Loading...
HomeMy WebLinkAboutEnergy Code' Component Performance Method for Commercial Buildings Form 400B-97 ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs r . FLA/COM-97 Version 2.2 PROJECT NAME_TRI-COUNTY FEEDS___________ PERMITTING OFFICE: ADDRESS: ST. LUCIE COUNTY, _________ _Fort Pierce ________________ FORT PIERCE, FL CLIMATE ZONE: 6 ----------- OWNER: ___________ PERMIT NO: _XXXX____ AGENT: _SAME _' JURISDICTION NO:_661100____ BUILDING TYPE: _Service Establishments_____ CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: Building__________ _Finished CONDITIONED FLOOR AREA: _2200________------------- NUMBER OF ZONES: 1 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 5 --------------------- • COMPLIANCE CALCULATION: METHOD B DESIGN CRITERIA RESULT ------ ----------------- ^ENVELOPE PERFORMANCE ------ 24-::32 -------- 63.21 PASSES OTHER.ENVELOPE REQUIREMENTS PASSES LIGHTING INTERIOR LIGHTING 680.00 683.59 PASSES EXTERIOR LIGHTING 120.00 576.00 PASSES LIGHTING CONTROL REQUIREMENTS PASSES HVAC EQUIPMENT COOLING EQUIPMENT 1. SEER 10.00 10.00 PASSES HEATING EQUIPMENT 1. Et 1.00 N/A AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS 1. With Insulated Roof 6.00 6.00 PASSES REHEAT SYSTEM TYPES USED NO REHEAT SYSTEM is USED WATER HEATIdd EQUIPMENT . PIPING INSULATION REQUIREMENTS --------------------------------------------------------------------------=- COMPLIANCE CERTIFICATION: I hereby certify that the plans and specifications covered by this calcu- lation are in compliance with the Florida Energy Efficiency Code. PREPARED BY: DATE: -=sy` _=3E I hereby certify that this building is in compliance with the Florida Energy Efficiency Code ,y� -' OWNER/AGENT: �1 -- --------- DATE :------- -` �= Review of the plans and specifica- tions covered by this calculation indicates compliance with the Florida Energy Efficiency Code. Before construction is completed, this building will be inspected for compliance in accordance with Section 553.908, Florida Statutes. BUILDING OFFICIAL: DATE: I BUILDING ENVELOPE SYSTEMS UUM111-'L1h1a1JL, CHECK .:---------- ------------- - 401.------GLAZING--ZONE• 1------------------------ ' `Area(Sgft)I Elevation Type U Sc VLT Shading ----- ----------I ____ ` North Commercial 0.58 .59 .47 Continuous Ove I 301 North Commercial 0.58 .59 .47 Continuous Ove Ove 601 West Commercial 0.58 .59 .47 Continuous Ove 42I " West Commercial 0.58 .59 .47 Continuous Continuous Ove 81 West Commercial 0.58 .59 .47 Total Glass Area in Zone 1 = 1821 Total Glass Area = 1821 --------------------I--.- 402.------WALLS--ZONE- 1--------------------- U Insul R Gross(Sgft)I Elevation Type -__________I -----------4 ____ ____ _____ . North 8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 1 East 8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 4 3601 South 8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 540 West 8"CMU/3/4"ISO Btwn 24"oc/5/8"Gyp 0.151 4 1 18001 Total Wall Area in Zone 1e001 Total Gross Wall Area.= 403.------DOORS--ZONE 1---------------------- U Area(Sgft)I Elevation Type --- - ------------_I -- ------------------------------>----- North 1-3/4 GLASSDOOR 1.3 1.3 421 ,421 West 1-3/4 GLASSDOOR Total Door Area in Zone 1 = 84I Total Door Area = 841 404.------ROOFS--ZONE 1-------------- Insul R Area(S,gft)l Color- U Type ------- ---------,-I ___ ______ Sngl Ply/2"Iso/2" Conc/Mtl Deck Light .065 30 1 = 24001 I Total Roof Area in Zone Total_Roof_Area-=24001 405.------FLOORS-ZONE 1----------_-_^^--- Insul R Area($gft)l Type ----------I ------------------ ---- ----------- ----------- ----------- Slab on Grade/Uninsulated 0 1 = 24001 24001 Total Floor Area in Zone = 24001 Total Floor Area 406.------INFILTRATION ------------------------------ -------------------.-I--- ICHECKI Infiltration Criteria in 406.1.ABCD have been met. I I MECHANICAL SYSTEMS CHECK ------------------------------------------ ------------- ----------1-----I--- HVAC load sizing has been performed. (407.1.ABCD) I I I --- 407.------COOLING SYSTEMS -------------------- -- ---------------�--------- IPLV Tons I , No Ef-ficienc - _ -------------- Type - -w--- --- --------- I ------------------- 1 10 10 5,001 1. Split System 408.------HEATING SYSTEMS-------------------'T ---7 BTU/hr1 Effie Type --------------I 1.0 340001 1. Electric Resistance 1 409.------VENTILATION -------- ICHECKI Ventilation Criteria in 409.1.ABCD-have been met. I I 410.-----AIR DISTRIBUTION SYSTEM ----------------------------------------- I--- CHECKI --=---------------p-----�-- Duct sizing and design have been performed. (410.1.ABCD) 1 I R-valuej AHU Type Duct Location ------------- -- I 1. Constant Volume With Insulated,Roof 61 CHECKI ------------------------- --------------- Testing and balancing will be performed. (410.1.ABCD) I, I --1--- 411.-----PUMPS AND PIPING -ZONE ---------------------------------__ - Basic prescriptive requirements in 411.1.ABCD have been met. I I PLUMBING SYSTEMS 411.-----PUMPS AND PIPING -ZONE I ----------------------------------- -Type R-value/in Diameter -----=-----------=----•-------- Thicknessl ---------I 1. Non -Circulating 1 412.-----WATER HEATING -SYSTEMS -ZONE 1-------------------------- -------'-'I--- Type Efficlency StandbyLoss InputRate, -------------------------------- ---- -___ .---- Gallons) ---------- ELECTRICAL SYSTEM$ CHECKI 413 . -----ELECTRICAL POWER DISTRIBUTION-=- - ----^----I--------- ------ Metering criteria in413_1_ABCDhave been met. 1 I • 41 MOTORS-------- - - -----^-------------- Motor efficiencies in 414.1.ABCD have been met. 1 I - _ 415.-----LIGHTING' SYSTEMS -ZONE 1---- ----.. -----1 ...---.-------_r No Watts �.------ I�-- Area(Sgft)l Space Type No Control Type I No Control Type 2 -_ ..__------- --------- I ------- --- ----- ---- Bulky Acti 1 On/Off 2 On/Off 1 680 22001 - Total Watts for Zone 168Q1 Total Area for Zone 1 r 22001. Total Watts 6801 Total Area 22001 10HECKI Lighting criteria in 415.1.ABCD have been met, I I -I-____I___ ----------------=-----',----.T_-------- 16.. Operation/maintenance manual will be provided to owner.(102,1)1 ^-_I--- • - - - --- - - - - - -- - - - -- - - - - - -. " R .! - - - - _