Loading...
HomeMy WebLinkAboutPower Release 12-14-'20 10:34 FROM- 7728787656 T-627 P0001/0001 F-056 <:>r pla nn1Vrq,&-D& do in S. ees h .. Bt i fib W C :Ragu iitila►rs Division 2341ixiia Awe: . 772-462-21-65 >r ax 772 462-6443 Request for'30-Day Tempomry'Power Release Date. \ -� Pry Address. THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL.POWER:TO THE ABOW DESCRIBED PROPERTY,FOR A PERIOD NOT TO EXCEED THIRTY.(3�,a),PAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN'PREPARATION FOR..A'FINAL INSPECTtON. IN CONSibERATIOPI OF APPROVAL OF THE REQUEST VVE HEREBY ACKNOWLEDGE Alb AGE AS FOLLOWS; t, This tBmPoiary povuerrelease is requested fbr the above s3@Wd pose only,and belt:wm be no occupancy of any tYpe,ether than that p.e"ltted by con.sArWion duo6g1his time period. 21 As-witness by our signOuts,we hereby agreee W abide by all tL-ms and-conditions of this agreement, including Building Division ftliCy,which is.incorporated herein by reference. 3. All conditsons'and requireiieriL-,lisred.in the attached doolment entetltd"Requirements for 30 Day, Power for Testingff have beery fiAt'ilred and the premise.is ready for cofnpliance inspection. 4. All requests for an extension beyond 30 days MM.be'made in writing to the Building Official stating the mason far the guest. Power may be relboved from the site and/or a Stop Wo*.Order issued if the Fnal'Inspection has not been approved within 30 days. A fee of 100.00 will be required to lift the Stop Work Order. WE HEREBY RELEASE AND AGREE.TO HOLD HARMLESS,57; LUGIE COUNTY,AND THEIR EMPLOYEES FROM ALL LIABTLI[ZES AND CLAIMS OF ANY TYPE OF NATURE V4,►FKH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACT10N,INCLUDING ANY DAMAGE WHICH'MAY BE I NCURED DUE TO THE DISCOMECTION OF ELEC CAL POWER 94 T14F EVENT'OF VIO AMON OF THIS AGREEMENT. 77� �- OWNER SI DATE ' ' CONTRACTOR DATE ELlrCTRICAL CONTRACTOR SIGNA'f-IRE DATE