOLTS USED A TO CONNECT THE BRACKETS TO THE LIFT CHANNELS 0 0 NOTE-, THIS STRUCTURE WILL WITHSTAND WIND LOADS ASSOCIATED WITH AN ULTIMATE WIND SPEED OF 180 MPH, EXPOSURE "D", RISK CATEGORY ' I ' CALCULATED PER F.B.C. 2.014 AND ASCE/SEI 7-10. BOATS SHALL NOT BE STORED ON LIFT DURING HIGH WIND EVENTS, IN GENERAL, PILING PENETRATION TO BE 10' INTO THE SAND BOTTOM OR 5' INTO THE ROCK STRATA. SUB-SURFACE CONDITIONS CAN VARY GREATLY, THE CONTRACTOR SHALL VERIFY ALL PILE CAPACITIES. ALL PILINGS TO BE 2.5 C.C.A. PRESSURE TREATED WOOD. O O O O TOP BEAM CHANNEL CRADLE I-BEAM BUNK CABLE 0 LIFT CAPACITY 2 EACH 2 EACH BOARDS CABLE SIZE SPREAD POST ERGS SHAFT WINDER A M�{p� INCHES PILING Lbs Kp INCHESMM INCHESMM (PT) I HE MM IN MM HGTH VOLTAGE PER MIN SIZES 4Hx,15 I01.6hx3,8mm 6Hx.19 152.4hx4.6mm 2.3J4HP 4,500# 2041 kg 2 W x.23 50.Bw x 5.8mm 4 W x.29 101.6w x 7.4mm .120V 20A 140"OAL 3.6m DAL 120'LGTH 3.05m OAL 5 16• 4.7.9 �• 2.5m 240V/t0A 4q / 0Lrtt0 W 27' g�UTA + 5 H x.15 127h x 3.8mm 6 H x.19 152Ah x 4.8mm x15'ST ST x4.6m ST 5T 2-y1�Hp 685,8mm 2�.2 mm 7,000# 3175 kg 2.25 W x,26 57.2w x 6.6mm 4 W x.29 101.5w x 7Amm 1 PART 1 PART 120V OA P x 153"OAL x 3.9 m AOL 144'LGTH 3.8 m OAL 240/10A 6 Hx.17 152Ahx4.3mm 8 H x.23 2032hx 5.6mm m 2-3/4 HP y y .. 10,000# 4536 kg 2.5 x.29 63.5wx7.4mm 5 W x.35 127w x 8.9mm o 120V�20A x 1531DAL 3.9m DAL 1501 LGTH 3.8 m OAL 3 a g y 240V/10A DIA 7 H x.17 177.Bhx4.3mm 6 H x.25 203.4h x 6.4mm 4-5 16' 4-7.94 mH 110' 2.8m mm t 14,000# 6350 kg 2.76 W x.28 69.9wx7.4mm 5 W x.41 127w x 10.4mm 20PARTT x92 mARTC 317.5mm i x 153.OAL 3.9 m OAL 150'LOTH 3.8 m DAL a 8 H x,19 203.2hx4,8mm 10 H x 25 254hx 6.4mm 'oo 16,000# 7257 kg 3 W x,35 76.2wx8.9mm 6 W x Al 152.4wx1IDAmm � c CL 2-1 HP x 153"OAL 3.9 m OAL 168,LGTH 4.3 m DAL �/2 8 H x 25 203.2hx6.4mm 1 D H x.25 254hxBAmm N y 240U/10A i .i 20,000# 9071 kg 95.3wx10.4mm 6 W x.41 152.4wx10.4mm N cc 3.75Wx,41 122. 9.1m c _. b9. x 177OAL 4.5 m OAL 192'LGTH 4.9 m OAL g, x45'S75T 3.7�n ST 5T r �� 11�� OIA 8 H x,25 203.2hx6.4mm 10 H x 29 254hx7.4mm 3 PART 3 PART 228.6mm 30gA mm I 24,000# 10886 kg 3.76 W x.41 95.3wx10,4mm 6 W x.50 152.4wx12.7mm 16 x 201 OAL 5.1 m DAL 192'LOTH 4.9 m OAL 134. 3,4m PUB.9-28-2015 i Ace Boat Lifts, 7990 Mercantile St., North Fort Myers, FL 33917 1 i